1T-76.115 Project Review
2Agenda
- Sales pitch (20 min)
- Project evaluation (15 min)
3What happened on different Iterations
- PP
- Project plan and requirement document were
released. - Everybody seemed to be happy with project plan
and user requirements document - I1
- The main architecture was built
- Some difficulties in adapting new techniques
- I2
- The functionality was implemented
- Some minor problems with wap, Web interface was
implemented with care - I3
- Product was tested and bugs were fixed
- Some new requirements were needed and Pilot
partially failed. - DE
- The final touch was given to the project
- The product is 100 bug free. No known bugs were
left to product
4Working hours
- The final number of hours 1306 that were reported
to Trapoli. The true number might be slightly
greater - The plan was to spend 1330 hours
- The Big Picture shows that although some
differences between persons in iterations the sum
of all work is still tolerable
5Quality metrics
Bug metrics
I1 I2 I3 DE Total
Reported 13 20 17 4 54
Closed 13 20 17 4 54
Open 0 0 0 0 0
Functional area Coverage Quality Comments
Web UI 3 ? Thoroughly tested
Questionnaire tool 2 ? In good shape
Screening with WAP 2 ? Tested enough
6Software size (Java)
PP I1 I2 I3 DE
Lines of Code in Methods (LOCm) 0 368 722 799 852
Number of statements (NOS) 0 261 572 657 701
Number of Lines 0 2859 6838 7095 7902
The system needs at least 65 MB of memory.
Recommendation 128 MB The system needs 85 MB of
hard drive space. Recommended 200 MB if mysql is
on same server. Works on both Windows and UNIX