Feasibility Analysis and Proposal for next phases test - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Feasibility Analysis and Proposal for next phases test

Description:

Data configuration: SIP, MGCP, H.248 in one country connected to Call Server in another ... Verify the interworking between IAD, TG, SIP terminal with Call server ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 16
Provided by: zha50
Category:

less

Transcript and Presenter's Notes

Title: Feasibility Analysis and Proposal for next phases test


1
  • Feasibility Analysis and Proposal for next
    phases test
  • Xueli Zhang, CATR
  • zhangxueli_at_mail.ritt.com.cn
  • CJK 9th NGN WG Meeting
  • April 9-11, Jeju,Korea

2
Scenarios Analysis
  • 2 scenarios finished
  • Scenario 2 Call Servers across multiple IP
    Network Domains without PSTN
  • Scenario 4 Call Servers across multiple NGN
    Network Domains with PSTN
  • 5 scenarios left (from 7thNGN-WG_005 and
    CJK6_NGNWG6_17_CJK NGN Test Scenario Proposal)
  • Scenario 1 Single Call Server within a single
    NGN Network Domain without PSTN
  • Scenario 3 Single Call Server within a single
    NGN Network Domain with PSTN
  • Scenario 5 Call Servers across multiple NGN
    Network Domains with PSTN Value Added Services
  • This scenario adds Value Added Services to
    scenario 4 using Media Servers and Application
    Servers
  • Scenario 6 Performance Evaluation
  • Scenario 7 Call Servers across multiple NGN
    Network Domains with PSTN, Value Added Services
    and RACF Involvement

3
Scenarios Analysis
  • Scenario 1 Single Call Server within a single
    NGN Network Domain without PSTN

4
Scenarios Analysis
  • Scenario 1 Single Call Server within a single
    NGN Network Domain without PSTN
  • Test Precondition
  • Data configuration SIP, MGCP, H.248 in one
    country connected to Call Server in another
  • Test Purpose
  • Verify the data configuration?
  • Verify the interworking between IAD, TG, SIP
    terminal with Call server
  • Usually done by operator to provide service
  • Service requirements of our test?

5
Scenarios Analysis
  • Scenario 3 Single Call Server within a single
    NGN Network Domain with PSTN

6
Scenarios Analysis
  • Scenario 3 Single Call Server within a single
    NGN Network Domain with PSTN
  • Same as scenario 1
  • Test Precondition
  • Data configuration SIP, MGCP, H.248 in one
    country connected to Call Server in another
  • Test Purpose
  • Verify the data configuration?
  • Verify the interworking between IAD, TG, SIP
    terminal with Call server
  • Usually done by operator to provide service
  • Service requirements of our test?

7
Scenarios Analysis
  • Scenario 5 Call Servers across multiple NGN
    Network Domains with PSTN Value Added Services

8
Scenarios Analysis
  • Scenario 5 Call Servers across multiple NGN
    Network Domains with PSTN Value Added Services
  • Test Precondition
  • Which service?
  • Test Purpose
  • Verify the interworking between call servers
  • Same as scenario 2 and 4 we finished except the
    detailed paramter

9
Scenarios Analysis
  • Scenario 6 Performance Evaluation
  • Network Performance Testing cases
  • E2E Call Setup Delay
  • Call Completion Rate
  • Each Segment E2E IPTD/IPDV/IPLR/Path
    unavailability
  • Call Traffic Accounting
  • Harmonization Testing of Service QoS class
    differences among CJK
  • User Terminal Performance Testing cases
  • Various User Terminal Performance Testing
  • Test Precondition
  • Network
  • Simulator
  • Call model signalling flow, call duration
  • Terminal
  • Further study?

10
Scenarios Analysis
  • Scenario 7 Call Servers across multiple NGN
    Network Domains with PSTN, Value Added Services
    and RACF Involvement

11
Scenarios Analysis
  • Scenario 7 Call Servers across multiple NGN
    Network Domains with PSTN, Value Added Services
    and RACF Involvement
  • No RACF, system upgrade
  • Huge Cost
  • Budget and funding?

12
Other
  • IPTV test
  • Not support IPTV, system upgrade
  • Huge Cost
  • Budget and funding?

13
Proposal
  • Next step
  • Possible scenarios
  • Scenario 1 Single Call Server within a single
    NGN Network Domain without PSTN
  • Scenario 3 Single Call Server within a single
    NGN Network Domain with PSTN
  • Scenario 6 Performance Evaluation for 1,2,3,4
  • Our test purpose?
  • Funding?
  • Common understanding among CCSA members

14
Proposal
  • Need preparation after test purpose and scenarios
    are determined
  • Test specification first
  • Test item
  • Data configuration
  • Terminal still only SIP in ETRI?
  • Service
  • Performance Evaluation
  • Test specification first
  • Call model signalling flow, call duration
  • Simulator prepared
  • Load traffic generated from one side, terminate
    in other side?

15
Proposal
  • Japan?