LowTemperature Geothermal Power Generation with HVAC Hardware - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

LowTemperature Geothermal Power Generation with HVAC Hardware

Description:

A US$47B Company (2006) Within UTC, a unique synergy was achieved... Return via culvert ~ 8 F rise. Condenser EWT ~ 33 F - 52 F. Hot Water Cold Water ... – PowerPoint PPT presentation

Number of Views:106
Avg rating:3.0/5.0
Slides: 22
Provided by: sharyl3
Category:

less

Transcript and Presenter's Notes

Title: LowTemperature Geothermal Power Generation with HVAC Hardware


1
Low-Temperature Geothermal Power Generation with
HVAC Hardware
2
United Technologies Corporation
A US47B Company (2006)
Carrier
Otis
Pratt Whitney
UTC Fire Security
Sikorsky
Hamilton Sundstrand
Research Center
UTC Power
3
United Technologies Corporation
Within UTC, a unique synergy was achieved...
leading to the development and introduction of
a New CHP
Technology Solution
4
PureCycle Derivative Concept
PureCycle reverses air conditioning cycle
5
HVAC Component Synergy
Turbine Generator Carrier 19XR2
Vapor Compression Cycle (VCC)
Organic Rankine Cycle (ORC)
Required Modifications
Impeller
Nozzle
Impeller
Diffuser
Generator
Motor
TRANSMISSION
TRANSMISSION
EXIT
INLET
Oil Pump
INLET
Oil Pump
EXIT
19 XR225 Centrifugal Compressor
19 XR225 Radial Expansion Turbine
6
Modular Carrier Components
Turbine Generator Carrier 19XR2
Adaptation of Existing Hardware - Compressor vs.
Turbine Operation
Centrifugal Compressor OperationCut-away Of
Compressor Impeller (Spinning Clockwise) and
Diffuser (Radial Out-Flow Compressor)
Radial Expansion Turbine OperationCut-away Of
Turbine Rotor (Spinning Counter-clockwise) and
Nozzle Block (Radial In-Flow Turbine)
Impeller, nozzle and shroud only conversion
required
7
Modular Geothermal Power Plant
UTC Generator
UTC Turbine
UTC Power Electronics
UTC Supplier Pump Inverter
  • Modular Plug-n-play
  • Multiple units for larger plants
  • Rapidly Deployable
  • 16 Week Lead time
  • gt95 Availability

UTC Supplier Control Panel
UTC Evaporator
Pump
UTC Condenser
PureCycle 225 KW Geothermal power plant
90 UTC high volume off the shelf components
8
Organic Rankine Cycle
PureCycle Geothermal Power Plant
Geothermal Hot Water In Power Out
9
PureCycle Geothermal System
Hot Liquid Evaporator Cold Liquid Condenser
10
Equivalent emissions reduction
Avoided emissions for a 1.0 MW system
Annual Avoided NOx Emissions
Annual Avoided CO2 Emissions
Equivalent acres of forest
Equivalent number of cars
Tons
Tons
PureCycle 225s (95 capacity factor)
570
1,270
10.80
6,045
Wind (25 - 40 capacity factor)
2.86
150
335
1,585
Solar (14 - 32 capacity factor)
1.60
185
85
885
Each acre of forest assumed to absorb 1.3 tons
Carbon/acre/year (Ref International Panel on
Climate Change) Each car assumed to generate
38 lbm/NOx/year (Ref US EPA)
11
Bottom Cycle - Cascading
Estimated Performance PureCycle 2-on-1 Series
Cascade
300 F 450 GPM
170 F 450 GPM
225 GPM
225 F 450 GPM
225 KW
225 KW
To Re-Inject
From Resource
225 GPM
225 KW
300 F 170 F _at_ 450 GPM Net 675 KW output
(Average of 1.5 KW / GPM hot resource)
12
PureCycle Potential Markets
UTC Power is experiencing market traction in
geothermal arena
Oil Gas markets extends geothermal potential
13
Chena Geothermal Demonstration
CHENA POWER
14
Geothermal Demonstration
Chena Hot Springs - AK
  • Commissioned July, 2006 1st unit
  • 2nd unit in November 06
  • lt165F geothermal temp
  • 99.4 Availability

15
Hot Water Cold Water
  • 16 pipe - 3000 ft.
  • Cooling from Monument Creek.
  • Galley 33 Feet above power plant
  • Gravity feed lt 1700 gpm
  • No pump - no parasitic.
  • Return via culvert 8 F rise
  • Condenser EWT 33 F - 52 F.
  • 8 HDPE 3000 ft from well 7
  • Well depth 700 ft.
  • Production pump 200 ft.
  • 8 return to re-injection well.
  • Pipe is insulated and buried.
  • Producing 500 gpm for unit 1.
  • Pump parasitics 35 kW.

16
Chena Hot Springs Performance
8/23/07
  • Extremely stable operation
  • Cold temp affects gross power.
  • Hot temp doesnt vary.
  • 99.4 availability

17
Top Level Assembly
ESTIMATED DRY WEIGHT 10,000 kg (22,000 LBS)
CONDENSER
ELECTRONICS
3.2m MAX (10- 4)
TURBINE
EVAPORATOR
5.1m (16- 10)
2.1m (7- 5)
18
Raser Technologies
(3) 10.0 MW (135) 225 KW units
4/12/07
19
Raser Technologies
10 MW on up
  • Modular Plug-n-play
  • Multiple units for larger plants
  • Rapidly Deployable
  • 16 Week Lead time
  • High Availability
  • Expand w/ resource
  • Speed to Market

20
PureCycle Value Proposition Summary
  • Current Geothermal Market
  • Off-the-shelf production 16 week lead-time
  • Low to moderate temps new opportunities
  • Bottom existing plants under - utilized
  • Low cost modular skid minimize installed
    costs
  • Rapid deployment speed to market (mos not
    yrs)...
  • Full remote control no equipment operators
  • Full service contracts 5 yr schdled -
    unschdled
  • Multi-unit plant scalable power blocks
  • Deploy based on resource not financing
  • Extreme statistical availabilityin the nines
  • Future for PureCycle Nominal 1.0 MW class unit
  • Target Production End of 2008
  • Continue ramp 225 KW Expand production
  • Oil Gas proof Demo sites
  • UTC Long term capabilities 1,500 / shift (3)
    Factories

21
Thank you. Halley K. Dickey Sales
Manager Geothermal Business Development 909.838.62
35 Halley.Dickey_at_UTCPower.com Solving Tomorrows
Challenges with Todays Technology
Write a Comment
User Comments (0)
About PowerShow.com