MULTISTATION COOPERATIVE ASTEROID OCCULTATION SCIENCE WITH SWRI - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

MULTISTATION COOPERATIVE ASTEROID OCCULTATION SCIENCE WITH SWRI

Description:

Multi-station techniques are the current best methodology of enabling such a discovery ... DATA OBTAINED FROM INDIVIDUAL OBSERVERS, NOT MULTI-STATION. TECHNIQUE. 4 ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 29
Provided by: LMI147
Category:

less

Transcript and Presenter's Notes

Title: MULTISTATION COOPERATIVE ASTEROID OCCULTATION SCIENCE WITH SWRI


1
MULTI-STATION COOPERATIVE ASTEROID OCCULTATION
SCIENCE WITH SWRI
  • Paul D. Maley/IOTA
  • And
  • Bill Merline/Southwest Research Institute

2
BACKGROUND
  • -SwRI has innate interest in asteroid satellite
    discovery
  • -IOTA key goal is to discover/confirm asteroid
    satellites
  • -Multi-station techniques are the current best
    methodology of enabling such a discovery
  • -Proposal grew from presentation made by IOTA at
    Colorado conference in 2008

3
BEST DETECTION EVIDENCE
4
DATA OBTAINED FROM INDIVIDUAL OBSERVERS, NOT
MULTI-STATION TECHNIQUE
5
BEST EVIDENCE OF ONE OBSERVER AND MULTI-STATION
METHOD
6
PROJECT DEFINITION
  • IOTA TO DEFINE EVENTS OF INTEREST TO SWRI
  • IOTA TO DETERMINE ITS OWN PRIORITY
  • FILTER BY DISTANCE
  • IOTA TO DEFINE PROPOSED BUDGET FOR FUNDING ONCE
    SWRI FUNDING ESTABLISHED
  • SWRI TO CONSIDER PROPOSED EVENTS
  • SWRI CONFIRM CONDITIONS FOR FUNDING
  • IOTA PUTS INTO PLACE METHOD TO ASSURE PROPER
    EXECUTION BY MEMBERS

7
IOTA FUNDING CONCEPT-1
  • PAYING TRAVEL COSTS OR PARTIAL COSTS
  • EACH PERSON TREATED AS A CONTRACTOR TO SOUTHWEST
    RESEARCH INSTITUTE (SWRI)
  • REIMBURSEMENT IS TAXABLE TO EACH PERSON
  • IOTA DETERMINES WHO GETS FUNDING (TBD)
  • IOTA ASSURES THAT NO SUPPORT CAN BE VIEWED AS
    BOONDOGGLE

8
IOTA FUNDING CONCEPT-2
  • FUNDING TYPE 1 GAS MONEY
  • FUNDING TYPE 2 AIRLINE TICKET
  • IOTA FUNDING AUTHORIZED BY PI AND CO-PI IN
    CONCERT WITH IOTA

9
RESULTS EXPECTED
  • CHORD DATA FROM MORE THAN ONE STATION (TBD)
  • NEGATIVE DATA IS A POSSIBLE OUTCOME
  • REIMBURSEMENT NOT CONTINGENT ON NEGATIVE DATA BUT
    PLAN TO DEPLOY MUST BE APPROVED BY SWRI AND IOTA
    JOINTLY

10
PRIORITIZATION OF FUNDED EVENTS-1
  • HIGH PROBABILITY OF SUCCESS
  • MULTIPLE OBSERVERS
  • ENOUGH LAND COVERAGE
  • EXPERIENCED OBSERVERS ONLY

11
PRIORITIZATION OF FUNDED EVENTS-2
  • HIGH PRIORITY TARGETS
  • LARGE ASTEROIDS, MULTIPLE CHORDS OR SATELLITE
    PRESENCE
  • OBJECTS FOR WHICH THERE IS LITTLE OCCULTATION
    INFO
  • OBJECTS LARGER THAN 0.18 ARCSECONDS

12
PRIORITIZATION OF FUNDED EVENTS-3
  • OBSERVATIONS THAT MIGHT NOT HAPPEN WITHOUT
    FUNDING
  • E.G. KBOs

13
FUNDING CONCEPT OF MULTISTATION EXPEDITIONS
  • START DATE OCTOBER 1, 2010 (TBD)
  • EXAMPLE 1
  • 5000 PER YEAR FOR 4 YEARS
  • EXAMPLE 2
  • 2010 FISCAL YEAR 2000 TOTAL EXPANDING TO
  • 10,000 IN 2013

14
IOTA CAPABILTIES TODAY
  • STARS TO MAG 10 MIGHTY MINIS
  • STARS TO MAG 11.5 80MM REFRACTOR
  • STARS TO MAG 12.5 120MM REFRACTOR
  • MULTISTATION DEPLOYMENT
  • PRE-POINT FOR EARLY STATION SETUP
  • DATA RETURN MILLISECOND TIME ACCURACY WITHIN 30
    FRAMES/SECOND VIDEO
  • MOBILE DEPLOYMENT

