1Entergy TransmissionAsset Preservation
Department2004 Objectives
- Entergy Transmission Planning Summit
- New Orleans, LA
- July 10, 2003
2 Asset PreservationTransmission 2004 Objectives
- Improve Transmission System Reliability
- Reduce Transmission System Average Interruption
Frequency Index (TSAIFI) - Reduce Transmission System Average Interruption
Duration Index (TSAIDI)
3Main SubstationTransmission Outage Causes
- Switches
- Breakers
- Relay Misoperations
- Arresters
- Potential Current Transformers
Substation-Related Outages by Cause (System)
4Substation Equipment Age
- Description Qty.
- Transmission Transformer (270)
- Average age 28 years
- Description Qty. Qty.
- H V Circuit Breaker Oil (1700) Gas
(780) - Average age 32years 12years
5Improve System ReliabilitySubstation Equipment
Maintenance
- Transformer Maintenance
- Dissolve Gas Analysis every year
- TTR (Turn to Turn Ratio) every 4 years
- Doble Test and Meggar Test every 4 years
- Load Tap Changer inspection every 2 years
6Improve System ReliabilitySubstation Equipment
Maintenance
- Circuit Breaker Maintenance
- Speed test and External Inspection every 5 years
- Oil dielectric test every year
- Power factor bushings every 10 years
- Test SF6 moisture for Gas Circuit Breakers every
5 years - Substation Inspections
- Visual inspection every month (Infrared,
coronascope, SF6 Gas detection camera,
ultrasonic detector) - Relay Maintenance
- DC Operational Test Panel Inspection every 4
years - Relay Calibration every 4 years
7 Reduce TSAIFI and TSAIDISubstation Outage
Reduction Programs
- Circuit Switch Replacement
- replace damaged components
- Arrester Replacement
- replace silicon carbide arresters with MOVs
- Breaker Replacement
- replace aged breakers that are obsolete
- Breaker Additions
- install breakers in strategic substations to
isolate the majority of customers from outages
and reduce the length of the outage - Automatic Sectionalizing
- Add motor operated switches allowing remote
sectionalizing - reducing outage times
8 Reduce TSAIFI and TSAIDISubstation Outage
Reduction Programs
- RTU Retrofits
- Install new RTUs in stations without one,
reducing outage duration - Replace obsolete equipment on a priority basis,
reducing outages and outage duration - Pin and Cap Replacement
- replace pin cap insulators with new station
post insulators - Circuit Switcher Replacement
- replace damaged components and aged equipment
- Transformer Life Extension
- Re-blocking and Re-gasketting
- (Depends on age, manufacturer, size, paper and
clamping type of the unit)
9Main Transmission Line Outage Causes
- Lightning
- Line Material Failure
- Vegetation
- Storms
- Contamination
10Transmission Line Miles
11Transmission Line Age
12Improve System ReliabilityT-lines Maintenance
cycles
- Climbing inspection
- 8 Year cycle
- Aerial patrol
- System is flown 2 times per year
- Vegetation
- Urban tree trimming 3 Year cycle
- Mowing 2-5 Year cycle
- Herbicide 4-5 Year cycle
- Side trimming of ROW 9 Year cycle
- Osmose - Ground line inspection
- North Louisiana and Arkansas 12 Year cycle
- Mississippi and Texas 10 Year cycle
- South Louisiana 8 Year cycle
13 Reduce TSAIFI and TSAIDIT-Line Outage Reduction
Programs
- Wood pole replacement
- replace wood pole with concrete
- Shield wire replacement
- replace age and corroded shield wire
- Hazard tree removal
- target trees off of the right-of-way that pose a
threat - 69 KV line outage reduction program
- Crossarm and insulator removal
- Replacement with polymer post insulators
- Replace bonding and grounding
14Transmission System Metrics
15Transmission System Metrics
16Transmission System Metrics