Working Group Outbrief Template - PowerPoint PPT Presentation

1 / 41
About This Presentation
Title:

Working Group Outbrief Template

Description:

The purpose of the Panels is to help level-set the playing field for ... in the template needs to be briefed (they will be included in the final report) ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 42
Provided by: cho9
Category:

less

Transcript and Presenter's Notes

Title: Working Group Outbrief Template


1
Working Group Outbrief Template
  • Services Interfaces for Decision Support Tools
  • Michael Burnett

2
Panels
  • The purpose of the Panels is to help level-set
    the playing field for those who wish to
    participate in the Working Group
  • Each panel member should talk about the topic
    within the GEOSS context and highlight his/her
    perception of
  • The current state-of-the practice
  • Leverage points and enablers
  • Constraints
  • Issues
  • Chairpersons should
  • Introduce each panel member
  • Endeavor to keep discussion within the GEOSS
    context
  • Ask questions to stimulate discussion about the
    four areas listed above
  • Allow the audience to participate
  • Summarize the discussion at the end

3
Working Group Overview
  • Based on current registration numbers, expect
    10-20 people to included in your working group
  • This template is a waveguide it describes the
    type of results that we would like to see and
    provides a standard method to report on them
    your groups deliberations may take you in
    another direction
  • Remember, goal of working group is to collect,
    integrate and categorize information consensus
    is NOT required.
  • Use the high-level value stream as a starting
    point (you can delete the other 3)
  • Revise/update the value stream into its own
    context
  • Generate an IPO diagram for each step in the
    value stream
  • Creating a Domain Collaboration Diagram may be
    difficult
  • Start at 50,000 ft level and decompose as
    required.
  • Remember, the goal is to identify the entities
    and to characterize the interface between
    entities
  • Brainstorm potential Use Cases
  • Categorize them, complete Table
  • Try to fill out Use Case Template for key use
    cases
  • Brainstorm and vote (use dots) on
  • Standards, Constraints, Issues, Enablers
  • Characterize the Importance/Relevance of the Top 3

4
Working Groups Thursday
  • Suggested Working Group Choreography (Thursday)
  • Complete review/revision of high-level value
    stream (entire working group) session (130
    230)
  • Breakout into subgroups (separate tables) to
    generate the following artifacts (230 330)
  • IPO Diagrams
  • Domain Collaboration Diagram(s)
  • Use Cases List/Examples
  • Reconvene entire working group to review inputs
    (330 400)
  • Report out to Plenary (400 500)
  • Summary of Deliberations key results,
    identification of gaps
  • 15 Minutes per Working Group (maximum)
  • Homework Think about todays deliberation and
    consider appropriate standards, constraints,
    issues and enablers

5
Working Groups Friday
  • Suggested Working Group Choreography (Friday)
  • Record comments on yesterdays results (entire
    working group) session (930 1000)
  • Break (1000 1015)
  • Brainstorm and vote (entire working group) on
    Standards, Constraints, Issues and Enablers
    (1015 1115, 15 minutes each)
  • Breakout into subgroups (separate tables) to
    generate input on relevance/importance of top
    three in each category (1115 1200)
  • Standards
  • Constraints
  • Issues
  • Enablers
  • Working Lunch (entire working group) discussion
    and updates to outbrief template (1200 100)
  • Working Group Outbrief to Plenary (100 300)
  • 30 Minutes per Working Group maximum
  • Provide high-level review of deliberations
  • Not every slide in the template needs to be
    briefed (they will be included in the final
    report)
  • Identify key result, areas of consensus and areas
    where difference of opinion still exist

