Title: Flow Time Analysis (Ch 4 of MBPF)
1Flow Time Analysis (Ch 4 of MBPF)
2Flow Time Analysis
Inputs
Outputs
Processing System
Flow time processing time wait time (total
time in the box)
T
Theoretical Flow Time is the time to process a
typical flow unit assuming NO waiting.
3Flow Time Analysis
- Total amount of time for a flow unit to flow from
the entry to exit point of a process - Includes delays and work
- Includes value added and NVA activities
- Shortening flow time often good
- Decrease response time (Dell computer)
- Reduce inventory (less tied up in WIP)
- New product/service development (auto)
- Robust to short product life cycles
- Fast feedback on quality problems
- An indicator of overall process excellence
4Process Flow Charting
- Flow charts are graphical representations of
processes - May capture inputs, outputs, activity network,
resources used, locations visited, decisions or
business logic, buffers and delays - Many tools available, well use iGrafx Process as
it is bundled with our MBPF text - Very good flow charting engine
- Numerous templates for various kinds of common
business diagrams - Also has a relatively easy to use and pretty
powerful process simulation capability. We will
use this.
5To learn iGrafx Process, start by doing the
Tutorial on Creating Process or Swimlane
Diagram which you can find in the iGrafx
Tutorials menu or iGrafx Help menu. This tutorial
does NOT cover the simulation features of iGrafx
but instead just gets you started building
process diagrams. Well learn the simulation
features as we move along in the semester.
6Process Flow ChartsUsing PowerPoint or iGrafx
Process
Wait/ Buffer
Activities/Subprocesses
Start/End Events
Decision
Use AutoShape - Flowchart
Use connection tool
Activity Precedence
7Old Medical Transcription Process
Physician dictates into tape recorder
Start Exam
Physician reviews report
Print Report
Transcribe into word processor
Wait
Wait
yes
Changes?
Send report to medical records dept.
End Process
no
8Subprocesses and Cascading
9Process Flow Charting in Practice
- Multi-disciplinary team
- Have each team member do own flow chart
- Why?
- Group facilitator or group tries to reach
consensus on process flow chart - Yellow sticky notes
- Examine and revise by group
- Examine parts
- Dont get buried in details
- Genuine disagreement may occur
- More flow charting resources
- A Fresh Look at Flow Charting
- http//www.q-skills.com/flowchrt.html
- Flow Charting Help Page
- http//home.att.net/dexter.a.hansen/flowchart/flo
wchart.htmDefinition - Flow Chart Overview
- http//deming.eng.clemson.edu/pub/tutorials/qctool
s/flowm.htm
10Other Process Description Tools
- Swim lanes or Service System Maps
- Enhanced flow charting technique using bands to
delineate department participation in process
steps - Variants can use color or other features to
represent more process information - iGrafx Processes are of this type
- Process Activity Charts
- See next slide and Excel file ProcessActivityChart
.xls
11Example X-ray
12Finding Theoretical Flow Time Sequential Process
13Finding Theoretical Flow Time Sequential
Parallel
Path 1 1-3-5-7-8 (T180)
Path 2 1-2-4-6-7-8 (T290)
T is the length of longest path through the
process The path associated with T is called the
Critical Path Activities on the Critical Path are
called Critical Activities
14Finding the Critical Path
- If process is simple, we can
- enumerate all the possible paths
- Calculate their length
- Find the longest path
- If process is complex, may be too many paths to
enumerate - Various algorithms exist for this
- See Appendix of Chapter 4 in MBPF for Critical
Path Method - Same method as used to find critical path in
project management networks (e.g. MS Project)
15Observations about Critical Path
- Delaying an activity on CP will increase T
- Activities NOT on CP can be delayed to some
degree without increasing T - Speeding up activities on the CP will decrease T
- Speeding up activities NOT on the CP will NOT
decrease T - The CP can change as we change the activity times
- We are still assuming the activity times are
known deterministic quantities (no randomness)
16Flow Time MeasurementThe Direct Method
- Observe the process over some specified, extended
period of time - Take random (or exhaustive) sample of flow units
- Calculate flow time, T, for each by (tend
tstart) - Calculate average T over sampled flow units
- Example CalcFlowTime.xls
17Flow Time MeasurementThe Indirect Method
- Observe the process over some specified, extended
period of time, t - Measure number of flow units, N, processed over
the time period, t - Compute throughput, RN/t
- At random points in time, count the number of
flow units in process. Compute the average of
these counts (well call it I) - Use Littles Law to estimate TI/R
Lets revisit CalcFlowTime.xls
18Actual Flow Time vs. Theoretical Flow Time
- Most processes have numerous delays
- Estimate avg. delay times and treat as activities
- Value added vs Non-value added activities
- See Example 4.7 (p86) for X-ray process example
- Problem 4.1 in MBPF
T 55
TA 70
Flow Time Efficiency T/TA 55/70 .786
Many real processes have very low Flow Time
Efficiency
19Levers for Managing Theoretical Flow Time
- We are ignoring waiting/delays for now
- Three broad methods for reducing T
- Eliminate Reduce work content of a critical
activity - Work in parallel Move some work content off of
the critical path - Select Modify the product mix
20Eliminate
- Roots in scientific management and industrial
engineering - Some combination of
- Eliminate NVAs (work smarter)
- Classic BPR example Ford Accounts Payable
- Reduce repetitions of task (less rework)
- Build quality into process (poke-yoke)
- Statistical process control
- Design for manufacturability
- Workforce training
- Increase speed (work faster)
- Incentives
- Better technology
- More resources
21Work in Parallel
- Move work off CP to non-critical activity
- Move work off CP to outer loop
- Pre or post processing
- Examples pre-authorization, pre-admission
testing, pre-registration - Usually requires process redesign
- Often some enabling communications technology
required to facilitate parallel work - Example concurrent engineering facilitated by
CAD and high bandwidth networks allowing
transfer/sharing of large electronic files
22Reengineering/Redesign
The fundamental rethinking and radical redesign
of business processes to achieve dramatic
improvements in critical contemporary measures of
performance such as cost, quality, service and
speed.
