LINK 2000 PSG 22 - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

LINK 2000 PSG 22

Description:

Develop Integrated Implementation Plan for ANSPs (core area) implementation ... General tutorial information ... Network Planning Document. High level guidance ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 22
Provided by: augustin
Category:
Tags: link | psg | area | network | tutorial | wide

less

Transcript and Presenter's Notes

Title: LINK 2000 PSG 22


1
LINK 2000 PSG 22
  • Link Integration Team Report
  • Augustin Gheorghe

2
LIT Objectives 2009
  • Provide concrete technical support to ANSPs and
    Airlines
  • Perform Testing with avionics - PM-CPDLC
    implementation
  • Perform Testing with ANSPs - PM-CPDLC
    implementation
  • Develop Integrated Implementation Plan for ANSPs
    (core area) implementation
  • Finalise Technical Guidance to Implementers
    (Airlines and ANSPs) based on lessons learned
    from Pioneer Phase
  • Conclude on the target NPD
  • Monitor system performance in the operational
    environment
  • Finalise plans for VDL2 Multi-frequency
    testing/implementation
  • Develop LISAT MOON integration (through PRISME)

3
Content
  • EUROCONTROL Specification on DLS
  • VDL Mode 2 Activities
  • White Papers
  • Multi-frequency
  • ATN Provider Abort
  • L2K Guidance Material Development
  • LINK2000 Statistics Reporting
  • Next LIT Events

4
Pre-LIT15 Meetings
  • Took place yesterday here in Bxl
  • Closed sessions in the morning
  • ARINC
  • SITA
  • FABEC
  • VDL2 Focus Group in the afternoon
  • VLD2 multi-frequency
  • VDL2 white papers
  • Guidance to implementers documents
  • Provider Abort issue
  • Ground Automated tool

5
EUROCONTROL Specification on DLS
  • Document Approved on 02 March 2009
  • Replaces the LINK Baseline document v 1.4
  • To be referenced by the AMC20-11 for
    airworthiness

6
Community Specification on DLS
  • EC Mandate to ESO for the development of
    Community Spec for Datalink Services Jan 09
  • Only ETSI reacted on the mandate
  • Mandate states in line with EUROCONTROL Spec,
    ICAO, EUROCAE etc.
  • EUROCONTROL will participate to the ETSI TG-25
    meetings
  • Document approval by the group planned mid
    March 2010

7
VDL Mode 2 Activities
  • White Papers
  • ATN A/G Router Proliferation
  • Discourage proliferation of A/G Routers with
    limited geographical connectivity to be
    included in the NPD
  • ATN Routing Ambiguity following VDL Handoff
  • Conclusions to be documented in the Guidance to
    Airborne implementers document
  • Default VDL Service Provider (ACSP) for non-AOC
    Operators
  • Discussion on-going institutional solution
    agreed in principle
  • VDL2 Monitoring (MOON)
  • Detect non-compliance to standards as soon as
    possible
  • Interoperability efficiency, protecting
    performance spectrum
  • Monitor traffic growth and timely prepare
    channels deployment
  • Extensively used during the PAs investigations

8
VDL Mode 2 Multi-frequency
  • EUROCONTROL VDL simulations predict at least
    three channels required to satisfy eventual
    LINK2000 load
  • Rapid growth of VDL M2 traffic expected following
    introduction of forward-fit mandate in 2011
  • Step-wise deployment of 4 VDL M2 protected
    channels foreseen (including the CSC)
  • Need to maintain efficient use of spectrum and
    scalability throughout deployment process

It has to work as soon as it is needed!
9
VDL M2 Multi-frequency Deployment
  • FMG SG/15 in Dec 08 was of opinion that full
    sharing of the frequency channels between all
    providers would be the most efficient one.
  • Co-ordination between providers to regulate use
    of channel
  • Avoid congestion
  • Maintain stability
  • Take account of transition
  • LINK2000 will prepare a Discussion Paper to
    commence dialogue with providers on co-ordination

10
VDL M2 Multi-frequency Validation (1)
  • Three phases validation strategy agreed
  • Phase 1 Laboratory testing
  • Phase 2 Flight trials in a limited VDL2
    multi-freq ground implementation
  • Phase 3 Airline flights in limited VDL2
    multi-freq ground implementation
  • ARINC 750 Troublemaker to emulate failures on RF
    link
  • Permits testing of error cases in Phases 1 and 2
  • SITA contracted to support validation via
    Maastricht UAC Contract
  • PM-CPDLC Pioneer avionics will support VDL
    Multi-Freq

