Phoenix Regional ITS Fiber Optic Backbone - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Phoenix Regional ITS Fiber Optic Backbone

Description:

PHX regional ITS backbone provides key links. AZTech. Telecommunications. Overview ... Connect ADOT TOC to ADOT HQ. Connect Sky Harbor to Deer Valley ... – PowerPoint PPT presentation

Number of Views:64
Avg rating:3.0/5.0
Slides: 16
Provided by: bobst5
Category:

less

Transcript and Presenter's Notes

Title: Phoenix Regional ITS Fiber Optic Backbone


1
Phoenix RegionalITSFiber Optic Backbone
2
PURPOSES
  • Improve agency operations by establishing a
    shared, regional, telecommunications network.
  • Create a regional, multi user communications
    network to improve and support ITS and homeland
    security.

3
MAGRegional CommunicationsNetwork Study
  • PHX regional ITS backbone provides key links

4
AZTech TelecommunicationsOverview
  • PHX regional ITS backbone is a Key Component

5
Phase AActive Partners
  • ADOT Transportation Technology Group
  • Phoenix Aviation
  • Phoenix Information Technology
  • Phoenix Street Transportation
  • Phoenix Transit

6
Phase APassive Partners
  • Light Rail Transit
  • DPS
  • Phoenix PD
  • Phoenix Fire

7
Phase A
  • Downtown
  • to
  • Deer Valley Airport

8
  • TMC _at_ City Hall
  • Washington Jefferson
  • 19th Ave. Corridor
  • Loop 101
  • 7th Ave.

9
Phase AMajor Connections
  • Connect ADOT TOC to ADOT HQ
  • Connect Sky Harbor to Deer Valley
  • Connect Transit to ADOT TOC and RAPID
  • Provide ITD 96 SMFO
  • Provide 12 SMFO for Regional Use
  • Connect PHX TMC to (43) Traffic Signals and (1)
    Dynamic Message sign

10
ITS Components
  • 43 Traffic Signals
  • 1 Dynamic Message Sign

11
ProjectDetails
  • Length 21 Miles
  • 8 miles New Conduit
  • 13 Miles Existing Conduit
  • (1) 144 or (1) 96 Fiber SMFO for Backbone
  • 12 Fiber SMFO for Branches

12
Status
  • Design Concept Report November 2002
  • Environmental Approval January 2004
  • Construction Approval April 2004
  • Advertise for Construction June 2004

13
Estimated Construction Cost Phase A
  • 3-4 Million

14
Contract Mechanism
  • CM_at_R

15
Questions
  • ?