Reengineering the Corporation, Hammer and Champy,
Harper Business (1993)
23Process Reengineering A 1st Look
- Radical rethinking/redesign of processes
- Clean sheet of paper
- Benchmark best practices
- Commitment from top leadership
- Question unconscious assumptions
- Value added vs. Non-value added activities
- Why redesign business processes?
- How to go about redesign?
- What is role of information technology?
- Relationship to continuous improvement, total
quality management? - Isnt reengineering just another word for layoffs
and downsizing?
24BPR Life Cycle
- Process Analysis
- Idea Generation
- Establish a goal and Define Scope
- Generate Strategies
- Evaluate and Select
- Design and Implement
- Sustain
25Why Redesign?
- Current process broken (or may not exist)
- No one seeing big picture
- No one questioning business assumptions
- Incremental improvement efforts insufficient
- Go beyond perspective of how we do things
- Processes critical to business success
26Classic Reengineering Principles
- Organize around outcomes, not tasks
- Have output users do the process
- Treat geographically dispersed resources as
though they were local - Link parallel activities instead of integrating
results - Put decision point where work performed and build
control into the process - Capture information once, and at the source
Reengineering Work Dont Automate, Obliterate,
Hammer and Champy, Harvard Business Review
(July-Aug 1990)
27IHI Redesign the System (p42-53)
- Do tasks in parallel info gather during waits
- Use multiple processes ED fast track
- Minimize handoffs reduce unit transfers
- Synchronize surgery starts at incision
- Use pull systems pull asthma from ED to clinic
- Move steps closer together registering ED
patients in treatment area - Use automation - PACS
- Consider people to be the same system
self-scheduling of surgery by surgeon office - Use multiple processing units increase staffing
- Extend the time of specialists nurse aide
- Convert internal steps to external outsource
transcription
28The 5-step BPR Framework
- Develop the Business Vision and Process
Objectives - Identify the Processes to be Redesigned
- Understand and Measure the Existing Process
- Identify IT Levers
- Design and Build a Prototype of the New Process
The New Industrial Engineering Information
Technology and Business Process Redesign,
Davenport and Short, Sloan Management Review
(Summer 1990)
29The Fad That Forgot People
Reengineering didnt start out as a code word for
mindless bloodshed. It wasnt supposed to be the
last gasp of Industrial Age management. I know
because I was there from the beginning. I was one
of the creators.
The Fad That Forgot People, Davenport, T.H., Fast
Company, November 1995.
30BPR What Happened?
The Fad That Forgot People, Davenport, T.H., Fast
Company, November 1995.
- Started as real people with real problems
- Ford Motor Co., Mutual Benefit Life, HP
- Synthesis of 3 concepts
- Technology
- Business processes
- Clean-sheet-of-paper approach
- Companies did stuff, academics and consultants
started to model make - Davenport, Hammer and Champy wrote bible
articles and books
31The Feeding Frenzy
The Fad That Forgot People, Davenport, T.H., Fast
Company, November 1995.
- Top managers big-time consultantsIT vendors
- Early successes were trumpeted
- Projects labeled BPR
- People always looking for magic solution
- Consultants started packaging BPR services
- Big contracts
- Executives needed to justify spent
- Layoffs quickest way to realize savings
- IT firms selling hardware, software AND
reengineering consulting
32Reality Bites
The Fad That Forgot People, Davenport, T.H., Fast
Company, November 1995.
- Massive layoffs labeled reengineering
- Alienation of good employees
- Treated as interchangeable cogs in corp. machine
- 25 yr old MBAs making 80K as BPR experts
- Major project failures
- Consultants start repositioning for next wave
- And sell BPR to rest of the world
33The Good Stuff
The Fad That Forgot People, Davenport, T.H., Fast
Company, November 1995.
- Focus on business processes
- IT only useful if it helps people do work
- A Lesson The bigger the hype, the greater the
chances of failure. - Techniques and tools of BPR can still be useful
34The Next Big Thing
The Fad That Forgot People, Davenport, T.H., Fast
Company, November 1995.
- Remember the lessons of BPR
- Dont drop all your current approaches for the
handsome newcomer - Dont listen to most charismatic advocates,
listen to most reasoned advocates - Talk softly
- Carry big ruler to measure real results
35Defining Characteristics?
- Statistical process control
- Total quality management
- Business process reengineering
- Theory of constraints
- Lean production methods
- 6-Sigma
- Lean/6-Sigma
- Operations research management science
36Process Capacity
- Recall flow basics
- Rflow rate
- Tflow time
- Ooccupancy
- Process capacity Maximum sustainable flow rate
of a process - A resource pool is a set of interchangeable
resources
O RT (Littles Law)
37How capacity gets used
Idle
Time
Unavailable
Busy
38Find the bottleneck
T16 mins
T22 mins
C1 2 units
C2 1 units
R1 2 / 6 0.333 pats/min 20 pats/hr
R2 1 / 2 0.5 patients/min 30 pats/hr
Bottleneck is first activity.
39Finding the Bottleneck Not Easy
- Complex business processes make finding
bottlenecks far from easy - Process improvements can shift the bottleneck
- GM and the C-More story
40Problem 3.4 ER Flow Chart
- Read Problem 3.4 on p69
- This is first problem on HW3
- Lets draw the flow chart in iGrafx Process