Title: Thoughts on TIPHON document structure July 2000
1Thoughts on TIPHON document structureJuly 2000
19pTD007
2Disclaimer
- Please note that this is a personal view of where
TIPHON is and where it is going. - It is probably not complete
- It is possibly not correct
3TIPHON goals
- ETSI/TIPHON Release 3 is scoped to standardize
the delivery of telephony services across fixed
mobile switched circuit networks (SCN) and IP
telephony - Five scenarios
- 0. IP-gtIP
- 1. IP-gtSCN
- 2. SCN-gtIP
- 3. SCN-IP-SCN
- 4. IP-SCN-IP
4TIPHON Release 3 (2000)
- Scenario 1-4
- Inter-domain basic call with basic features (e.g.
CLI) - Basic security, enhanced security following
threat analysis. - Basic OAM
- QoS signalling/Firewall control
- INAP feature access
- ISUP based service interaction, e.g. CCBS
- Number portability
- User mobility, terminal mobility, and radio
access aspects
5TIPHON release 4 (2001)
- Scenario 0-4
- More features
- Multimedia
- Terminal aspects
6TIPHON activity scope
Service definitions
MoU
MoU
MoU
MoU
TIPHON scope
Capability definition
Capability definition
Capability definition
Capability definition
Generic architecture
Reference point
Reference point
Reference point
Reference point
Reference point
technology
technology
technology
deployment
deployment
deployment
deployment
7TIPHON process
Main process
Specialist groups
Requests for service capabilities
WG4 Naming and Numbering
WG1 Service Capability Requirements
Validate
WG5 Quality of Service
Service capability definition
WG2 Architecture
WG7 Mobility Aspects
Architecture
WG3 Protocols
WG8 Security
Management (inter-body ad-hoc group)
WG6 Testing
Test specs
8TIPHON documents
WG4 ?????
WG1 100? service reqs 1006 transport reqs
WG5 5003 generic signaling 5009 QoS classes
WG2 2003 generic arch 2007 HOWTOs
WG7 ?????
WG8 8002 threat analysis 8003 Legal
Intercept 8004 authentication
WG3 H.323, SIP, H.248 ISUP, BICC, RTP...
WIs proposed in 19TD61, 62,63,64,66,67
WG6 ?????
Management ?????
9Conclusion
- WG3 has been suspended while the new architecture
was made - WG3 must be revived,
- new Work Items proposed,
- editors available
- WG1 is catching up with the new architecture
- process is ready
- requirements are underway
- WG5 is in alignment
- WG8 is in alignment
- Management status is unknown (to me)
- WG4 work seems to be captured in 2003 (???)
- WG7 work seems to be captured in 2003 (???)