Title: COMPREHENSIVE EVERGLADES RESTORATION PLAN
1COMPREHENSIVE EVERGLADES RESTORATION
PLAN BISCAYNE BAY COASTAL WETLANDS
PROJECT COSTS PED 006,453,000 Real
Estate 205,655,000 Construction
087,475,000 Total
299,583,000 Federal TBD Non-Fed
TBD Cost Sharing 50/50 Miami-Dade
County NOTE
2Biscayne Bay Coastal Wetlands Schedule
- PMP 10/1/01 - 7/15/02
- PIR 7/02 - 9/04
- Real Estate Acquisition 7/02 - 1/12
- Project Design 9/04 - 9/07
- Plans Specifications 9/07 - 9/09
- Construction 9/09 - 12/15
3PMP Completion Schedule
4Biscayne Bay Coastal WetlandsProject Goals
- Restore or enhance freshwater wetlands, tidal
wetlands, and nearshore bay habitat.
5Biscayne Bay Coastal Wetlands Objectives
- Re-establish productive nursery habitat along the
shoreline - Re-distribute freshwater flow to moderate point
source canal discharges to improve freshwater and
estuarine habitat
6Biscayne Bay Coastal Wetlands Objectives (contd)
- Restore and improve quantity, quality, timing,
and distribution of freshwater to the Bay
including Biscayne National Park - Preserve and restore spatial extent of natural
coastal glades habitat - Re-establish connectivity between Biscayne
Coastal Wetlands, C-111 Model Lands, and adjacent
basins
7Biscayne Bay Coastal Wetlands Study Area April
2002
8Biscayne Bay Coastal Wetlands
9The Restudy Issue Team conceptual plan consisted
of a combination of retention areas, levees and
pumps 5 components.
10Biscayne Coastal Wetlands Conceptual Plan
Components
- Deering Estate Flow-way
- Cutler Wetlands
- L-31E Flow-way
- North Canal Flow-way
- Barnes Sound Wetlands
- Coastal Canals Operations
Source CERP Yellow Book Vol.2 VI-52
11C-100 Canal
Deering Estate flow-way.
12Cutler Wetlands.
13L-31E flow-way.
14North Canal flow-way.
15Barnes Sound wetlands.