Title: OSG Deployment Preparations Status


1
OSG Deployment Preparations Status
  • Dane Skow
  • OSG Council Meeting
  • May 3, 2005
  • Madison, WI

2
OSG Initial Release Goals
  • Documented in OSG Doc 28
  • Reproduce Grid3 baseline in ongoing heterogenous
    grid
  • Add Attribute-based Authorization capabilities
  • Add Storage Services
  • Establish sustainable growth model

3
Operations Infrastructure
  • Core Grid3 services
  • GridCat/MonALISA servers being installed
  • Webpages still rudimentary
  • Mailing lists not fully operational
  • Metrics undecided
  • New services
  • Robustness under multiple versions unknown/manual
  • VOMS complications being worked out
  • Multiple monitoring options not resolved

4
OSG Software Package
  • Release Candidate from ITB received through VDT
  • First production cache created.
  • Needs installation and configuration instructions
  • Needs purge of obsolete Grid3 legacy references
  • Needs ties to OSG release requirements
  • No clear manpower pool to maintain above
  • Versioning process unclear and rudimentary

5
Compute Element
  • ITB functioning at Grid3 level
  • Not clear weve explored GRAM at load
  • Authentication and authorization remain complex
    to configure properly
  • Definition of Execution environment too loose
    (eg. are Globus client tools to be in PATH ?)
  • Connection to local storage and SRM interfaces
    unclear
  • Stick with Grid3 Environment variable conventions
    for this Release

6
Storage Element
  • Dropped from this software release
  • Few service instances expected mid summer

7
VOMS
  • Established VOMS manager contacts with most VOs
  • Interoperability with LCG deployment tenuous
  • Management of Roles and Groups poorly documented
    and not widely understood.

8
Operations Model
  • Operations Model needs to be finalized and
    accepted.
  • Method to do this unclear
  • Distributed Model still needs to be developed and
    tested
  • Current system mostly manual.
  • Not clear how the system will be automated and
    made more dynamic.
  • Responsibility for documentation unclear

9
OSG Governance
  • Bootstrap versions of required bodies/processes
    in place.
  • Have not been tested by operations.
  • Not clear how seen by outsiders
  • Not clear how well will handle growth

10
Deployment Plans
  • (Already seeing large growth of ITB)
  • May
  • SDSS, CMS earlybird, STAR
  • June
  • CMS, ATLAS, GLOW, GriPhyN, GADU
  • July
  • Unscheduled
  • LIGO, DZero, fMRI, GRASE, CDF