The NEES MUST-SIM Facility - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

The NEES MUST-SIM Facility

Description:

The NEES MUSTSIM Facility – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 12
Provided by: professora6
Category:
Tags: must | nees | sim | facility | iiwi

less

Transcript and Presenter's Notes

Title: The NEES MUST-SIM Facility


1
The NEES MUST-SIM Facility
Multi-Axial Full-ScaleSub-Structured Testing and
Simulation Facility
2
Agenda
Time Description Leading
730 800 am Continental Breakfast
800 805 am Greeting, Department Introduction David Lange
805 840 am MUST-SIM Introduction, Potential Applications, NEESR Amr Elnashai
840 925 am LBCBs, Strong Wall, Measurement Systems, Local IT Dan Kuchma
925 940 am Centralized NEESit Services Jerry Hajjar
940 1000 am The MUST-SIM Experimental Method (1/5th scale and hybrid testing) Bill Spencer
1000 1010 am Break
1010 1050 am Tour of Newmark Structural Engineering Laboratory/SSTL Dan Kuchma
3
UI-SimCor
Sub-structured Computational and Experimental
Simulation (UI-SimCor)
  • Utilize unique experimental facilities of
    distributed NEES sites.
  • Incorporate various static analysis modules, such
    as ABAQUS, FedeasLab, Matlab, OpenSees, Zeus-NL,
    etc., into virtual experiment
  • Flexible combination of modules are possible all
    experiments, combination of experiment and
    computation, all computation

Time Integrator
Tested Structure
Static Analysis Module
Experiment Module
4
ZeusNL and UI-SimCor
ZeusNL
SIMCOR Modules
5
Overall Architecture of Components
6
MUST-SIM System Architecture

Tele-Control Program
Data Turbine Client
Server Level
Data Turbine
NTCP
NTCP
NTCP
Software Level
LBCB Controller
DAQ
JCamera


Device Level

Actuators
Sensors
Cameras
Axis Cameras

Krypton
Data Source

7
Data for Streaming and Storage
  • Experimental data
  • Sensor data measured by DAQ system
  • Processed data
  • Data from numerical simulation modules
  • Krypton data
  • Wireless sensors
  • Still Image
  • Photogrammetry Nikon 5700
  • Stress Photonics Image
  • Video

8
MISST Metadata
9
Data Acquisition System/Data Storage
  • 3 NI PCI-6052E and 1 NI DAQPAD-6052E
  • 5 NI SCXI-1001 Chassis
  • 248 Channels NI Strain/Bridge Module
  • 128Channels NI LVDT Module
  • 3 Dell Desktop and 1 Dell Laptop as DAQ computers
  • 44 RDP Elecrosense LVDTs
  • 42 Celesco Cable Extension Transducers
  • 28 Spectron Inclinometers
  • 6 Shore Western Controllers
  • 2 2TB Data Storage/Backup Servers

10
Telepresence
  • Telepresence (tele-observation and
    tele-operation) capability (with NTCP and NEES
    TPM)

11
Facilities for Operation
Write a Comment
User Comments (0)
About PowerShow.com