Title: MEGATON MODULAR MULTIPURPOSE NEUTRINO DETECTOR
1MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Education / Experience
? Chamber Design
? Modular Configuration
? Chamber Time Line Estimate
? Chamber Cost Estimate
November 2007
Mark A. Laurenti
2MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
Mark Laurenti
- Education
- BS Mine Engineering (SDSMT 1983)
- MBA (University of SD 2001)
- Homestake (1983 2001)
- Shaftman
- Contract Miner
- Mine Engineer Underground
- Mine Foreman Underground
- Chief Engineer Underground
- Chief Engineer Surface
- Technical Services Superintendent
- Vulcan Materials (2001 Present)
- Underground Project Design Construction
Manager - Underground Plant Manager
- McCook Reservoir (TARP) Project Manager
Mark A. Laurenti
November 2007
3MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Chamber Design
Controlled Blasting in Chamber
Could use Instrumented Cables for Engineering /
Geotechnical Study
Mark A. Laurenti
November 2007
4MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Chamber Design
Note ! 3 Chambers Drilled in Costing
Mark A. Laurenti
November 2007
5MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Modular Configuration
Mark A. Laurenti
November 2007
6MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Modular Configuration
Mark A. Laurenti
March 2007
7MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Chamber Time Line Estimate
General Parameters
Mark A. Laurenti
November 2007
8MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Chamber Time Line Estimate
3 Chambers drilled
6 Chambers Accessed
1 Chambers Mined
Design (3) 7 Months Site Set up (6) 9
Months Excavate Chamber (1) 61 months
Mark A. Laurenti
November 2007
9MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
Mark A. Laurenti
November 2007
10MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
Mark A. Laurenti
November 2007