Roof Asset Management - PowerPoint PPT Presentation

1 / 35
About This Presentation
Title:

Roof Asset Management

Description:

Annual/Bi-annual Inspections. General Statistics. 3,083,489 sf. 107 major buildings ... 08 - $.10 per sf annual maintenance. 381, 949 sf replaced in last 5 years ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 36
Provided by: pede8
Category:

less

Transcript and Presenter's Notes

Title: Roof Asset Management


1
(No Transcript)
2
Overview
  • WMU Case Study
  • Software Demonstration
  • Best Practices
  • General Statistics

3
WMU Roof Portfolio
  • 3,083,489 Sq. Ft.
  • 107 Major Buildings
  • 551 Roof Sections

4
(No Transcript)
5
Deferred Maintenance Fee
  • Inception 1997
  • Defined Funding Sources

6
Needs / Best Practices
A way to get our arms around it
  • Accurate Data
  • Standardization of Design
  • Decision Making Tools
  • Timely Bid Process
  • Commissioning
  • Preventative Scheduled Maintenance

7
1 - Accurate Data
  • Accurate Centralized Data
  • Computerized System
  • Easy User Friendly Access
  • Linked AutoCAD Drawings
  • Sorting and Analysis Capabilities

8
Initial Data Gathering
  • Field Verification
  • File Archive Search
  • 2 students 2 years
  • AutoCAD and Digital Pictures

9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
2 - Standardization of Design
  • Fully Adhered 60 mil EPDM
  • Four way tapered insulation
  • 20 year full system warranty
  • Specifications exceed minimum warranty
    requirements
  • Full coverage adhesives

19
Distribution by Age and Type
20
3 - Decision Making Tools
What We Wanted
  • First Response Reference
  • Warranty Compliance Data
  • Repair Replacement Analysis
  • Proposals Reports for Clients

21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
4 - Timely Bid Process
30
5 - Commissioning
  • Manufacturer warranty inspection
  • In house staff
  • Inspections during construction
  • Punch list
  • Increased familiarity with roof system

31
6 - Preventative Scheduled Maintenance
  • Preventative Maintenance
  • TMA scheduling/work order generation
  • Annual/Bi-annual Inspections

32
General Statistics
  • 3,083,489 sf
  • 107 major buildings
  • 551 roof sections
  • Distribution by type
  • 37.0 - Fully Adhered Mech.
  • Attached (26.22 Acres)
  • 20.6 - Ballasted (14.57 Acres)
  • 10.2 - BUR (7.19 Acres)
  • 13.1 - Metal (9.28 Acres)
  • 11.6 - Dow Liteguard (8.23
  • Acres)
  • 7.5 - Other (5.31 Acres)
  • 1,343,523 sf under warranty
  • .08 - .10 per sf annual maintenance
  • 381, 949 sf replaced in last 5 years
  • 472,182 sf added in last 5 years
  • 3 FTEs

33
Specifications
  • WMU Facility Guidelines
  • http//www.pp.wmich.edu/standards/index.html

34
Contact Information
  • Ken Fifelski - Kenneth.Fifelski_at_wmich
    .edu
  • Steve Macomber -Stephan.Macomber_at_wmich.edu

35
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com