SRC - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

SRC

Description:

Controller training on the effects of degraded operations - inclusion in ESARR 5? ... examples in risk assessment. setting national safety minima. more ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 17
Provided by: PAR48
Category:

less

Transcript and Presenter's Notes

Title: SRC


1
SRC
2
AGASAction Group for ATM Safety
  • Senior professionals in ATM safety
  • Safety Managers, Regulators, Airspace Users
  • Wholesale stocktake of safety
    strategies,processes and procedures
  • 4 Specific Working Groups HF
  • Safety overview study
  • Action Plan for ATM Safety

0.60
3
WORKING GROUPS
  • WG1 Implementation of Regulations
  • Drafting of ESARRs
  • Transposition of ESARRs into national law
  • Adequate resources for the regulator
  • Awareness
  • SRC monitoring.
  • WG2 Reporting
  • Allocate the resources necessary to implement
    harmonised safety occurrence data collection,
    analysis, sharing and dissemination mechanism
  • Implement the principles of just culture and
    initiate an awareness and education campaign.

4
WORKING GROUPS
  • WG3 ACAS
  • ACAS documentation reviewed
  • possibility of down-linking RA information to AWP
    to be investigated
  • Further technical aspects under consideration.
  • WG4 Ground Based Safety Nets
  • Accelerated action to install STCA ECAC-wide
  • the need for guidance for the management of
    technical outages
  • a uniform solution for last-resort voice comms
    is being investigated.

5
AGAS RECOMMENDATIONS TO PC
  • Early AGAS Recommendations made to PC/15 and
    reported to ACG/18. Current Situation
  • EUROCONTROL Commission agreed and the following
    actions in train
  • Collection Dissemination of Lessons Learnt
    Data. Pilot exercises will be undertaken during
    2003
  • Implementation of STCA. A tailored approach to
    appropriate States is being taken
  • Review of ACAS Documentation. The Director
    General has sent a letter to all ECAC DGCAs
    inviting them to ensure provisions are in line
    with ICAO
  • Human Resource Arrangements. The Director General
    has sent a letter to all ECAC DGCAs inviting them
    to review their CWP staffing arrangements to
    verify that sufficient arrangements are in place.

6
AGAS SAFETY OVERVIEW STUDY
AMONGST 41 ECAC STATES
Regulators
ANSPs
33 (83)
37 (90)
Questionnaires returned
27 (66)
26 (64)
Interviews conducted
7
QUESTIONNAIRES RESULTSMATURITY LEVEL
ConfidentAdopters
WillingDevelopers
UncertainStarters
8
PRELIMINARY CONCLUSIONSFROM INTERVIEWS
  • Shortage of qualified resources for safety
  • Need for enhanced leadership for safety
  • Expected contributions from EUROCONTROL
  • Practical guidance, including guidance for
    customisation to smaller organisations
  • Development of harmonised Acceptable Means of
    Compliance to ESARRs
  • Specification of competence and training
    requirements for safety experts.

9
(No Transcript)
10
ACTION PLAN FOR ATM SAFETY IN EUROPESTRATEGIC
AXES
  • Enforcement of ESARRs and implementation
    monitoring
  • Quantity and quality of resources for safety
    regulators and safety managers (including
    training)
  • Raise the awareness level with regard to safety
    issues
  • Incident reporting, including the culture and the
    analysis of reports and their dissemination
  • ACAS and ACAS awareness and the air/ground status
    information of RAs
  • Adequacy and deployment of safety nets
  • Runways and runway safety
  • Human factors and resourcing, including the
    adequacy of resources
  • Need to support RD (with a view to achieving
    medium and long- term solutions).

11
LIKELY ACTIONS FOR SRC
  • WG1
  • Revisit all ESARRs (approved and in draft)
  • Improve clarity of structure (mandatory v non)
  • Re-draft into EC compliant format
  • Review awareness strategy (workshops etc).
  • Future direction for SRC Monitoring
  • More permanent structure
  • From fact finding to auditing

12
LIKELY ACTIONS FOR SRC
  • WG2
  • Address non-responses to ESARR 2
  • Establish focal points in ALL States
  • Further education/awareness
  • Mandate ESARR 2 / AST Training
  • Include resourcing aspects in ESARR 2
  • Lessons not learned

13
LIKELY ACTIONS FOR SRC
  • WG3
  • Mandate controller training on safety nets
  • WG4
  • Ground-based safety nets
  • Mandate STCA,MSAW,APW
  • Controller training included in ESARR 5?
  • Status published in AIP
  • Approval of normal/degraded operations (ESARR 3?)
  • Coordination between Units (ESARR 7?)

14
LIKELY ACTIONS FOR SRC
  • Human Factors
  • Manning levels for normal and degraded operations
    - inclusion in ESARR 5?
  • Controller training on the effects of degraded
    operations - inclusion in ESARR 5?
  • Procedures for briefing controllers on safety
    effects of degraded operations- inclusion in
    ESARR 7?

15
LIKELY ACTIONS FOR SRC
  • Safety Overview
  • Training of ATM safety regulators
  • Provide more guidance in complex areas
  • examples in risk assessment
  • setting national safety minima
  • more practical support material
  • Application to small organisations

16
WHAT NEXT
  • Constructing the Action Plan for ATM Safety
    Regulation
  • AGAS 4
  • PC 16
  • Programme Management Plan for implementation
    of measures
  • SRC Work Programme Review

17
SRC
Write a Comment
User Comments (0)
About PowerShow.com