JLab FEL Gun Test Stand status - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

JLab FEL Gun Test Stand status

Description:

Single pulse beam is expected this fall in the Gun Test Stand housing the second ... The SF6 pressurized tank has been refurbished and hydro-tested. ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 11
Provided by: linda371
Category:
Tags: fel | gun | jlab | refurbished | stand | status | test

less

Transcript and Presenter's Notes

Title: JLab FEL Gun Test Stand status


1
JLab FEL Gun Test Standstatus
  • C. Hernandez-Garcia
  • May 1 2007

2
Single pulse beam is expected this fall in the
Gun Test Stand housing the second version of the
Upgrade FEL photocathode gun. It will serve as
the test bed for
  • 500 kV operation with field emission suppression
    coated electrodes
  • High charge (1-2 nC) single pulse beam
    characterization
  • NEG coated chamber for improved vacuum
    conditions, and
  • A semi-load lock system for increased
    productivity during cathode change-out and for
    testing different cathode materials
  • Drive Laser RD

3
GTS status
  • The gun assembly with coated electrodes for field
    emission suppression was completed in mid
    September 2006.

4
GTS status cont
  • The assembly was moved to the GTS in September
    2006 and is currently under vacuum in a temporary
    chamber while the latest version is completed.

5
GTS status cont
  • The latest version of the gun chamber has been
    machined out from a single bead of vacuum arc
    re-melt, cross forged 316 LN Stainless Steel. The
    chamber is awaiting vacuum firing for hydrogen
    desorption before completion. This chamber will
    be NEG coated using a process tested successfully
    on the gun temporary chamber.

6
GTS status cont
  • The anode plate will be used as a mirror instead
    of a ligthbox further downstream for illuminating
    the photocathode with the drive laser. This new
    anode has been fabricated from a solid Molybdenum
    block and is currently being polished by hand to
    better than 1 micron surface finish. Brewster
    windows are being manufactured.

Electron beam
7
GTS status cont
  • A design of a semi-load lock system for replacing
    cathodes without perturbing the gun chamber
    vacuum has been completed and fabrication awarded
    to McAllister Inc. This system will also allow
    re-cesiation without opening the SF6 tank,
    shortening the process from 3.5 to 0.5 hours.

Bellows
The bellows are extended to retract the cathode
stalk and the valve is closed
Valve
The bellows are compressed to insert the cathode
stalk with the valve open. The compressed
bellows fit within the corona shield
8
GTS status cont
  • The old IR Demo 500 kV, 5 mA DC high voltage
    power supply (HVPS) will power up the
    photocathode gun. The SF6 pressurized tank has
    been refurbished and hydro-tested. It is
    installed and being fitted with components.

9
GTS status cont
  • The GTS vault has been surveyed and the anchoring
    locations for the gun stand and the HVPS have
    been marked down. The layout below shows the
    proposed beam line

Gun SF6 can
Diagnostic beam line
500 kV DC HVPS tank
10
To produce 1.35 nC bunches with 2 cathode QE, we
need 200nJ per pulse at 527 nm and 50 ps FWHM
  • Use existing FEL drive laser Antares. It will be
    replaced by the Advanced Drive Laser.
  • But need to boost the pulse energy of the
    existing Antares laser
Write a Comment
User Comments (0)
About PowerShow.com