PHENIX Almost Ready for Physics - PowerPoint PPT Presentation

About This Presentation
Title:

PHENIX Almost Ready for Physics

Description:

Level-2 'physics' filtering will be turned on in next few days ... RICH FEE boards, PC-E LV supply, AeroGel LED, MuID LL1 fiber. Get HPSS transfers running ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 6
Provided by: cad53
Learn more at: https://www.c-ad.bnl.gov
Category:

less

Transcript and Presenter's Notes

Title: PHENIX Almost Ready for Physics


1
PHENIX Almost Ready for Physics
  • Tuning (mainly south muon) triggers
  • DAQ routinely at 6 khz event rate
  • can get to 7 khz soon
  • Level-2 physics filtering will be turned on in
    next few days
  • Final Run8 BBC trigger constants soon
  • Various minor things to fix on Wed Maintenance
    day
  • FCal South LED pulser (7-oclock tunnel)
  • RICH FEE boards, PC-E LV supply, AeroGel LED,
    MuID LL1 fiber
  • Get HPSS transfers running

2
Luminosity?
  • Monday evening store had about 45 khz BBC rate in
    our vertex cut (30cm) - just after rates
    stabilized
  • L 45khz/(2.26b x 0.88) 23 mb-1/sec
  • PHENIX vertex efficiency about 50
  • so about 46 mb-1/sec delivered
  • compare to CA goal 46/300 1/6.5

BBCLL1 (30cm)
day
3
Timing
Saturday
Some of this probably due to change in PHENIX
trigger mix
Monday
4
Vertex
Saturday
Monday
5
PHENIX background scintillator rates mostly scale
with interactions (ZDC in black, red/green 900,
blue/pink 700)
Vernier scan Sunday morning
Write a Comment
User Comments (0)
About PowerShow.com