1
Timing questions
  • To chop or not to chop
  • Trench test of fiber system (vs coil in oven)
  • Sector test the copper part (local
    distribution, per Franks diagram).
  • Can we have maintenance day where we replace a
    local timing module, and come back up with
    everything phased/timed the same? So we dont
    have go through and re-time everything.
  • Two-channel receiver comparator scheme to be
    demod (redundancy scheme).
  • Is there a credible low-cost way of building a
    vcxo with sufficient performance?
  • Look at different schemes to meet the bunch
    compressor requirements.
  • Demo the wavelength tuning trick over realistic
    temperature range.
  • Failure modes and effects analysis.
  • Pursue HOM phase detector scheme.
  • How can we take advantage of linac symmetry to
    reduce stability requirements?
  • Develop integrated timing system diagram
  • Develop integrated timing system requirements
    table
  • Develop integrated timing system master sequencer
    requirements.

2
Timing questions 2
  • Separate local timing system (or piece) for each
    accelerator area, eg damping ring?
  • Is there going to be a phase ramp? Or positron
    trombone?
  • How do they do circumference feedback in damping
    ring? Has a chicane.
  • How do we deal with 60Hz (50Hz) AC line sync? 5Hz
    sunk to the 60Hz, with fine time set up to make
    positron damping ring work.
  • Does MPS timing have to be handled differently
    (more robust)? Tom make whole timing system
    robust enough so we can use it for the MPS.
  • What is the master frequency? 13xxxxxxxx.xxHz?
    /-what?
  • How do we prevent things being changed that might
    impact MPS? (LHC locks down all adjustable
    quantities)
  • Rad damage issue for fibers (probably fine for
    parallel tunnels)? Damping ring?
  • Need to run fibers in separate trenches (dynamite
    test)
  • Can we keep running (for some time) with a broken
    fiber (lost redundancy)?
  • Who owns what with MPS? Treaty points
    Ops/Controls GG, Instr TG, AGs, etc
  • What (overall) MPS topics need to get raised at
    higher level (chicanes, dumps, etc)?

3
General controls questions
  • Where do we put UPS?
  • To what level do we have redundancy in power
    system?
  • Who costs the central computing servers and
    networks (assume Controls)
  • Where do we put machine info such as magnet field
    calibrations (in the ps?)