J. Sandberg, J. Tuozzolo, P. Rosas. RHIC spin flipper layout. 208.03o -167.493o. 30o Spin rotator ... 4 DC dipoles were measured and installed. in the tunnel ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 11
Provided by: mbai7
Learn more at: https://www.c-ad.bnl.gov
Category:
Tags: rhic | flipper | rosas | spin | status

less

Transcript and Presenter's Notes

Title: RHIC Spin Flipper Status


1
RHIC Spin Flipper Status
  • M. Bai, T. Roser, A. Luccio, Y. Makdisi, I.
    Marneris, W. Meng, P. Oddo, C. Pai, C. Pearson,
    P. Pile, T. Russo,
  • J. Sandberg, J. Tuozzolo, P. Rosas

2
RHIC spin flipper layout
-167.493o
208.03o
IP10
30o Spin rotator
-15o Spin rotator
  • Ac dipole x2
  • maximum field amplitude 100 Gauss-m
  • frequency sweep range 400 Hz
  • DC Spin rotator x4 DC dipole with vertical
    field
  • 2 in the center
  • integrated field strength 0.45 Tesla-m
  • dipole deflection
  • 100 GeV 1.35 mrad
  • 250 GeV 0.55mrad

3
RHIC spin flipper layout
4
Status
  • 4 DC dipoles were measured and installed
  • in the tunnel
  • the 500 A power supply for the 4 DC dipoles was
  • ready and are now in the Bldg 1010 high bay
    area
  • 2 ceramic pipes were made and coated with TiN
  • coils of the 2 ac dipoles were made and
    assembled
  • and are in process of being measured
  • supports for ac dipoles are made and installed
  • in the tunnel
  • vacuum group is working on installing beam pipes
  • including the ceramic ones.

5
Assembled ac dipole
6
Status
  • installation of cable trays in the tunnel is
    working
  • progress. Cabling starts as soon as the trays
    are
  • ready. Goal is to have it done before RHIC
    starts
  • AC dipole power supply
  • capacitors for the ac dipoles, cabinets and
    other
  • parts were ordered and expect to be
    delivered at
  • the end of January
  • Dynamic tuning for the ac dipole is under tuning
  • and the ados for the ac dipole control are
    also
  • under development
  • Expect ac dipoles are ready by the end of Feb.

7
Plan Goal
  • Without beam
  • measure the ac dipole frequency response on the
    bench
  • With beam
  • calibrate the 4 DC dipoles
  • Measure the local bump size
  • this can be done during the machine setup period
    as long
  • there is an opportunity
  • no polarization is needed
  • calibrate the ac dipole strength
  • in early March
  • no polarization is needed
  • commissioning spin flipping
  • at store
  • dedicated time either during APEX session or MD
    session
  • operational as soon as the commissioning is
    done. So, the goal is to commission it during 500
    GeV run and have it available for the 200 GeV run
    if it happens.

8
Simulation results
  • Single particle with spin tune 0.5
  • Spin flipper
  • Amplitude 20 Gauss-m
  • Tune 0.49 -gt 0.51
  • Sweep in half million turns

9
Spin tune meter
  • Instead of sweeping the spin flipper tune across
    the beam spin precession tune, one can also keep
    the spin flipper tune fixed nearby the beam spin
    tune. In this case, the stable spin direction is
    given by
  • The beam spin tune can be calculated by measuring
    the turn by turn horizontal and vertical asymmetry

10
Cost Estimate