Title: Vala 900 Phase IV Presentation


1
Vala 900Phase IVPresentation
Prepared by Peter GARDENER Ekrem CĂ‹RVADIKU
2
Objectives
  • Utilize latest Technology
  • Offer all the existing and latest features
  • Ability to meet future market needs
  • Expandable in modular fashion without service
    interruption
  • Offer reliable and quality service
  • Minimize costs
  • Seamless integration with other vendors network
    equipment and systems

3
Objectives
  • Increase the Network Capacity to support 700.000
    customers
  • Increase Network Coverage to cover 99 of
    populated areas
  • Improve Network Quality. Achieve Call Blocking
    and Call Drop rates of 2 Black Spots
  • Improve existing Products and Services SMS,VM
  • Introduce new innovative Product and Services
    GPRS, MMS
  • Introduce Operational Support Systems to Plan and
    manage the GSM Network

4
Main Factors
  • Forthcoming Competition
  • Predicted Lack of Capacity
  • Lack of GSM Coverage in Populated Areas
  • Improvement to Network Quality
  • Minimal Product and Services Offering
  • Lack of Automated Systems and Tools to manage and
    optimize the Network

5
Benefits
  • Increasing capacity
  • Improving coverage
  • Improving quality
  • Value Added Services
  • Automated Planning and Management Systems

6
Phase III
  • Capacity to support 400.000 customers
  • 85 coverage of the population
  • 2 MSC-s
  • 176 BTS-es

7
Coverage
8
Phase IV
  • Capacity to support 700.000 customers
  • 99 coverage of the population
  • 3 MSC-s
  • 286 BTS-es

9
Implementation
  • Implementation 12 18 months
  • BTS Civil Works Commenced November 2005
  • Ease congestion in Prizren late 2005/2006.
    Prishtina, Gjakova, Peja - ongoing during project
    lifecycle
  • New Services Commercial Available to market QTR2
    2006
  • In Parallel enhancements to systems / platforms
    ongoing during project lifecycle
  • Upgrade Network Transmission/Topology/Resilience
    ongoing during project lifecycle

10
Health and Safety
  • Public shouldnt be exposed to
  • - electric field above 41 Volt/meter
  • - magnetic field above 11 Amper/meter
  • 12/07/1999 European Community
  • All European Community regulations Adhered to

11
Health and Safety
  • Electromagnetic Compatibility (EMC)
  • Acoustic noise
  • Safety
  • Product Environmental Attributes
  • Materials

12
Health and Safety
  • GSM antenna 4m 10 V/m
  • LargPerquesi(400KV) 100m 200 V/m
  • Refrigerator 30 cm 90 V/m
  • Iron 30 cm 60 V/m
  • Hair dryer 10 cm 40 V/m