6
GEOSS Value Streams
Collect Obs
Process Products
Archive/ Manage Products
Transmit Telemetry
Conduct Primary Mission
Information Creation (Supply Side)
Develop Algorithms
Employ R-to-O
Create Services
Make Better Informed Decisions
Generate Predictions
Validate Models
Conduct Research
Develop Models
Public Domain/ Market- Driven
Stimulate Value-added Market
Develop DST
Employ R-to-O
Research/ Modeling
Stimulate Capacity Building
Access Products
Discover Products
Exploit Decision Support Tools
Visualize Products
Impacts/ Outcomes
Information Exploitation (Demand Side)
7
Spatially-enabled Search Portals
Collect Obs
Process Products
Archive/ Manage Products
Transmit Telemetry
Conduct Primary Mission
Information Creation (Supply Side)
Develop Algorithms
Employ R-to-O
Create Services
Make Better Informed Decisions
Generate Predictions
Validate Models
Conduct Research
Develop Models
Public Domain/ Market- Driven
Stimulate Value-added Market
Develop DST
Employ R-to-O
Research/ Modeling
Stimulate Capacity Building
Access Products
Discover Products
Exploit Decision Support Tools
Visualize Products
Impacts/ Outcomes
Information Exploitation (Demand Side)
8
Georeferenced Emergency Alerting
Collect Obs
Process Products
Archive/ Manage Products
Transmit Telemetry
Conduct Primary Mission
Information Creation (Supply Side)
Develop Algorithms
Employ R-to-O
Create Services
Make Better Informed Decisions
Generate Predictions
Validate Models
Conduct Research
Develop Models
Public Domain/ Market- Driven
Stimulate Value-added Market
Develop DST
Employ R-to-O
Research/ Modeling
Stimulate Capacity Building
Access Products
Discover Products
Exploit Decision Support Tools
Visualize Products
Impacts/ Outcomes
Information Exploitation (Demand Side)
9
Modeling and Data Assimilation
Collect Obs
Process Products
Archive/ Manage Products
Transmit Telemetry
Conduct Primary Mission
Information Creation (Supply Side)
Develop Algorithms
Employ R-to-O
Create Services
Make Better Informed Decisions
Generate Predictions
Validate Models
Conduct Research
Develop Models
Public Domain/ Market- Driven
Stimulate Value-added Market
Develop DST
Employ R-to-O
Research/ Modeling
Stimulate Capacity Building
Access Products
Discover Products
Exploit Decision Support Tools
Visualize Products
Impacts/ Outcomes
Information Exploitation (Demand Side)
10
Service Interface for Decision Support Tools
Collect Obs
Process Products
Archive/ Manage Products
Transmit Telemetry
Conduct Primary Mission
Information Creation (Supply Side)
Develop Algorithms
Employ R-to-O
Create Services
Make Better Informed Decisions
Generate Predictions
Validate Models
Conduct Research
Develop Models
Public Domain/ Market- Driven
Stimulate Value-added Market
Develop DST
Employ R-to-O
Research/ Modeling
Stimulate Capacity Building
Access Products
Discover Products
Exploit Decision Support Tools
Visualize Products
Impacts/ Outcomes
Information Exploitation (Demand Side)
11
Feedback on the GEOSS Value Stream
  • Value Stream does not reflect a closed system
    diagram needs to reflect feedback loops
  • Value Stream does not capture the economic flow
  • Value Stream does not reflect an interaction with
    the business case(s)
  • Value stream does not capture the metrics/quality
    management flow
  • Requirements drives should be the markets/users

12
High Level Value Stream Template
Business Planning and Execution
Education/Best Practice
Collaboration Environment
Intelligent access to Expertise/Other Domain
Knowledge
Identify need for decision and time constraint
Build DSS
Learn
Use
Business Case
Re-execute DSS
Identify new DSS
Update DSS
Update Business Case
13
IPO Chart Template
Decision measures of effectiveness
Identify need for decision and time constraints
Problem statement
Users
Time constraints
1. Needs analysis 2. Risk analysis 3. Time
analysis 4. Data and information analysis
Data information requirements
Societal Benefactors
Gap analysis
Characteristic of the decision
Vision document
Business case
Copy as needed
14
IPO Chart Template
Decision measures of effectiveness
Business case
Time constraints
Business Plan
  • Analyze requirements
  • 2. Market analysis
  • 3. Analysis of Alternatives
  • 3. Estimate cost for alternatives
  • 4. Cost/Benefit Analysis
  • 5. Select best value

Data information requirements
Use Case Model
Gap analysis
Characteristic of the decision
Vision document
Copy as needed
15
IPO Chart Template
Published service/application
Build DST
Business Plan
1. Validate requirements 2. Develop project
plan and budget 3. Design Validate
Data/Services Discover GEOSS data Understand
data Validate quality, type, integrity,
timeliness, availability Gap analysis
Service Specification 4. Build 5. Test and
Evaluation 6. Make available (if applicable
publish)
Vision document
Training
Resources
Lifecycle support
Service/data available GEO/non-GEO
Revised Business Plan
Use Case Model
16
IPO Chart Template
Use DSS/DST
Information
Data and information
Decision
Services/models
  • 1. Input discovery and access
  • Execute DST
  • Weigh results
  • 4. Make decision
  • 5. Take action on decision

