Dangerous Substance Usage Bottom Up Study - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Dangerous Substance Usage Bottom Up Study

Description:

POMS CG - RBD project co-ordinators / managers, EPA, Geological Survey of ... How is NI / Ireland co-operating with neighbouring Member States? SWMI Template ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 23
Provided by: GLA98
Category:

less

Transcript and Presenter's Notes

Title: Dangerous Substance Usage Bottom Up Study


1
A Future For Our Waters Joint Meeting of SWRBD
Technical and Steering Groups Regional Training
Centre, Ballincollig, Co. Cork 12th October
2006 The Significant Water Management Issues
Report Seán Ó Breasail Project Co-ordinator,
SWRBD
2
Significant Water Management Issues (SWMI) Report
Draft Template
  • Article 14 of WFD interim overview two years
    before the beginning of the river basin
    management plan

3
Significant Water Management Issues (SWMI) Report
Draft Template
  • Water issues
  • Management issues

4
Documents Reviewed
  • UK Technical Advisory Group template
  • Welsh Office RBMP guidance
  • Scottish Environmental Protection Agency contents
    and draft chapters
  • Environment Agency (England Wales) draft
    document
  • Schedlt document
  • French document

5
Consultations
  • SWAN - EEG
  • UK TAG River Basin Management Group
  • DEHLG
  • EHS (DoE NI)
  • NI stakeholders forum
  • POMS CG - RBD project co-ordinators / managers,
    EPA, Geological Survey of Ireland, National Parks
    and Wildlife Service, DEHLG
  • National Technical Co-ordination Group
  • North South Share Steering Group

6
Next Consultations
  • RBD-ACs two meetings, one before Christmas and
    one after
  • SWAN workshop one held 4th October, second one
    early December
  • RBD steering and technical groups
  • National Co-ordination Group

7
SWMI Template
  • Chapter headings
  • 1.0 Introduction
  • 2.0 Assessment of Pressures and Impacts
  • 3.0 Significant Water Management Issues
  • 4.0 Measures
  • 5.0 Next Steps and Conclusions

8
SWMI Template
  • Length
  • between 30 and 40 pages preferably 30
  • How many issues will be addressed?
  • 9 or 10
  • Language
  • Plain English (non technical)
  • Use of question and answer format

9
SWMI Template
  • Timescale
  • publish 22 June 2007
  • comments of minister?/department?/NTCG?/SWAN? by
    22 May 2007
  • final draft 22 April 2007
  • POMS studies output 22 March 2007 national
    issues
  • RBD project output 28 February 2007 local
    issues
  • Agree template timescale 13th October 2006?

10
SWMI Template
  • Style
  • EPA style template / A5 or slightly bigger
  • Hardcopy vs electronic
  • Hard copy - alternative formats translations
  • Ownership of the Report
  • RBD lead authorities
  • NTCG POMS Co-ordination Group RBD projects
  • Consultation link to RBDAC

11
SWMI Template
  • RBD report vs National report
  • RBD report gives local ownership leads to draft
    plan
  • RoI 7 RBD reports
  • NI 3 RBD reports (plus insert for the Shannon
    RBD)
  • However as the main studies are national
  • Much of the content is generic
  • Each project will input to every SWMI
  • Requires close co-ordination

12
SWMI Template
  • 1.0 Introduction
  • Introduction to the WFD
  • What is the WFD?
  • What are its objectives?
  • What is status?
  • When must the objectives be achieved?
  • Who is responsible for implementing the WFD?
  • How is this being done?
  • What has NI / Ireland done so far?
  • What is NI / Ireland doing now? (further
    characterisation / surveys)
  • What will NI / Ireland do next?
  • How is NI / Ireland co-operating with
    neighbouring Member States?

13
SWMI Template
  • 1.0 Introduction (continued)
  • Introduction to the River Basin District
  • The (SE / Shannon / SW/ We / Ea / Neagh Bann / NW
    / NE) RBDs vital statistics
  • RBD protected areas
  • Why a SWMI report?
  • How can the public get involved and make a
    difference?

14
SWMI Template
  • 2.0 Assessment of Pressures and Impacts
  • What pressures and impacts have been assessed
  • Abstractions
  • Physical changes (morphology)
  • Point
  • Diffuse
  • Others

15
SWMI Template
  • 2.0 Assessment of Pressures and Impacts

  • (continued)
  • How have significant issues been identified?
  • What are NI / Irelands most significant issues?
    (analysis by RBD)
  • groundwaters / rivers lakes / transitional
    coastal waters
  • Does the RBD have any special significant issues?
    (analysis by RB or hydrometric area, with RBDAC
    input)

16
SWMI Template
  • 3.0 Significant Water Management Issues
  • for each of the following what is the issue, what
    new data, what new results, any knowledge of
    future trends

17
SWMI Template
  • 4.0 Measures
  • What are measures?
  • What existing NI / Irish measures support the
    WFD?
  • How can new NI / Irish measures be put in place?
  • SWMI what measures are needed and who will be
    involved?
  • (for each SWMI describe existing measures, gaps
    requiring future measures - national or local -
    and identify responsible parties and sectors)
  • Summary RBD programme of measures and responsible
    parties

18
SWMI Template
  • 5.0 Next Steps and Conclusions
  • Setting WFD Objectives
  • What are the WFD objectives?
  • What are alternative objectives?
  • Extended deadlines
  • Temporary deterioration in status
  • Designation as Heavily Modified Artificial
    Water Bodies
  • Less stringent objectives
  • The Role of Further Economic Characterisation
  • (scenarios?)
  • When will alternative objectives apply?
  • (indicative list of sites?)

19
SWMI Template
  • 5.0 Next Steps and Conclusions (continued)
  • Future characterisation work
  • Regulatory Impact Analysis
  • Strategic Environmental Assessment
  • Conclusions
  • Summary
  • Gaps and live issues
  • The draft first River Basin Management Plan
  • Future planning cycles
  • Consultations

20
SWMI Template
  • Discussion Issues
  • Harmonisation of reports for international RBDs
  • How to identify the SWMIs lines of evidence
  • Article 5 analysis
  • National reports
  • Historical catchment plans and water quality
    reports
  • Phosphorous Regulations
  • Stakeholder responses
  • Expert review
  • RBDAC input (issues good practice examples?)

21
SWMI Template
  • Discussion Issues
  • What to include on economics?
  • What to include on standards?
  • What to include on flooding?
  • Input needed on protected areas, if we are going
    to update these post Article 6?
  • Input needed on waterbodies, if we are going to
    update these?
  • Input needed from Department of Agriculture

22
SWMI Template
  • RDBAC Role
  • Identify key local issues?
  • Is the overall template workable?
  • Identify good practice examples?
  • RBD Local Issues
  • What issues are each project team going to
    address?
  • Co-ordination
  • What is the best way forward?
Write a Comment
User Comments (0)
About PowerShow.com