GLAST LAT Tracker Tower15 Pre-Ship Review
Luca.latronico_at_pi.infn.it INFN-Pisa
2
Tower 15 - Assembly and test highlights
tray17 replacement
  • September 19-21, 2005 (INFN-Pisa)
  • assembly of complete tray stack
  • incomplete cable set (C5 missing, C2 non-flight)
  • Sidewalls, alignment
  • September 29 Oct. 3, 2005 (Alenia-Roma)
  • TVAC (9/26-29)
  • VIB (9/29-10/3)
  • October 5-11, 2005 (INFN-Pisa)
  • C5 installation
  • C2 replacement
  • Solithane, EMI taping
  • Alignment verification, final CPT
  • Full EIDP details at
  • http//glast.pi.infn.it

tray to be replaced
3
Tower 15 configuration
  • Tower PN LAT-DS-00722 (rev3)
  • Tower SN 15
  • Environmental test performed with following
    configuration variations
  • C5 missing
  • C2-008 non-flight installed in place of C2-020
  • Delivery configuration notes
  • Kapton and poron foam as per LAT-DS-00722
  • 4 layers of Poron foam 0.037 THK used on Bottom
    and Top Tray (X) side (in place of 5 layers)
  • Alignment well within stay-clear
  • Measured mass 32.920 Kg

4
Tower 15 Open NCRs
  • INFN/PI-589 environmental test in non-flight
    configuration
  • the environmental tests were performed with a
    missing cable (C5) and 1 non-flight cables (C2),
    as agreed by an MRB
  • Full flight set provided after environmental test
    and installed before delivery
  • the NCR can be closed
  • INFN/PI-590 cold/hot power off/on not performed
  • The problem is due to a known and documented
    issue with resetting MCM (NCR 417) with missing
    cables
  • To avoid the many and unknown number of power
    cycle needed to re-establish a good configuration
    with as many readable layers as possible,
    hot/cold switch on and off were not performed
  • Update SLAC waiver LAT-XR-07340 to include tower
    15?
  • the NCR can be closed
  • INFN/PI-586 Vacuum level out of specification
  • The situation is similar to earlier TVAC tests
    and the proposal is to accept the test as for
    previous MRBs
  • Tower 8 performed TVAC test together with tower
    15 and its relative NCR was closed during tower 8
    preship review on 10/5
  • the NCR can be closed

5
Tower 15 - Efficiency
run 306001376 before env-test
taken in Alenia after TVAC
  • All layers well within spec (eff gt 98)
  • no changes in bad channels during env test
  • pre-ship data analysis underway results will
    be included in EIDP

6
Tower 15 - Bad channels behaviour
X0 and Y17 slightly exceed 16 during hot soaks
7
Tower 15 - noisy channels behaviour
Fluctuation are due to noisy channels