SUNOCO LOGISTICS - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

SUNOCO LOGISTICS

Description:

A PARTNERSHIP FOR MANAGING MARINE RISKS. Atlantic Technical ... Pull Down Most Current SIRE Report. Enter Data on SITE Including SIRE # Contact Scheduler ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 13
Provided by: inter5
Category:

less

Transcript and Presenter's Notes

Title: SUNOCO LOGISTICS


1
SUNOCO LOGISTICSATLANTIC TECHNICAL
MANAGEMENT,A PARTNERSHIP FOR MANAGING MARINE
RISKS
2
(No Transcript)
3
SEATIGER 1979
4
Sunoco Logistics Partners L.P.
  • Master Limited Partnership (SXL on NYSE)
  • Sunoco Inc. as General Partner
  • Owner/Operator of Pipelines and Terminals
  • 4,600 Miles of Pipeline
  • 28.3 million bbls Terminal Storage Capacity
  • 12.5 million bbls _at_ Nederland Terminal
  • Required Flexible Marine Risk Management Program
    to Meet Customer Needs but still
  • Maintain Strong Commitment to Manage Marine Risk

5
Atlantic Technical Management
  • 10 Years in Managing Marine Risks
  • Over 2,000 SIRE Ship Inspections
  • Experience with Different Oil Majors
  • Background in Managing Ship/Shore Interface
  • Commitment to Marine Risk Management with the
    SIRE Inspection Program
  • Understanding of the SLP Risk Management
    Requirements

6
PREPARATIONS
  • Designing a Risk Matrix
  • Establishing the Bottom Line
  • Developing the Computer System
  • Starting at Zero
  • Internal Customers
  • External Customers
  • SIRE Documentation

7
START UP
  • Grandfather Phase
  • Attendances
  • No inspections
  • Complaints
  • First No

8
INFORMATION FLOW
  • Customer Request Ship/Date/Cargo
  • Scheduler Reviews Database Approved/Rejected/Una
    vailable
  • Contact ATM Rejected/Unavailable
  • ATM Screen Port State Casualty Data Sire
    Report
  • Most Current Sire Report 6 months or less
  • If report is Negative/Lacks Information Review
    Next Report
  • If outstanding questions Contact owner/operator
  • Review Complete Approved/Rejected Update Site
  • ATM Contacts Scheduler then Scheduler Contacts
    Customer
  • Goal Full Process in One Hour

9
SCREENING PROCESS
  • Open Vetting Site Select Vessel
  • Review Any Terminal Feedback on Site
  • Review Port State Data
  • Review Casualty Data
  • Pull Down Most Current SIRE Report
  • Enter Data on SITE Including SIRE
  • Contact Scheduler

10
RISK CRITERIA
  • Structural CAP 1 or 2
  • Ballast Tank Integrity
  • IG Operations
  • Safety Procedures
  • Safe Mooring Operations
  • Pumproom Entry Procedures
  • Communications

11
APPROVAL PROCESS
  • Vessel Approved for Single Trip to Berth
  • Inspection at berth - SLP/SIRE Inspector
  • Processed as per SIRE requirements
  • Response from Owners evaluated
  • Any Feedback from Terminal
  • If acceptable, no inspection for up to 1 year
  • Ships over 20 years max 6 months

12
CONCLUSIONS
  • All Ships Screened
  • New Ships Screened by Sire/PSI/Casualty
  • Approved for Single Trip to Berth
  • Successful Inspection Up to 1 Year
  • Terminal Feedback Important
  • Feedback includes Operational Performance
Write a Comment
User Comments (0)
About PowerShow.com