BPM System Team - PowerPoint PPT Presentation

About This Presentation
Title:

BPM System Team

Description:

BPM System Team. R. Dickson. A. Freyberger. O. Garza. J. Musson. M. Keesee. D. Napier. P. Francis ... Crew Chief OWL Shift Log, 05-13-2004. Maintenance & Atlis ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 10
Provided by: jlab5
Learn more at: https://www.jlab.org
Category:
Tags: bpm | crew | system | team

less

Transcript and Presenter's Notes

Title: BPM System Team


1
BPM System Team
  • R. Dickson
  • A. Freyberger
  • O. Garza
  • J. Musson
  • M. Keesee

D. Napier P. Francis A. Delacruz K. Cole E.
Strong
2
BPM System Team Membersbpmteam_at_jlab.org
  • Richard Dickson System Owner (dickson_at_jlab.org)
    x5082
  • Arne Freyberger Diagnostics System
    (freyberg_at_jlab.org) x6268 Owner/Integrator
  • Omar Garza IC Group Leader (garza_at_jlab.org) x72
    57
  • John Musson IC Project Coordinator (musson_at_jlab.
    org) x7441
  • Marie Keesee BPM Software Support (keesee_at_jlab.or
    g) x7635
  • Dianne Napier 4CH BPM System Expert (napier_at_jlab.
    org) x6239
  • Ed Strong nA BPM System Expert (estrong_at_jlab.org
    ) x7229
  • Pete Francis SEE BPM System (francis_at_jlab.org)
    x7528
  • Beam Sync Lead Tech
  • Keith Cole nA BPM MoMod System
    (colek_at_jlab.org) x5920
  • Lead Tech
  • Anthony DelaCruz 4CH BPM Support
    Tech (delacruz_at_jlab.org) x7029

3
Agenda Minutes
  • BPM System Team Meeting 10-20-04
  • BPM Team Documents

4
System Status Spares
  • BPM System Maintenance\Current BPM Status

5
Ops-Prs
  • 2/4/6/8 E01 SOFs should be revisited
  • 2E01 SEE YSOF.bmp
  • 4E01 stack survey offset problem.bmp
  • 7A27 MoMod BPM Failed
  • 4E01 Errors
  • 4E01.bmp
  • Some North Linac SEE BPMs do not see pulsed beam
  • Test Plan written
  • 8E02 Beam position is erroneous
  • 8T08 set to bad by Ops
  • SEE BPM troubleshooting/Auto Fast SEE
  • 8E03 Erratic Readbacks
  • Orbit drifted
  • 4A11 BPM has bad position
  • IPM2A14 status set to bad by smyers
  • 4S00 set to bad by Francis
  • SL11 displays beam when BNP

6
Elogs/On-Call Issues
  • Hall B nA detecting injector noise
  • Hall B, Position instability at IPM2C21X
  • Crew Chief OWL Shift Log, 05-13-2004

7
Maintenance Atlis
  • MCC Scheduling Whiteboard
  • Atlis - Accelerator Task List
  • July Shutdown Activities_BPM Systems.xls

8
Upgrades
  • 4CH Replacement
  • E. Strong, K. Cole, D. Napier
  • In Conceptual/Prototyping Phase
  • Plan to install prototype during July down
  • Mux Controller/Mux Status Readbacks
  • D. Napier, O. Garza
  • Currently no status in hardware or software
  • Hardware design in progress

9
Test Plans
  • North Linac SEE BPM Position Readings in Pulsed
    Beam Mode
Write a Comment
User Comments (0)
About PowerShow.com