Title: Schlumberger Carbon Services
1Schlumberger Carbon Services
- French-Norwegian CO2 Seminar
- Oslo, 22nd - 23rd of November, 2007
2The Schlumberger CO2 Storage Workflow
3Schlumberger involved CO2 Storage Projects
Sleipner
Weyburn II
Ketzin
Karniow
MGSC
IdF
MRSCP
PCOR
COACH
Mountaineer
MOVECBM
InSalah
Hassi Touareg
Frio
CCP2
PETRONAS
Gorgon
Callide
Otway CO2CRC
4(No Transcript)
5Participation to Research Projects Consortia
DTI Project (ECCASEM)
EU Projects (SACS/CO2STORE, CO2ReMoVe, DYNAMIS,
MoveCBM, GeoCapacity, GRASP, CO2GeoNet,
CO2NET, ZEP)
Trans-national Projects (COSMOS-1/2)
Weyburn-2
MIT-CSI
EU/China (Coach)
Coal-Seq-II
GCEP
Battelle
US Regional Partnerships
SURE-NL - Netherlands
ANR / IPGP France
Frio-2
CSLF IEA-GHG Worldwide
CO2CRC / OBPP (Otway)
6Collaborative Research Projects
Rationale Technology demonstration, networking,
lobbying, technology/competitor watch
External research only
7European / Transnational Projects Related to CO2
- FP4-5
- SACS / CO2STORE
- FP6
- RECOPOL, CO2SINK, CASTOR
- CO2ReMoVe (IP)
- DYNAMIS
- MoveCBM (STREP)
- COACH (STREP)
- GRASP (RTN)
- FP7 1st call AQUACO2 (IP)
- EUROGIA (EUREKA cluster for energy)
- COSMOS-1 (Well integrity) Germany/France
- COSMOS-2 Germany/France
- National Programmes
- ANR (Geocarbone-Monitoring/Carbonatation,
Heterogeneites, - Proche Puits) France
- Aii (CCS project in Paris basin Area) France
- DTI (ECCASEM?CASEM) UK
8Schlumberger Carbon Services RD Activities
- CO2 Transport and Fate
- Reactive transport modeling
- Fluid flow
- Geochemistry
- Geomechanics
- Thermal
- Monitoring measurements
- Sensor development
- Interpretation and integration
- Model calibration
- Containment
- Risk Management Methodology
- Reservoir geomechanics (faults, caprock)
- Modeling
- Monitoring
- Well integrity
- completion degradation characterization
- Integrity monitoring
- Materials
- Remediation techniques)
- Injectivity
- Injectivity control near wellbore effects
- Injection operation monitoring
- Advanced hydro-fracturing techniques
- Injection optimization (well design, well
patterns)
9Potential Joint Project Participation
- Phases
- Site Selection
- Site Characterization
- Site Construction
- Injection/Monitoring Phase
- Site Closure
- Technologies
- Modeling (Petrel, Eclipse, Geomechanics)
- Characterization Measurement (Seismics, Logging
(WL/LWD)) - Well/Reservoir integrity (Drilling services,
completions, well integrity, cementing
technology, geomechanics, geochemistry, logging) - MV measurements (logging, 4D seismics, micro
seismics, EM, DTS (PT), shallow aquifer surveys)