Title: Uttarakhand


1
Uttarakhand
2
Pilot Districts - Relevant Statistics
3
Convergence of NREGS with Schemes of MWR/MoA
  • Nature of Works to be undertaken
  • Renovation of Canals constructed before the year
    2003.
  • Micro Watersheds covered under different schemes
    before the year 2008 but having gaps.
  • Micro Watersheds which have so far not received
    any assistance.
  • Rain Water Harvesting Irrigation Structures.
  • Flood Protection Schemes.

4
Convergence of NREGS with Schemes of MWR/MoA
Total 19 cr
5
Planning Process
  • DRGs have been constituted. BRGs are being
    formed.
  • C-DAPs have been prepared.
  • Physical Resource Inventory - GIS Maps on 110000
    scale with 2.5 m. resolution using LISS-IV MSS
    Cartosat-I data for Champawat Dehradun
    Districts for Spatial Non-Spatial Data.

6
Thematic Parametric Layers of GIS Map
  • 1.LAND USE LAND COVER MAPPING 2. LAND DEGRADATION
  • 3. LAND PRODUCTIVITY 4. LAND IRRIGABILITY
    CLASSIFICATION
  • 5. LAND CAPABILITY CLASSIFICATION 6. IRRIGATED /
    UNIRRIGATED LAND AREAS
  • 7. SOIL MAPPING 8. SOIL LOSS
  • 9. SOIL SUITABILITY FOR CROPS 10. SOIL PHYSICO-
    CHEMICAL PROPERTIES
  • 11. HYDROLOGICAL SOIL GROUPING 12. DOMINANT CROP
    TYPES
  • 13. GEOMORPHOLOGY 14. GROUND WATER POTENTIAL
  • 15. TERRAIN CHARACTERISTICS 16. DRAINAGE
    CHARACTERISTICS
  • 17. CULTURAL FEATURES 18. AGRO-METEROLOGICAL DATA

7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
Issues
  • Transfer of NREGS funds directly to watershed
    committees instead of GPs.
  • Shortage of Technical manpower in
    irrigation/agriculture department.
  • Delays in approval of schemes/projects by ZPs.
  • Expeditious environmental clearance needed.