The Game Plan for Loran-C Modernization - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

The Game Plan for Loran-C Modernization

Description:

Loran-C operates where concerns are greatest. Different strengths & weaknesses ... Casualty - reverted to TTX on 29 Oct 2003. Troubleshooting currently underway ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 15
Provided by: JMaca
Category:

less

Transcript and Presenter's Notes

Title: The Game Plan for Loran-C Modernization


1
The Game Plan for Loran-C Modernization
  • John J. MacalusoU. S. Coast Guard
  • Mitchell J. NarinsU. S. Federal Aviation
    Administration
  • International Loran Association
  • Boulder, Colorado
  • November 4, 2003

2
Introduction
  • Purpose of Loran-C Modernization
  • Overall Enhanced-Loran Context
  • Loran Recapitalization Project
  • Status
  • Plans (Order of Lorsta Conversion)
  • Modernized Coverage in 2004

3
Purpose of Loran-C Modernization
  • GPS and GPS augmentation services
  • Volpe Vulnerability Study, 1998-2001
  • Timing, multimodal transportation
  • Intentional and unintentional interference
  • Consequences of loss of GPS
  • Mitigation strategies technologies
  • Loran-C has potential as GPS back-up

4
Potential of Loran-C
  • Loran-C and GPS are complementary
  • Both provide timing, positioning nav info
  • GPS is worldwide
  • Loran-C operates where concerns are greatest
  • Different strengths weaknesses
  • Loran-C requires modernization

5
Enhanced Loran
  • Antenna technology
  • Blink
  • Communications using the Loran signal
  • Differential Loran
  • Early skywave other integrity issues
  • Time-of-Transmission Control
  • Calibration of Loran System
  • Loran Recapitalization Project

6
Loran Recapitalization Project
  • 24 Coast Guard-operated Lorstas
  • CONUS Alaska Lorstas operating
  • Vacuum-tube transmitters (TTX)
  • Solid State transmitters (Legacy-SSX)
  • Control Monitoring System (LCCS)
  • New Equipment
  • Solid State Transmitter (NSSX)
  • Timing Frequency Equipment (TFE)
  • Control Monitoring Equipment (NLCCS)

7
Paths to Modernization
  • Legacy-SSX Lorsta Conversion (13 each)
  • Install new TFE integrate with Legacy SSX
  • Vacuum-tube Lorsta Conversion (11 each)
  • Construct new transmitter building
  • Build/install new transmitter (NSSX)
  • Install new TFE
  • Control Station (2 each)
  • Install new LCCS at Navcen East West

8
First Modernized Lorsta
  • Lorsta George, WA
  • Vacuum-tube transmitter
  • Converted to NSSX on 23 Oct 2003
  • Casualty - reverted to TTX on 29 Oct 2003
  • Troubleshooting currently underway
  • Signal can be monitored by NIST, TSC
  • Involves Canadian government early

9
Expected Coverage of Lorsta George
10
Coverage Adding Dana, Seneca, Baudette
11
Coverage Adding Malone Boise City
12
Chain-by-Chain Conversion
  • Great Lakes Chain (GLKS)
  • US West Coast Chain (USWC)
  • Northeast US Chain (NEUS)
  • Southeast US Chain (SEUS)
  • South Central US Chain (SOCUS)
  • North Central US Chain (NOCUS)
  • Gulf of Alaska Chain (GOA)
  • North Pacific Chain (NORPAC)

13
Conclusion
  • Lorsta George First converted Lorsta
  • GLKS First converted Loran chain
  • Chain-by-chain conversion
  • CONUS Lorstas
  • Alaskan Lorstas
  • Several other Enhanced Loran initiatives
  • Loran-C positioned to serve the nation

14
Questions
  • John J. MacalusoUSCG Loran Support Unit
  • (609)523-7248
  • Mitchell J. NarinsU. S. Federal Aviation
    Administration
  • (202)493-4336
Write a Comment
User Comments (0)
About PowerShow.com