Stream Mapping: A Primer - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Stream Mapping: A Primer

Description:

Transportation Andy McDaniel. Ecosystem Enhancement Colleen Kiley. Program. Water Quality in the Field Periann Russell / Ian McMillian. Water Quality in the Cam McNutt ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 17
Provided by: joes152
Category:

less

Transcript and Presenter's Notes

Title: Stream Mapping: A Primer


1
Stream Mapping A Primer
  • 2007 North Carolina
  • GIS Conference

2
Outline
  • Background Joe Sewash
  • Technical Issues Scott Edelman
  • Transportation Andy McDaniel
  • Ecosystem Enhancement Colleen KileyProgram
  • Water Quality in the Field Periann Russell / Ian
    McMillian
  • Water Quality in the Cam McNuttFuture
  • Wrap-Up and Discussion Joe Sewash

3
Background
  • Stream Mapping Working Group
  • Four meetings in late 2004
  • Requirements Survey / User Requirements Summary
  • Stream Mapping Implementation Plan
  • Submitted to the NC Legislature in January 2005
  • Endorsed by GICC and presented to the General
    Assemblys Environmental Review Commission in
    January 2005
  • Statewide implementation over five year period

4
Background
  • A new dataset with improved horizontal accuracy
    provides many benefits to agencies as well as the
    general public. These benefits include but are
    not limited to improvements in
  • Stream Restoration and Buffering
  • Permitting
  • Flood Assessments
  • Watershed Delineation and Modeling
  • Regulatory Activities such as Mitigation
  • Water Quality Enhancement and Planning
  • Viewing Map Data and Map Production
  • Planning for Emergency Response to Disasters
  • Endangered Species and Natural Resource Management

5
Background
  • NC Ecosystem Enhancement Program (NCEEP), NC
    Department of Transportation (NCDOT)
  • Current mitigation estimates fall around 1.5
    million feet for the next three years, a twenty
    percent underestimation would mean that an
    additional 300,000 linear feet of stream would
    need mitigation. That would be approximately
    100,000 linear feet a year, or an additional 20
    million worth of restoration each year.
  • If the new maps were to produce just a two
    percent increase in NCEEP staff efficiency during
    the next three years, NCEEP could provide
    approximately an additional 30,000 additional
    feet of stream mitigation credits to meet NCDOTs
    needs. The additional mitigation credits would
    be worth approximately 6,150,000.

6
Background
  • City of Durham
  • Review and approval of site plans would take
    staff less time to complete. Assuming the
    midpoint salary of a senior technician (47,000)
    multiplied by 1.7 for benefits, training, etc.
    results in a yearly cost to the City of 215,730
    to perform this task. The new statewide digital
    surface waters file would save the City of Durham
    215,730 per year.
  • NC Wildlife Resources Commission (NCWRC)
  • Environmental permit review time would be
    reduced. NCWRC staff currently spends 1,568 days
    to handle 2,746 permits. These numbers are based
    on 2003-2004 data provided by the NCWRC. Review
    time would be reduced by 15 minutes per permit.
    The total time savings is 686.5 hours. The
    review labor rate is 30/hr. The new digital
    surface waters file would save the NCWRC 20,595
    per year.

7
Background
  • US Geological Survey
  • The time to calculate flood frequency
    statistics at an ungaged site on a stream could
    be cut from 16 hours of manual calculation to 15
    minutes with full coverage 124K NHD available
    for computer processing. At a burdened 60.00
    per hour for a hydrologic technician, that is a
    difference in dollars of 240.00 per manual
    calculation versus 15.00 per computer
    calculation. With about 100 such calculations
    being done each year at USGS, the savings would
    be around 22,500 annually.
  • NC Division of Coastal Management (NCDCM)
  • During the fiscal year ending 6/30/04, DCM
    field staff reviewed 171 Major Permit
    applications, 2,373 General Permit applications,
    and 24 General Permit applications for coastal
    wetland impacts. If all water body
    classifications were included as attributes in
    the streams layer or in a linked table, DCM field
    staff could save 30 minutes or more per permit.
    With 1,284 hours in a year and a current average
    salary for field staff of 18.46 per hour, the
    yearly savings would be 23,702.

8
Background
  • Hurricane Recovery Act
  • 19 Western North Carolina Counties impacted by
  • Stream Mapping is one of many projects involved
  • Completion date of May 2007

9
(No Transcript)
10
Background
  • CGIA Roles
  • Project Management
  • Facilitate Advisory Committee
  • Completion of 24K NHD units

11
Frequently Anticipated Questions
  • Where can I find more information?
  • How can I begin using the data?
  • How will the data be maintained?
  • When will the rest of the state be complete?

12
Frequently Anticipated Questions
  • Where can I find more information?
  • www.ncstreams.net
  • www.nconemap.net

13
Frequently Anticipated Questions
  • How can I begin using the data?
  • Data availability
  • Personal Geodatabase
  • WMS/WFS services via NC OneMap
  • Support for maintenance and sharing of business
    data independent of geometry
  • Stream Mapping Application
  • Thin-client access to data and linked attributes

14
Frequently Anticipated Questions
  • How will the data be maintained?
  • NHD Stewardship Agreement
  • All updates flow through NC
  • Stream Mapping Data Maintenance Plan
  • Document business requirements and technical
    workflows
  • Cycle of updates will be driven by business
    requirements of the stakeholder community

15
Frequently Anticipated Questions
  • When will the rest of the state be complete?
  • Horizontal accuracy assessments will precede work
    in the piedmont and coastal areas
  • Dedicated coastal pilot for evaluating tools and
    workflow
  • Implementation plan calls for five year
    production schedule

16
General Discussion
Write a Comment
User Comments (0)
About PowerShow.com