THE BOUNDARY BETWEEN TRANSMISSION AND
DISTRIBUTION
CIRED presentation by M.S. Vanden Berghe
24 May 2007
2
The Elia group
  • Elia was founded on 28 June 2001
  • Elia Elia System Operator, Elia Asset and Bel
    Engineering
  • shareholdings in the Belpex and Powernext
    power exchanges
  • Owner and operator of the 380 kV-30 kV HV
    transmission system
  • - 8,000 km of overhead lines and cables
  • - 800 HV substations
  • - 20,000 pylons
  • - system users clients
  • 300 companies connected
  • 26 distribution system operators
  • 50 access responsible parties
  • 1,230 staff spread over 12 sites
  • NB HV high voltage and MV medium
    voltage

3
Role of the system operator
  • Operator of the 380 kV-30 kV HV system
  • operation maintenance development
  • Operator of the electricity system
  • - key role played by dispatching offices
    control centres
  • Market facilitator gt transparent, objective
    access
  • - Belpex power exchange
  • - objective allocation of border capacity
  • - organisation of the hub
  • - system of nominations
  • ? via the development of e-business

4
Background
  • Before 1990 Unerg-Ebes-Intercom
  • 1990 Electrabel
  • 1997 CPTE ? 30kV-380 kV
  • step-down and coupling substations
  • 2001 Elia ? 30kV-380 kV
  • transformers and incoming MV bays
  • Corporate governance
  • ? Shareholders Publi-T 30, ELECTRABEL
    27.45,
  • Arco Group 4.3, Publipart 2.55 and the
    free float 35.16
  • (situation as at 31 December 2006)

5
The boundary between transmission and distribution
  • The injection transformers'output to the MV
    network determines where the infeed point is
    located
  • point where the TSO assumes responsibility for
    the quality of electricity provided to the
    distributors (voltage, frequency, etc.)
  • boundary of activity between the TSO and DSO

6
Qualities of a transmission system
  • 380 kV-30kV MESHING to
  • optimise the reserve level
  • (lt pooling capacity)
  • improve the quality and reliability of deliveries
  • UNIQUENESS to
  • facilitate secure access to the system for the
    various players
  • improve the reliability and efficiency of the
    electricity system
  • ? more predictable operation
  • ? better overview of flows in real time
  • ? better management of critical situations
  • Systems lt 30kV ? radial systems

7
Structure of the electricity system
ALE
WVEM
INTER ENERGA
Distribution system operators (1)
15/12/11/10/6 kV
(1) Before liberalisation intermunicipal
companies
8
Regulators
380 kV
at federal level
CREG
Transmission system
150 kV 70 kV
ELIA
Regional transmission system
IBGE BIM
Local transmission system
CWaPE
30 kV ? 30 kV
VREG
Distribution system
0.4 kV
Wallonia
Brussels
Flanders
9
Cooperation agreements between Elia and DSOs
  • The distribution system operators (DSOs) are
    connected directly to Elias grid
  • Elia has concluded cooperation agreements with
    DSOs that cover, amongst other things
  • - the passing on of transmission tariffs to DSO
    clients via the latter (known as the cascade
    system)
  • - the exchange of meter data

10
New arrangement governing responsibility in
Flanders (1)
  • Interruptions of supply and incidents suffered by
    the DSO's customers, the causes of which are
    localised on the transmission system, will be
    handled by the DSO itself under the terms of the
    Connections Regulations
  • with the following consequences, amongst others
  • The DSO serves as a front office (exchanges of
    correspondence, assessment reports, etc.)
  • Settlement of disputes under the terms of
    cooperation agreements between the DSO and its
    users and between the DSO and Elia

11
New arrangement governing responsibility in
Flanders (2)
  • New arrangement governing responsibility
  • - introduction of the contractual link between
    system users, DSOs and Elia
  • - aims limitation of
  • the number of procedures (consultation,
    introduction of thresholds in contracts concluded
    between system users and the DSO, etc.)
  • the number of conflicts between operators (TSOs
    and DSOs)
  • internal legal and administrative costs
  • - benefit of contractual limits on
    responsibility stipulated in the Connections
    Regulations with DSOs