Mines, Demolitions - PowerPoint PPT Presentation

About This Presentation
Title:

Mines, Demolitions

Description:

Mines, Demolitions – PowerPoint PPT presentation

Number of Views:114
Avg rating:3.0/5.0
Slides: 15
Provided by: proceedi
Category:

less

Transcript and Presenter's Notes

Title: Mines, Demolitions


1
Office of the Project ManagerforClose Combat
Systems
  • Mines, Demolitions Non-Lethal Weapons
  • Conference Exhibition
  • Future Opportunities
  • 11 Sep 2003

Briefer Patricia L. Felth Title
Deputy Project Manager Phone
(973) 724-7921 Email
felth_at_pica.army.mil
2
PM Close Combat Systems
  • PM-CCS FY03 A year of change
  • PM-MCD PM-CCS
  • New PM DPM
  • New organization structure
  • Many new people (in PM Office,
    engineering support, JMC/FSC)
  • Major new mission assignments
  • Whole diverse new product lines
  • Many new contracts and suppliers

Not a well oiled machineYET But intensively
striving to create a cohesive whole
3
PM CCS Managed Items
As of 8/31/03
As of 8/31/03
4
PM CCS FY03 Program Funding (With Supplemental)

PRODUCT M
Mines 84.8
Countermines 79.2
Demolitions 52.8
Non-Lethal 53.5
Munitions Total 136.4
a. Grenades 56.8
b. Pyrotechnics 41.4
c. Shoulder Launched 14.2
d. Explosive Devices 24.0
EOD Equipment 10.7
   
GRAND TOTAL 417.4
PM-MCD
236.7M
NEWLY ASSIGNED PROGRAMS
85.1M FY03 SUPPLEMENTAL
72.5M
IRAQI FREEDOM FUND
70.7M
PM-CCS 417.4M
Munitions 32
Source FY03 Presidents Budget
5
PM-CCS Summary Funding Profile By Product Line
(03-09)
(M) FY03 FY04 FY05 FY06 FY07 FY08 FY09 Totals
Networked Munitions 84.8 88.9 138.1 202.1 239.8 21.1 24.5 799.4
Countermine 79.1 58.8 34.9 55.6 72.4 133.5 155.6 590.1
Demolitions 17.4 16.7 12.1 9.4 11.8 11.3 11.6 90.3
Munitions 74.4 61.0 59.9 71.7 77.9 71.6 67.1 483.8
Non-Lethal 5.8 0 0 0 0 0 0 5.8
EOD 10.6 9.4 9.7 11.3 9.3 9.9 10.0 70.4
TOTALS 274.1 234.9 254.8 350.3 411.5 274.4 269.9 2,042.9
Source FY04 Presidents Budget
6
PM CCS FY03 Contract Actions
Type Action M
New   43   111.0
Option   24   52.2
Incremental   12   77.0
Mod   19   30.43
Tasks (IDIQ TM)   17   .87
GOGO WO   9   12.44
TOTAL   124   283.1
By Procurement Site
M 1. Picatinny
47 119.0 2.
Rock Island 53
114.0 3. Other
24 50.1
Total 124 283.1
Source FY03 Procurement
7
PM-CCS Design Age Of Items Managed
M18 Smoke Grenade TC 1943 Used WWII, First
Developed 1915
M117 Booby Trap Simulator TC 1967 Used Vietnam
M68 MICLIC TC 1985 Used Gulf War
M21 Main Gun Simulator TC 1999
M700 Time Blasting Fuze TC 1958
Bunker Defeat Munitions TC 1994 Used Gulf War
M211 Infrared Flare Countermeasure TC 2002
M031 TNT Block Demo Charge TC 1968
M139 Volcano TC 1989
Bangalore Torpedo TC 1958 Used WWII, First
Developed 1912
M67 Hand Grenade TC 1970 Used Vietnam
Towed Volcano TC 2002
18
11
8
10
5
4
3
.
8
PM CCS Future Design Items Managed
APL/A Track I Spider TC 2005
GMENS TC 2003
Intelligent Munitions Systems TC 2012
ASTAMIDS TC 2008
APL/A Track III Rattler TC 2007
AT4 CS TC 2004
Future systems Use Complex electronics and
sensors
9
8
1
1
1
4
4
.
9
PM-CCS Overarching Acquisition Strategy
  • Long term (5 year) contracts
  • Best value competition
  • emphasizing technical capability/quality
  • Cooperation, collaboration among
    PM, contractors, Government Engineering team
  • Continuous product/process improvement
  • modernization of legacy ammo
  • Support for National Technology Industrial Base
    IAW Section 806

10
PM-CCS Ammunition Industrial Base Philosophy
  • The ammunition industrial base is dynamic
  • The base is where the current production is
  • Position long-term contract vehicles for all ammo
    families
  • with options for emergency needs
  • Know our suppliers
  • to critical component/ material level
  • Support supplier base in modernizing designs and
    processes
  • be willing to invest money
  • Address issues on exception basis (for example)
  • inadequate/unreliable source of supply
  • inadequate capacity for current/projected needs
  • Inadequate work for current supplier

11
PM CCS FY04 Contract Actions
Total Contract Actions 90
Total New Contracts 26
Demo
Countermines
Non-Lethal
Networked Munitions
Grenades
Pyros
Explosive Devices
Grenades
Shoulder Launched
Demo
Explosive Devices
Shoulder Launched
Pyros
Countermines
Munitions 18
Munitions 51
12
PM-CCS FY04 Top New Contracts for Mines, Demo
Non-Lethal
Product Line System/ Item(s) Type Work FY04 (approx. ) Yrs.
Pyrotechnics M206 CR Flare Production 20 M 5
Pyrotechnics IR Flare Production 15 M 5
Grenades M67 Hand Grenade Production 15 M 5
Grenades M228 Hand Grenade Fuze Production 10 M 5
Shoulder Launched Bunker Defeat Munitions Production 5 M 5
Shoulder Launched AT4 Production 5 M 5
Explosive Device C4 1¼ lbs Block Production 5 M
Pyrotechnics M74 Air Burst Simulator Production 5 M 5
Demolitions Explosive Cutter Production 3 M 5
Demolitions Detonating Cord Production 3 M 5
13
Closing Remarks
  • Big changes in PM-CCS
  • Still striving to learn, meet, cross-fertilize,
    unify
  • New Acquisition and Management Philosophies
  • Focus on modernization
  • Commitment to warfighter And
    Critical ammo supply responsibility
  • Open to industry ideas feedback
  • We aint perfect yet
  • were dancing as
    fast as we can!

14
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com