VENTILATION%20ASPECTS%20OF%20INDOOR%20AIR%20QUALITY - PowerPoint PPT Presentation

About This Presentation
Title:

VENTILATION%20ASPECTS%20OF%20INDOOR%20AIR%20QUALITY

Description:

In 1989 the American Society of Heating, Refrigeration and Air Conditioning ... The assignee should have an outline of the system components in order to conduct ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 7
Provided by: engineer
Category:

less

Transcript and Presenter's Notes

Title: VENTILATION%20ASPECTS%20OF%20INDOOR%20AIR%20QUALITY


1
VENTILATION ASPECTS OF INDOOR AIR QUALITY
2
DILUTION VENTILATION FOR INDOOR AIR QUALITY
  • In 1989 the American Society of Heating,
    Refrigeration and Air Conditioning Engineers
    (ASHRAE) developed and adopted ASHRAE 62-1989,
    Ventilation for Acceptable Indoor Air Quality.
  • Refer to section 8.2 in the text book to learn
    various considerations ASHRAE considered to
    establish the standards.

3
HVAC COMPONENTS AND SYSTEM TYPES
  • While considering the ventilation aspects of HVAC
    systems, the type of system and its component
    should be reviewed in order to assess the
    potential sources of complaints regarding indoor
    air quality.
  • For detailed description of the various
    components refer to section 8.3.1 in the text
    book.

4
TYPES OF SYSTEMS
  • The different types of HVAC systems are single
    duct systems, dual-duct systems, multi-zone
    systems and special systems.
  • Selection of the type of the system will be based
    on the requirements to be met.
  • For details of various systems refer to section
    8.3.2 in the text book.

5
HVAC COMPONENTS, FUNCTIONS AND MALFUNCTIONS
  • Various factors such as outdoor air, dampers, air
    cleaning are taken into consideration.
  • For detailed description of various factors refer
    to section 8.4 in the text book.

6
HVAC COMPONENT SURVEY OUTLINE
  • Monitoring the IAQ within a building can be done
    by
  • - office individual
  • - building maintenance department
  • - outside
    environmental firm
  • The assignee should have an outline of the system
    components in order to conduct the survey.
  • For more details refer to section 8.5 in the text
    book.
Write a Comment
User Comments (0)
About PowerShow.com