Title: Sustainable ICT Applications Winner: Braintree District Council


1
SUSTAINABLE ICT AN overview British Computer
Society 14th November Professor Peter
James www.susteit.org.uk

2
ICT BENEFITS SMART 2020
  • Environmental- Cut global CO2 emissions in 2020
    by 15, with 946 billion of cost savings- Avoid
    c 5 tonnes of CO2 emissions through applications
    for every tonne created by production, use
    disposal of equipment
  • Social- e.g. access overcoming disability

3
ENERGY CARBON FOOTPRINT
  • Downloadable tool www.susteit.org.uk
  • Default assumptions or your own data
  • University of Sheffield- 19 of non-domestic
    electricity- 1 million bills in 2009- PCs
    higher than expected- Data centres/networks
    lower than expected

4
FOOTPRINTING RESULTS
University of Sheffield University of Sheffield (ex HPC) Lowestoft College City College Norwich
Total Electricity (kWh) 8,680,806 (100) 7,472,188 (100) 453,714 (100) 1,241,700 (100)
PCs and monitors 4,164,477 (48) 4,164,477 (56) 197,402 (44) 510,896 (41)
Servers 1,520,736 (18) 1,520,736 (20) 135,999 (30) 226,665 (18)
HPC 1,208,617 (14) 0 0 0
Imaging 835,659 (10) 835,659 (11) 42,171 (9) 236,901 (19)
Networks 687,362 (8) 687,362 (9) 68,538 (15) 156,629 (13)
AV 61,598 (1) 61,598 (1) 7,482 (2) 89,936 (7)
Telephony 202,356 (2) 202,536 (3) 2,122 (lt1) 12,790 (1)
5
FHE - A LARGE ICT FOOTPRINT
  • 2 of global CO2 emissions
  • ICT in UK HE- 760,000 PCs- 215,000 servers-
    147,000 networked printers- 512,000 Mwh of
    electricity- 275,000 tonnes of CO2 - over 60
    million in 2009

6
325,000 Coal-Powered Computers
7
EQUIPMENT LIFE CYCLE
Transport
Manufacture
Materials
Use
Disposal
8
KEY LIFE CYCLE QUESTIONS
  • Can we ever get a complete picture?- HP 1.5
    million tonnes CO2 eq direct- 4.5 million tonnes
    from Tier 1 suppliers
  • What balance of impacts across the life cycle?
    e.g. productionuse energy - Williams/UN
    University 41- EU Commission study 14
  • How can we influence upstream impacts?

9
DESKTOP LIFE CYCLE IMPACTS
10
POTENTIAL MEASURES BY IT?
Short Term
Medium Term
  • Specifying lower power equipment
  • Automatic powerdown of networked devices
  • Extending longevity
  • Modifying data centre layout
  • Increasing computer CPU utilisation
  • Virtualisation
  • Minimising storage
  • Thin client in specialised applications

11
CROSS-FUNCTIONAL MEASURES
Short Term
Medium Term
  • Awareness campaigns
  • Powerdown of non networked devices
  • Upgrading data centre power supply arrangements
  • Increasing use of videoconferencing
  • Maximum use of thin client where effective
  • Free cooling of data centres
  • Effective document and print management

12
CARDIFF UNIVERSITY
  • Low power servers
  • Chilled water cooling
  • Efficient layout
  • Efficient UPS
  • 30 support overhead

13
LONG TERM CHANGES
  • Less energy and material intensive desktops-
    cloud computing medium client- e-readers and
    total content
  • Zero carbon data centres
  • Pay as you go computing
  • Intelligent campus- from computer to building
    maintenance?

14
REMOTE COMPUTING
  • Direct outsourcing- Leeds Met using Google for
    student email and word processing (Google Apps)
  • Collaborative outsourcing- London MAN for backup
  • Managed service (e.g. accounting payroll)
  • Common data centres- YHMAN Derby/Salford/Sheffiel
    d Hallam- economies of scale/scope- greater
    location flexibility- expert suppliers

15
AVE MARIA UNIVERSITY
Fire Alarm System
CampusSecurity
Power System
IntrusionDetection
ElevatorMgmt.
Lighting Controls
Access Control(security system)
HVACControl
EvacuationManagement
SecurityUsers
Building Maintenance Users
16
QUEEN MARGARET UNIVERSITY
  • Wanted greenest building in UK
  • PCs main barrier
  • 98 thin client
  • 25-30 space savings