11
VDL M2 Multi-frequency Validation (2)
2009
2010
2011
Q2
Q4
Q3
Q1
Q2
Q3
Q4
Q1
12
ATN Provider AbortsBackground
  • Escalating observation of PAs at UAC Maastricht
    during 2007-08
  • 1 in 20 CPDLC flights affected at start 2007
  • Worse than 1 in 10 by early 2008
  • Trend suggests progressive deterioration as
    equipped traffic grows
  • Significant risk to successful LINK2000
    Operations
  • Aggressive investigations initiated to understand
    origin and identify solutions
  • Provider Aborts arise from a number of different
    causes
  • Application related
  • VDL/ATN Comm related

13
ATN Provider AbortsStatus
  • Maastricht ES upgraded Nov 08 (35 overall
    reduction in PAs)
  • PAs during CPDLC Establishment reduced to
    negligible levels BUT
  • TP4 interoperability issue exposed with MkII CMU
  • Short term workaround expected April 09
  • Elevated CNO PAs appear due to single rogue VDR
  • Airbus test flight of FIN avionic configuration
    Sep 08
  • issues identified and corrected in FANS B
  • issues identified with VHF920 VDR correction
    under way
  • FIN will upgrade (Mar/Apr 2009) three airframes
    with VHF2100 VDRs
  • Performance will be monitored via LISAT and MOON
  • LINK2000 Flight Trials in Dec 08
  • No PAs observed
  • Several instances of high Channel Utilisation
  • Analysis continuing
  • Recent increase of BER PAs no VHF920 VDR
    involvement

14
ATN Provider AbortsWay Ahead
  • Continue dialogue with Airbus and RC
  • FIN and more recently BER
  • Monitor FIN PAs, following introduction of
    VHF2100
  • Finalise analysis of high Channel Utilisation
    observed on LINK 2000 Flight Trials

15
L2K Guidance Material Development (1)
  • Guidance to Implementers of L2K
  • Ground Implementers Airborne Implementers
  • Two main parts in each document
  • Introduction, system description and to do list
  • pointer to existing documents (No overlap)
  • NPD, NAP, Gen ACSP, etc
  • Lessons Learned/White papers (more detailed
    contents)
  • General tutorial information
  • Included in the Ground document Annex and refered
    to from the Airborne one
  • Submitted for LIT review comments
  • Comments by end April 09

16
L2K Guidance Material Development (2)
  • Network Planning Document
  • High level guidance on the LINK 2000
    communication infrastructure
  • To be amended with
  • institutional solution (preference) to Non
    AOC airlines (by alternative ACSP)
  • ATN A/G Router Proliferation
  • Generic ACSP Requirements Document
  • Proposed to L2K ANSPs as basis of ACSP SLA
    establishment
  • Version 1.5 released for comments
  • Multi-frequency support added
  • used as basis for UAC Maastricht Call-for-Tender
    for VDL Service

Possible revisions at later stage of Link2000
wide deployment using more real-time statistics
operational feedback
17
Link Statistics reporting
  • Based on regular (monthly) reports by ANSPs
  • Today, performed by Maastricht UAC
  • Future, ANSPs joining operations encouraged to
    participate
  • Communication via public web space
    http//www.eurocontrol.int/link2000/public/standar
    d_page/stats.html
  • LISAT LInk Statistics reporting and Analysis
    Tool

18
LISAT Overall perspective
19
LISAT status and plans
  • Initial deployment early 2008
  • Extensively used in PA statistics analysis
  • Tool enhancements to date
  • Significant Performance improvements
  • Additional filtering capabilities e.g. ops
    error, technical error, LACK time, etc.
  • Tool enhancements foreseen
  • Integration with PRISME for a/c REG and Flight
    data
  • Connection with MOON for VDL2 data

20
Next Events
  • Pre-LIT16 on 13 October 09

21
Conclusion
  • LIT Continues to Build Consensus
  • It is still here to help Implementersin an
    efficient way

22
Thank You
Write a Comment
User Comments (0)
About PowerShow.com