Description:

3 x 450 MVA, 500/220 kV Transformers Tripped at 15:10, 13-08, along with ... 66 kV Usta Mohammad Jhal-Magsi circuit tripped at 18:12, 09-08 ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 7
Provided by: depu8
Category:
Tags: tripped | update

less

Transcript and Presenter's Notes

Title: Update


1
WAPDA
  • Update
  • August 15, 2007

2
Supply Position _ Islamabad
  • Rewat
  • 3 x 450 MVA, 500/220 kV Transformers Tripped at
    1510, 13-08, along with
  • 500 kV Barotha Rewat Line
  • 220 kV Rewat ISPR Line
  • 2 x 132 kV ISU Rawal lines
  • 132 kV Rawal Zero Point line
  • 4 x 115 MW Generators at Mangla
  • Some Areas Manually Opened some X-Tripped to
    Avoid System Collapse
  • Causing Partial Interruption to areas of IESCO
    (including Islamabad), GEPCO, LESCO FESCO
  • Condition Normalized at 1617, 13-08

3
Supply Position _ Balochistan
  • Jhal-Magsi
  • 66 kV Usta Mohammad Jhal-Magsi circuit tripped
    at 1812, 09-08
  • Tower collapsed at location 121
  • Interruption to Jhal-Magsi
  • Restored at 1855, 13-08
  • Generator available in Jhal-Magsi since 28-07
  • Quetta Sibbi Circuits
  • 220 kV Double-Line Tower Collapsed on 06-08 due
    to land sliding
  • Rubble removed Tower Erected
  • Supply Restored at 1353, 14-08

4
Supply Position _ Balochistan
  • Lasbela
  • 132 kV KESC-Hub Chowki line tripped at 2002,
    12-08
  • Tower collapsed due to blast near Hub Chowki
  • Interruption to Lasbela District
  • Under KESC operational control
  • Material shifted, work in hand
  • Expected Today
  • Oil Stock
  • Panjgur Power Station
  • Tank Capacity 3,100,000 Liters
  • Available Stock 1,300,000 Liters
  • In route from Karachi 1,400,000 Liters
  • Pasni Power Station
  • Tank Capacity 550,000 Liters
  • Available Stock 112,440 60,000 Liters
  • Decanting in progress

5
Supply Position _ Sindh
  • Kambar Shahdadkot
  • 10 Villages Restored on 11-08
  • 16 Villages Restored on 12-08
  • 35 Affected villages remaining (Total 161)
  • Dadu
  • Replacement of 220/132 kV, 160 MVA Transformer
  • Damaged since 1415, 02-08 due to fire in the
    grid
  • New Transformer shifted from Lahore
  • Expected September I/III
  • Jamshoro
  • 500 kV NKI Jamshoro line tripped at 2040,
    13-08
  • Tower at Location 111 Collapsed due to Blast

6