YDSS Interceptor Sewer Project Information Package - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

YDSS Interceptor Sewer Project Information Package

Description:

Copy of Minister of Environment Letter dated Oct 1/04. Contents ... Fluvial and Erosion Assessment and Mitigation - John Parish / Kim LeBrun. Parish Geomorphic ... – PowerPoint PPT presentation

Number of Views:103
Avg rating:3.0/5.0
Slides: 13
Provided by: dant179
Category:

less

Transcript and Presenter's Notes

Title: YDSS Interceptor Sewer Project Information Package


1
YDSS Interceptor Sewer Project Information
Package
Contents
  • Cover Letter
  • Project Overview
  • Feedback Form
  • Copy of Minister of Environment Letter dated
    Oct 1/04

Public Meeting at Richmond Hill Lions
Hall February 8, 2005
2
(No Transcript)
3
What was the Original Project
The basis for the project was to intercept flows
from the existing YDSS sewer on Yonge Street to
alleviate capacity constraints in the existing
system
  • Class EA Completed June 2003
  • Detailed Design 80 Completed Oct 2004
  • A diversion manhole was to be constructed at the
    southeast corner of 19th Avenue and Yonge Street
    followed by a 1500 mm (60 inch) sewer from Yonge
    Street to Leslie Street. A 2100 mm (84 inch)
    sewer would then be constructed down Leslie
    Street which would connect into the existing
    Leslie Street trunk sewer approximately 100 m
    north of Elgin Mills.


4
What Changed October 1, 2004
  • Minister of the Environment received bump-up
    request on project
  • Minister subsequently Denies Bump Up Request with
    Conditions
  • Overview of Conditions
  • Comprehensive review of alternative routing
    options and alternative sewer design and
    construction techniques.
  • Pro-active, strategic, and ongoing Stakeholder
    Relationship Management
  • Technical assessments sufficient for all permits
    and approvals
  • Analysis of cumulative effects of dewatering
    combined with other Regional projects
  • Independent Peer Reviews
  • Technical resource for individual well
    complainants
  • Additional monitoring and reporting requirements
    during and after construction
  • More frequent, effective, interactive public
    communication

5
YDSS Interceptor Sanitary Sewer
Stouffville Road
Expanded Study Area Natural Features Mapping
  • Oak Ridges Moraine
  • Jefferson Complex
  • Rouge Headwaters

19th Avenue
Leslie Street
Yonge Street
Bayview Ave
Elgin Mills
Major Mackenzie
6
What are the routes
Stouffville Road
Expanded Study Area is Bounded By
  • Bloomington Side Road
  • 16th Avenue
  • Bathurst Street
  • Highway 404

19th Avenue
Preliminary List of Alignments
Leslie Street
  • Stouffville Road
  • 19th Avenue

Yonge Street
  • Elgin Mills Road

Bayview Ave
Elgin Mills
  • Twinning of Yonge Street
  • Twinning of Leslie Street
  • (Eliminates PS at Elgin Mills)
  • Major Mackenzie Drive
  • Twinning of Yonge Street
  • Newkirk Road
  • OR Bayview Avenue

Major Mackenzie
7
How will the Public be Consulted?
  • Established a multi-stakeholder advisory
    committee
  • Regular Public Information Forums - next one
    February 8th, followed by another sometime in
    March
  • Additional Outreach Initiatives
  • Periodic newsletters with project up-dates
  • Public Consultation Web Site to keep stakeholders
    informed and to solicit feedback (more
    information in a few weeks)

8
What are potential stakeholders concerns?
  • Concerns regarding the Oak Ridges Moraine,
    Jefferson Forest, Headwaters to the Rouge and
    fish habitat
  • Impacts to residents private wells
  • Construction nuisance and construction impacts
  • Timing of works

9
How Will the Routes be Evaluated
  • Natural Environmental Considerations
  • Potential impacts to water resources and natural
    heritage features
  • Social/Cultural, Economic/Financial,
    Legal/Jurisdictional
  • Potential disruption during construction,
    potential impacts to archaeological and built
    heritage resources, and compatibility with
    current and future land uses
  • Estimated capital costs and operating and
    maintenance efficiencies
  • Potential land requirements
  • Technical Considerations
  • Constructability, flow capacity, dewatering
    impacts, and potential conflicts with existing
    utilities and infrastructure

10
Design/Construction Alternatives
  • Open Cut Sewer Installation
  • Pump Station/ Forcemain
  • Lift Station
  • Tunneling (Earth Pressure Balance Machine)

11
Project Team
12
Timing
Current Reporting period