Title: Petition to Establish a 4th Heating Zone


1
Petition to Establish a 4th Heating Zone
January 6, 2009
2
Petition Request
  • RTF Issues
  • Create a 4th (Heating) Climate Zone
  • Review cost effectiveness of R-49 attic
    insulation and other weather sensitive measures
  • BPA Issue
  • Permit utilities to count the full savings for
    heat pumps from actual pre-existing equipment to
    the heat pump installed (conversions) for High
    Water Mark determinations.

3
Petitioners
  • Primary Supporters
  • Glacier Electric Cooperative - Cut Bank, MT
  • Vigilante Electric Cooperative - Dillon, MT
  • Fall River Electric Cooperative - Ashton, ID
  • Lower Valley Energy, Afton Wyoming
  • Secondary Supporters (may not directly benefit)
  • Flathead Electric Cooperative - Kalispell, MT
  • Lincoln Electric Cooperative - Eureka, MT
  • Mission Valley Power - Pablo, MT
  • Missoula Electric Cooperative - Missoula MT
  • Ravalli Electric Cooperative - Corvallis MT
  • Idaho Falls Power - Idaho Falls, ID

4
Current Heating Climate Zone Assignments
Heating Zone HDD Range Zone Average HDD
Zone 1 lt6000 5195
Zone 2 6000 7499 6785
Zone 3 gt7500 8360
5
(No Transcript)
6
(No Transcript)
7
TMY 3 HDD Are Approximately 5 Lower Than TMY 2
HDD
Heating Zone HDD Range Zone Average HDD
Zone 1 lt6000 TMY2 5195 TMY3 4935
Zone 2 6000 7499 TMY2 6785 TMY3 6445
Zone 3 gt7500 TMY2 8360 TMY3 7930
8
Issue 1 - TMY3 HDD Data Indicate the Need to
Revisit Heating Zone 3s Representative Weather
Site
Missoula TMY2 Zone 3 Weather Site Kalispell
TMY3 Zone 3 Weather Site?
9
Issue 2
  • Where to set the lower bound for Heating Zone 4?
  • Option 1 - Current Heating Zones cover 1500 HDD
  • Therefore Zone 4 gt 9000 HDD
  • (75001500)
  • Option 2 Set lower bound based on material
    changes in measure cost-effectiveness

9
10
Only 10 Weather Sensitive Thermal Shell Measures
AreAt the Margin Using the Current Zone 3
Weather SiteOnly 5 If a New Zone 3 Weather Site
is Adopted
Measure Missoula Current Zone 3 7323 HDD Kalispell New Zone 3 7928 HDD Butte Zone 4 gt 9000 HDD 9089 HDD
MF Retrofit - ATTIC R30 - R38 0.7 0.8 1.0
MF Retrofit - FLOOR R19 - R30 0.9 1.0 1.2
MF Retrofit - FLOOR R19 - R30 0.9 1.0 1.2
MH Retrofit - FLOOR R22 - R30 Blown 0.9 1.0 1.2
New MF - FLOOR R38 STD w/12"Truss 0.7 0.8 1.0
New MH - ATTIC R38 - ATTIC R49 0.8 0.9 1.1
New MH - VAULT R30 - VAULT R38 0.9 1.0 1.2
New SF - BGWALL R19 - BGWALL R21 0.8 0.9 1.0
New SF - FLOOR R38 STD w/12"Truss 0.8 0.9 1.0
SF Retrofit - ATTIC R38 - R49 0.9 1.0 1.3
11
Only 2 Weather Sensitive HVAC Measures AreAt
the Margin Using the Current Zone 3 Weather
SiteNone Are If a New Zone 3 Weather Site is
Adopted
Measure Missoula Current Zone 3 7323 HDD Kalispell New Zone 3 7928 HDD Butte Zone 4 gt 9000 HDD 9089 HDD
Existing SF - Convert Electric FAF w/o CAC to HSPF 8.5/SEER 14 Heat Pump w/PTCS Duct Sealing Commissioning 0.9 1.1 1.3
Existing SF - Convert Electric FAF w/o CAC to HSPF 9.0/SEER 14 Heat Pump w/PTCS Duct Sealing Commissioning 0.9 1.1 1.3
12
However, If 9000 HDD is Lower Bound Only One of
the Petitioning Utilities Would Fall in Heating
Zone 4
Petitioning Utility Residential Consumers TMY 3 HDD TMY 2 HDD/NOAA
Fall River Electric Cooperative 11,395 8,611 8,919
Glacier Electric Cooperative 5,500 8,192 8,898
Lower Valley Energy 18,599 9,664 9,847
Vigilante Electric Cooperative 7,248 7,787 8,246
13
Options
  • Adopt Kalispell As the Heating Zone 3 Reference
    Site
  • Accept Petition - Establish a New Heating Zone 4
    for Areas with gt9000 HDD
  • Adopt Butte As the Heating Zone 4 Reference
    Site
  • Reject Petition
  • In order for additional measures to be
    cost-effective, the lower bound of Zone 4 has to
    be set at a level which restricts its application
    to a single utility