BaBar - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

BaBar

Description:

Use LCG to produce significant numbers of MC events. Allow uses to run real analysis transparently on Grid Resources. Problems. Software ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 14
Provided by: chris512
Category:

less

Transcript and Presenter's Notes

Title: BaBar


1
BaBars Plans for the Grid
  • Chris Brew
  • CCLRC Rutherford Appleton Laboratory

2
Aims and Problems
  • Aims
  • Use LCG to produce significant numbers of MC
    events
  • Allow uses to run real analysis transparently on
    Grid Resources
  • Problems
  • Software
  • Data
  • Databases

3
Software
  • LCG Software model much better for Babar than EDG
  • Should be able to copy software releases to NFS
    mounted experimental software areas
  • Started to define protocol for bootstrapping
    babar env

4
Data
  • BaBar Has a new non-Objectivity Data model based
    on Root files
  • BaBar Jobs access data over homegrown xroot
    protocol (now being re-integrated into root)
  • BaBar Data registered in MySQL Bookkeeping
    Databases
  • Can we add xrootd protocol to SE?
  • Can we publish the info from out bbk DB into the
    RLS?

5
Databases
  • BaBars Configuration and Conditions DB is still
    Objectivity though work is underway to replace
    this.
  • Until then we have two options
  • Run only at BaBar sites where we can install an
    Objy Server
  • WAN access to centralised objy servers

6
BaBar UK Hardware
  • BaBar UK has 7 farms (500 CPUs) at UK
    Universites
  • Manchester has been converted to LCG whilst
    retaining access to local software
  • Still needs some work on making submission for
    local users easier

7
BaBarUK Hardware Plans
  • Plan for roll-out of LCG on BaBar Farms
  • Upgrade Farms to RHEL/SL (3 Months)
  • Upgrade 1 Farm (Bristol) with LCG (1-3 Months
    concurrent)
  • Upgrade all Farms with LCG using GridPP Frontend
    Machines (3 Months)

8
Solutions
  • Four Projects
  • MC Production on LCG
  • Analysis Submission Wrappers
  • BaBar Software installation
  • BaBar BBK DB and RLS integration

9
MC Production on LCG
  • Have MC Production via BaBar framework Globus
    to several UK Farms. Produced gt 20 Million events
  • Experiences with that makes us think transfer to
    LCG will not be too hard for sites that already
    have BaBar Software
  • Initial tests of this have already started
  • Output of BaBar Software installation project
    will feed directly into this as we expand to
    non-BaBar Sites

10
Analysis Software Submission
  • BaBar analysis software makes a number of
    assumptions about location and environment
  • Needs wrapper utility to bundle up users
    environment and reproduce it before running the
    job
  • James Wehner (Man) is working on this, taking the
    experiences from AliBaBar (GridPP1) and is
    producing a full LCG framework

11
BaBar Software Installation
  • BaBar Software available at RAL and Man via AFS
    from previous local install
  • script in known location to set-up environment
  • Need Grid Jobs to
  • Install basic BaBar Framework
  • Install software release
  • Remove Software release

12
BaBar BBK DB and RLS integration
  • BaBars new data model and xrootd data servers
    should fit nicely into the Grid infarstructure
  • Possible work needed
  • Integrating the RLS with the BaBar BBK DB
  • Adding the xrootd protocol to the SE
  • Not a small job! BaBar BBK has gt100M entries and
    is expected to grow to gt1 Billion by 2010
  • Need input from wider BabarGrid Community
  • Until this is ready we need a workaround using
    published Tags to locate datasets

13
Conclusions
  • BaBar (UK) is putting together a clear plan for
    exploiting LCG
  • This will be finalised at BaBarGrid workshop in
    Autumn/Winter
  • We have a plan for making our resources available
    to LCG and for making use of others
Write a Comment
User Comments (0)
About PowerShow.com