Background - PowerPoint PPT Presentation

About This Presentation
Title:

Background

Description:

Water, Toilets and Shelter. Safety of Beneficiaries ... Portable workstations will be introduced to service the elderly in community ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 12
Provided by: Velo8
Category:

less

Transcript and Presenter's Notes

Title: Background


1
(No Transcript)
2
INTRODUCTION
  • Background
  • Statistics
  • Geographical Area
  • Contractual Obligations
  • Challenges
  • Addressing the Challenges

3
BACKGROUND
  • Empilweni Payout Services has secured a Contract
    with the Mpumalanga Government to pay out Social
    Development Grants in cash.
  • This exclusively black owned company has been in
    operation for the past 8 months after taking over
    the contract from an former contractor.

4
STATISTICS
  • We started with 126 000 beneficiaries in December
    2000 paying to the value of R 60 000 000
  • After 8 months of being in operation we are now
    paying 180 000 beneficiaries to the value of R
    80 000 000 per month
  • That represents a growth rate of 40
  • 247 Pay points are paid monthly
  • 70 Has water
  • 65 Has toilets
  • 55 Has shelters
  • Pay point ranging in size from 100 to as many as
    3400 Beneficiaries
  • Servicing 18 Districts within 3 Government
    Regions (Highveld, Eastern Highveld and the
    Lowveld)
  • Empilweni is a Black Empowerment Group
  • Crime
  • 38 CIT Heists during the year 2000
  • The number has increased to as much 37 heists
    for this year
  • 4 CIT Heists (Only one was successful)
  • Geographical area

5
GEOGRAPHICAL AREA
6
CONTRACTUAL OBLIGATIONS
  • Payment
  • No more than a 1000 beneficiaries per pay point
  • Pay between 07H00 and 16H00
  • All new Pay Points should provide all the basic
    facilities
  • Water, Toilets and Shelter
  • Safety of Beneficiaries
  • Payment should be concluded within the first 13
    day of the month
  • Reconciliation should be done within the first 15
    days
  • Secure Government funds through proper security
    protocols

7
CONTRACTUAL OBLIGATION
  • Enrolment
  • Capturing of 10 digital biometric prints
  • Capture digital passport size photograph
  • Use enrolment database to authenticate
    beneficiaries for payment
  • Do ongoing Enrolment

8
CHALENGES
  • The 40 growth factor in terms beneficiaries (2
    current growth per month)
  • Introduction of new grants by the department (CSG
    Care Dependence)
  • Geographical area
  • Crime in the province (Many neighboring borders)
  • The future Norm and Standards to be introduced by
    the Department
  • Facilities at pay points
  • Queuing durations at the pay points
  • Fraud and corruption within the border aspect
  • The risk element of carrying large amounts of
    cash over great distances due to the oversized
    pay points

9
ADDRESSING CHALLENGES
  • After studying the overall challenge we as
    company presented the following solutions to the
    Provincial Government. It was approved and we
    are now in the implementation face.  
  • We have taken the biggest routes in the province
    and spit them in half.
  • Thus a route that used to be paid over 13 days
    will now be split in half.
  • The first 7 days now becomes 13 days and the last
    6 days now also becomes 13 days. Thus
    reducing the number of beneficiaries to be paid
    per day by half.
  • This allows as to now start later and finish
    earlier. (Inline with the new Norms Standards)
  • The amount of cash carried is cut in half
    limiting the overall risk.
  • The smaller number of people at the pay points
    now decreases the need and use of facilities like
    water, shelter and toilets.
  • Smaller pay sites means we can now by involving
    other stakeholders look for better developed
    locations for payment.
  • With the smaller number of beneficiaries we can
    now divide every day in to periods.

10
ADDRRESING THE CHALLENGES
  • We will then allocate grantees to the periods.
  • This will ensure that no person queues for longer
    than 2 hour since the periods will only be 2
    hours long.
  • We can easier attend to the needs of the aged in
    this way and the risk of death at the pay point
    in largely minimized.
  • Portable workstations will be introduced to
    service the elderly in community halls and other
    formal structures where shelter is available.
  • These portable workstations will ensure that we
    do not pay more than 350 beneficiaries per
    workstation.
  • With this solution we will be paying less than
    1000 beneficiaries per site as foresaid.
  • The labour induced by both the payment operator
    and the payment equipment will now be largely
    reduced solving the overlabouring of the
    equipment, which caused a lot of technical
    problems in the past.
  • Payment operators will also spend less time
    working on the system per day thus allowing them
    to be more alert when they engage in payment.
  • The new structure allows as to have more mobile
    units available for use in the smaller pay
    routes, providing a total solution (Not only for
    one region).

11
QUESTIONS
Write a Comment
User Comments (0)
About PowerShow.com