15
CAVEATS
  • provided by S. Degenhardt. Actual magnitudes
    should be more like 9.5, 11, 12 under typical
    non-optimum conditions. Impacted by spectral bias
    toward red stars.
  • sky conditions with no unusual circumstances,
    i.e "standard" transparency (i.e. target is 35
    degrees or higher), no strong scintillation, no
    clouds
  • raw video with no enhancement needed for LiMovie
  • PC164EX-2 with Owl FR at fx0.5 standard extension
  • These numbers come from actual star measurements
    and LiMovie reductions

16
MULTISTATION READINESS (as of 8/1/09)
  • OPERATIONAL UNTENDED SITES MINI 80MM
    120MM
  • S.DEGENHARDT (TN)2016..5
    .1
  • D.DUNHAM (MD)13..9..6
    .2
  • P.MALEY (TX)66..3
    .1
  • R.NUGENT (TX)..200
    .0
  • E.IVERSON (TX)..20..1
    .1
  • B.SANDY(MO).10..1
    .0
  • T.REDDING(FL)300
    0
  • R.VENABLE(GA).500
    .0
  • T.GEORGE(WA)..300
    .0
  • S.PRESTON(W)5......00
    .0
  • ASSUMES 1 TENDED

17
ISSUES WITH MULTISTATION SYSTEM
  • NOT ALL USE STANDARD OPTICS
  • DEMONSTRATING SUCCESSFUL SETUP BY EACH OBSERVER
    (PRACTICE OPPORTUNITY)
  • TIME FOR SETUP RELATIVE TO EVENT TIME
  • COORDINATION WITH OTHER OBSERVERS
  • SAFETY/SECURITY OF SITES
  • POTENTIAL FOR THINGS TO GO WRONG INCREASES FOR
    EACH SEPARATE COMPONENT IN A SYSTEM
  • TIME PERIOD FOR STATIONS TO BE LEFT UNTENDED
  • LACK OF INDIVIDUAL GPS UNITS FOR EACH SITE
  • MASS INCREASES AS THE NUMBER OF STATIONS
    INCREASES IMPACT ON TRANSPORT

18
CANDIDATE ASTEROID OCCULTATIONS FOR 2010
  • CHOSEN BASED ON THE FOLLOWING
  • -STAR BRIGHTNESS
  • -PATH RELIABILITY (from Steve Preston)
  • -POTENTIAL WEATHER IN THE ZONE
  • -DELTA MAGNITUDE DROP
  • -EVENT DURATION
  • -STAR ELEVATION
  • -DISTANCE FROM THE MOON
  • -PROXIMITY TO TWILIGHT
  • -STAR SHOULD BE BRIGHTER THAN 11

19
RESULTS
  • FILTERED POTENTIALLY RELIABLE EVENTS WITH STARS
    BRIGHTER THAN 11.0 IN USA FOR MULTISTATION DEPLOY
  • RISK OF PATH SHIFT FOR OTHERS
  • BETTER ONES OCCUR EX-USA
  • 3 EVENTS HAVE HIGH POTENTIAL FOR SUCCESS

20
CANDIDATE 1
  • SEPTEMBER 30 (148) GALLIA/HIP43813
  • THURSDAY MORNING
  • TARGET MAGNITUDE 3.1 ALT 25 42 DEG FROM 53
    SUNLIT MOON DM10 DURATION 3 seconds
  • REQUIREMENTS MINI

21
PATH
22
CANDIDATE 2
  • OCTOBER 29 (96) AEGLE / TYC2849-00615-1
  • FRIDAY MORNING
  • TARGET MAGNITUDE 9.7 ALT 55 63DEG FROM 62
    SUNLIT MOON DM3 DURATION 13seconds
  • REQUIREMENTS 80MM or greater optics

23
PATH
24
CANDIDATE 3
  • DECEMBER 4 (375) URSULA/TYC3358-02411-1
  • SATURDAY MORNING
  • TARGET MAGNITUDE 10.0 ALT 41 NO MOON DM2.4
    DURATION 16 seconds
  • REQUIREMENTS 80mm or greater optics

25
PATH
26
PROJECT CONDITIONS
  • REQUIRES MULTISTATION DEPLOY WITH HIGH CONFIDENCE
    OF SUCCESS
  • DATA REQUIRED FOR POTENTIAL PUBLICATION
  • REQUIRES COMPLETE PATH COVERAGE including error
    zones
  • DATA MUST INCLUDE GPS TIMES WITH D AND R DATA
  • SOME TBD EXPENSES POTENTIALLY REIMBURSABLE WITHIN
    BUDGET RECEIPTS REQUIRED
  • PILOT TO BE ESTABLISHED FIRST
  • FUNDING FOR TBD OBSERVERS INITIALLY

27
FORWARD WORK
  • SwRI TO CONTINUE TO EVOLVE PLAN
  • INFORMATION TO BE POSTED ON LISTSERVER AT A
    FUTURE DATE (TBD)
  • ASSUMING THAT FUNDING AVAILABLE FOR X
    OBSERVERS, WE WILL PROVIDE NOTIFICATION
  • DEPENDENT ON RESULTS, FUTURE EXPEDITIONS MAY
    RECEIVE NO, SIMILAR OR GREATER SUPPORT

28
  • END
Write a Comment
User Comments (0)
About PowerShow.com