1
  • 3-D Production Scheduling

2
  • Pit Optimization
  • MineMAX Planner

3
iGantt Interfaces
4
1 Feature
  • Linkage between 3D view and Gantt chart
  • Click on a geometric object (solid or polygon) to
    see when it is scheduled
  • Click on a gantt chart bar to see where it is in
    the mine

5
Scheduling Methods
  • Visually from 3D view in context of assigning
    digging equipment
  • Gantt chart based scheduling
  • Automatically generate drill and blast activities
    from production schedule with precedences
  • Related batter work development scheduling

6
Stockpiling Module
  • Automatically compute stockpile runs
  • Splits out defined products
  • View composition of stockpile as you schedule
    mining production
  • Combination and equipment scheduling with
    stockpile run management
  • Match stockpile completions to production
    requirements

7
iGantt Geometry Imports
  • Solids
  • Vulcan (.00t), Surpac (.dtm), Datamine (.dm)
  • DXF (.dxf)
  • Strings
  • Vulcan (.dgd), Surpac (.str), Datamine (.dm),
    Micromine
  • DXF (.dxf)
  • Block Models
  • Vulcan (.bmf), Surpac (.mdl), Datamine (.dm)

8
Modeling Enterprise
  • Bottom Up
  • Individual Sites
  • Create production sequence for a site
  • Model detail of site re equipment allocation
  • High Level
  • Combine site sequences in global analysis
  • Make strategic decisions regarding rates of
    different sites

9
Features 1
  • Interactive Gantt Chart-based Scheduling
  • Activity-based or resource-based scheduling
  • 3-D point and click scheduling
  • Create activities from
  • Numerical Model ODBC Database or File import
  • Geometric Model strings or wireframes

10
Features 2
  • Definable Attributes and Activity Types
  • Assign precedences between Activities with
    optional allocation of lag
  • Definable Reports
  • Define View by Attributes (Mine, Pit, Bench,
    Blast, Block)
  • Calculable attributes (a1 f(a2,a3))

11
Attribute Formulas
12
iGantt Optimization Module
  • Find the Optimal Solution using
  • Constraints - Development, Tonnage, Blending
  • Objective - NPV, Ounces
  • Time Periods - User Defineable
  • Optimization - Maximize Objective
  • Results - Gantt Chart and 3-D View

13
Optimization Time Periods
14
Optimization Constraints
15
Optimization - Objective
  • Choose attribute to be used as objective for
    optimization

16
Conclusion
  • Easy to use visual scheduling
  • Open cut or Underground
  • Integrate long-term with short-term
  • Two way integration with GMP
  • Integration with corporate databases
  • Powerful scripting capabilities