Retaining walls needed replacing ... Rebuild and raise retaining wall (embankment to better ... Prefabricated retaining wall system to reduce the on-site works ... – PowerPoint PPT presentation

Number of Views:39
Avg rating:3.0/5.0
Slides: 25
Provided by: DCC53
Category:

less

Transcript and Presenter's Notes

Title: UPGRADE OF RURAL TRANSFER STATION AT EUMUNGERIE CASE STUDY


1
  • UPGRADE OF RURAL TRANSFER STATION AT EUMUNGERIE
    CASE STUDY

2
Existing Transfer Station
  • Constructed in the early 1990s to allow closure
    of village landfill

3
  • Unrestricted access
  • Retaining walls needed replacing
  • Lip of skip bin too high for residents to easily
    transfer waste

4
(No Transcript)
5
Issues
  • Illegal waste disposal as cheaper alternative to
    Whylandra Waste Depot
  • Escalating cleanup cost
  • Liability of restricting access and/or increasing
    supervision

6
Proposed Action
  • Rebuild and raise retaining wall (embankment to
    better align with the lip of the skip bin)

7
Method adopted
  • Prefabricated retaining wall system to reduce the
    on-site works
  • Violet Town Concrete Industries, Vic was the only
    supplier of retaining wall system for the height
    required
  • Prefabricated kit was easy to assemble
  • At least 5 cost saving compared to conventional
    design construction process

8
construction
  • Concrete piers constructed to support a series of
    I section steel posts (UBs).
  • Pre-stressed concrete panels were then slid
    between the posts.
  • Posts tied to concrete beam (deadman) in
    embankment to add structural stability

9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
experience
  • Reduced instances of spillage and indiscriminant
    dumping on the site