Entergy Transmission Asset Preservation Department 2004 Objectives - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Entergy Transmission Asset Preservation Department 2004 Objectives

Description:

Reduce Transmission System Average Interruption Frequency Index ('TSAIFI' ... Load Tap Changer inspection every 2 years. 6. Circuit Breaker Maintenance: ... – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 17
Provided by: brian568
Category:

less

Transcript and Presenter's Notes

Title: Entergy Transmission Asset Preservation Department 2004 Objectives


1
Entergy TransmissionAsset Preservation
Department2004 Objectives
  • Entergy Transmission Planning Summit
  • New Orleans, LA
  • July 10, 2003

2
Asset PreservationTransmission 2004 Objectives
  • Improve Transmission System Reliability
  • Reduce Transmission System Average Interruption
    Frequency Index (TSAIFI)
  • Reduce Transmission System Average Interruption
    Duration Index (TSAIDI)

3
Main SubstationTransmission Outage Causes
  • Switches
  • Breakers
  • Relay Misoperations
  • Arresters
  • Potential Current Transformers

Substation-Related Outages by Cause (System)
4
Substation Equipment Age
  • Description Qty.
  • Transmission Transformer (270)
  • Average age 28 years
  • Description Qty. Qty.
  • H V Circuit Breaker Oil (1700) Gas
    (780)
  • Average age 32years 12years

5
Improve System ReliabilitySubstation Equipment
Maintenance
  • Transformer Maintenance
  • Dissolve Gas Analysis every year
  • TTR (Turn to Turn Ratio) every 4 years
  • Doble Test and Meggar Test every 4 years
  • Load Tap Changer inspection every 2 years

6
Improve System ReliabilitySubstation Equipment
Maintenance
  • Circuit Breaker Maintenance
  • Speed test and External Inspection every 5 years
  • Oil dielectric test every year
  • Power factor bushings every 10 years
  • Test SF6 moisture for Gas Circuit Breakers every
    5 years
  • Substation Inspections
  • Visual inspection every month (Infrared,
    coronascope, SF6 Gas detection camera,
    ultrasonic detector)
  • Relay Maintenance
  • DC Operational Test Panel Inspection every 4
    years
  • Relay Calibration every 4 years

7
Reduce TSAIFI and TSAIDISubstation Outage
Reduction Programs
  • Circuit Switch Replacement
  • replace damaged components
  • Arrester Replacement
  • replace silicon carbide arresters with MOVs
  • Breaker Replacement
  • replace aged breakers that are obsolete
  • Breaker Additions
  • install breakers in strategic substations to
    isolate the majority of customers from outages
    and reduce the length of the outage
  • Automatic Sectionalizing
  • Add motor operated switches allowing remote
    sectionalizing
  • reducing outage times

8
Reduce TSAIFI and TSAIDISubstation Outage
Reduction Programs
  • RTU Retrofits
  • Install new RTUs in stations without one,
    reducing outage duration
  • Replace obsolete equipment on a priority basis,
    reducing outages and outage duration
  • Pin and Cap Replacement
  • replace pin cap insulators with new station
    post insulators
  • Circuit Switcher Replacement
  • replace damaged components and aged equipment
  • Transformer Life Extension
  • Re-blocking and Re-gasketting
  • (Depends on age, manufacturer, size, paper and
    clamping type of the unit)

9
Main Transmission Line Outage Causes
  • Lightning
  • Line Material Failure
  • Vegetation
  • Storms
  • Contamination

10
Transmission Line Miles
11
Transmission Line Age
12
Improve System ReliabilityT-lines Maintenance
cycles
  • Climbing inspection
  • 8 Year cycle
  • Aerial patrol
  • System is flown 2 times per year
  • Vegetation
  • Urban tree trimming 3 Year cycle
  • Mowing 2-5 Year cycle
  • Herbicide 4-5 Year cycle
  • Side trimming of ROW 9 Year cycle
  • Osmose - Ground line inspection
  • North Louisiana and Arkansas 12 Year cycle
  • Mississippi and Texas 10 Year cycle
  • South Louisiana 8 Year cycle

13
Reduce TSAIFI and TSAIDIT-Line Outage Reduction
Programs
  • Wood pole replacement
  • replace wood pole with concrete
  • Shield wire replacement
  • replace age and corroded shield wire
  • Hazard tree removal
  • target trees off of the right-of-way that pose a
    threat
  • 69 KV line outage reduction program
  • Crossarm and insulator removal
  • Replacement with polymer post insulators
  • Replace bonding and grounding

14
Transmission System Metrics
15
Transmission System Metrics
16
Transmission System Metrics