Online Monthly Review - PowerPoint PPT Presentation

About This Presentation
Title:

Online Monthly Review

Description:

GLAST LAT Project Weekly I&T Meeting: I&T/Online May 5, 2005 ... CygWin. MinGW. Jim: 'It doesn't look good.' Still some wiggle room, but he's discouraged ... – PowerPoint PPT presentation

Number of Views:122
Avg rating:3.0/5.0
Slides: 7
Provided by: rcl7
Category:

less

Transcript and Presenter's Notes

Title: Online Monthly Review


1
GLAST Large Area Telescope IT Weekly
Meeting IT/Online May 5, 2005 Ric
Claus Online Manager SLAC
2
Online activities
  • All of Online personnel observe Cleanroom
    operations
  • Everyone attends the 315 meeting
  • Learning about non-reported problems
  • Trying to find ways to reduce Operator Error
  • Beyond 2 towers
  • Housekeeping multi-pen strip chart GUI
  • Parallelizing INT scripts
  • Trying to move some LATTE 5 features into
    production earlier (e.g., HSK, LATc)
  • More design work on LCI method of test script
    structure
  • E-logbook
  • Brian requested ability to search shift logbook
  • Quickly provided with Google Desktop
  • Stand-alone e-logbook issue?
  • Implementing requested improvements

3
Online progress
  • LATTE 4.9.0
  • CCB JIRA number 34
  • GPIB support for Agilent power supply (Brian)
  • RS-485 support for BPU Simpson meters (Brian)
  • FSW multi-tower PIG bug (Lester)
  • FSW PIG behavior provides source of OE for
    Testers
  • ACD (ancient) GASU problem (Jim provided
    work-around and a fix for LATTE)
  • LTE-254 SW verification passes, but in elog, the
    SW shows red. Fix this inconsistency (Brian)
  • LTE-251 If rcReport generation fails, wrong
    rcReport line is extracted from rcReport.out
    during export
  • LTE-257 Message logger does not launch
  • More?

4
Online progress
  • LATTE 5
  • Exposing VSC interface to Python
  • Trying to pin down the core architecture
  • Having difficulty compiling combined LATTE FSW
    in any Windows environment
  • Visual Studio
  • CygWin
  • MinGW
  • Jim It doesnt look good. Still some wiggle
    room, but hes discouraged
  • Move to Linux?
  • Build with multiple compilers and tie EXEs
    together with network code (cumbersome,
    performance hit, extra work and maintenance)

5
LATTE 5 overview (updated)
Flight Software (Vx Works)
S/C VSC
LATTE 4-5
CMD
CMD
CMD
CMD
CMD
CMD
CMD
CMD
CMD
1553
Script
Commanding
Reset
GPS
Raw Arch
Raw Arch
XML Schema Config
LATc
1 PPS
LATc file
Discretes
DisplayClient
Monitoring
MySQL
UN-CCSDS
Analysis
UNCOMPRESS
Consumer
ScienceData
Science Data
UN-CCSDS
LDF
LDF
Etc
6
LATTE 5
  • Lots of possibilities

1553, etc.
CCSDS
SA SIIS
TestExecutive
LAT
VSC
TestExecutive
LAT
ITOS
TestExecutive
LAT
Some SIIS?
Time-tagged STOL
TestExecutive
LAT
Ethernet
TestExecutive
LATsimulator
Ethernet
Write a Comment
User Comments (0)
About PowerShow.com