Relevant exogenous information
Observable results
Published service/application
Auditable performance record ( capture input,
output, decision criteria)
Training
Lifecycle support
Revised Business Plan
17
IPO Chart Template
Decision
Learn
New requirements
Legacy best practice
New best practice
1. Analysis 2. Assessments 3. Peer
involvement 4. Benchmark 5. Interview
actors/value chain feedback 6. Document
Auditable performance record ( capture input,
output, decision criteria)
Update business plan
New benchmark
Success in outreach
Observable results
Old benchmark
Re-execute
18
Domain Collaboration Diagram
Task
Copy and move shapes as needed copy page as
needed
19
List of Key Use Cases
Copy as needed
20
Use Case Template
Use Case Name
  • Description
  • Actors
  • Preconditions
  • Flow of Events for Main Scenario
  • Alternate Scenario
  • Post Conditions
  • Special Conditions

Copy as needed
21
List of Relevant Standards
22
Standards Relevance/Importance
23
List of Relevant Constraints
24
Constraints Relevance/Importance
25
List of Relevant Issues
26
Issues Relevance/Importance
27
List of Relevant Enablers
28
High Level Value Stream Template
OLD ONE
Cross-Steam Enabler
Cross-Steam Enabler
Cross-Steam Enabler
Identify need for decision and time constraint
Define decision methodology
Define inputs
What are the output requirements
Act on outputs
Execute on decision model
Learn
Replace Step N with Transitive Verb/Object
29
Enabler Relevance/Importance
30
  • Back-Ups

31
Service Interfaces for DSS/DST
  • Summary Report

32
High Level Value Stream Template
Business Planning and Execution
Education/Best Practice
Collaboration Environment
Intelligent access to Expertise/Other Domain
Knowledge
Identify need for decision and time constraint
Build DSS
Learn
Use
Business Case
Re-execute DSS
Identify new DSS
Update DSS
Update Business Case
33
IPO Chart Template
Decision measures of effectiveness
Identify need for decision and time constraints
Problem statement
Users
Time constraints
1. Needs analysis 2. Risk analysis 3. Time
analysis 4. Data and information analysis
Data information requirements
Societal Benefactors
Gap analysis
Characteristic of the decision
Vision document
Business case
Copy as needed
34
IPO Chart Template
Decision measures of effectiveness
Business case
Time constraints
Business Plan
  • Analyze requirements
  • 2. Market analysis
  • 3. Analysis of Alternatives
  • 3. Estimate cost for alternatives
  • 4. Cost/Benefit Analysis
  • 5. Select best value

Data information requirements
Use Case Model
Gap analysis
Characteristic of the decision
Vision document
Copy as needed
35
IPO Chart Template
Published service/application
Build DST
Business Plan
1. Validate requirements 2. Develop project
plan and budget 3. Design Validate
Data/Services Discover GEOSS data Understand
data Validate quality, type, integrity,
timeliness, availability Gap analysis
Service Specification 4. Build 5. Test and
Evaluation 6. Make available (if applicable
publish)
Vision document
Training
Resources
Lifecycle support
Service/data available GEO/non-GEO
Revised Business Plan
Use Case Model
36
IPO Chart Template
Use DSS/DST
Information
Data and information
Decision
Services/models
  • 1. Input discovery and access
  • Execute DST
  • Weigh results
  • 4. Make decision
  • 5. Take action on decision

Relevant exogenous information
Observable results
Published service/application
Auditable performance record ( capture input,
output, decision criteria)
Training
Lifecycle support
Revised Business Plan
37
IPO Chart Template
Decision
Learn
New requirements
Legacy best practice
New best practice
1. Analysis 2. Assessments 3. Peer
involvement 4. Benchmark 5. Interview
actors/value chain feedback 6. Document
Auditable performance record ( capture input,
output, decision criteria)
Update business plan
New benchmark
Success in outreach
Observable results
Old benchmark
Re-execute
38
List of Relevant Standards
39
List of Relevant Constraints
40
List of Relevant Issues
41
List of Relevant Enablers
Write a Comment
User Comments (0)
About PowerShow.com