OneSAF Integration Overview - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

OneSAF Integration Overview

Description:

... (IG) independent, Master TDB (MTDB) consumable by virtual ... Long Haul Networking. Exercise Management Tools. Master Terrain Database. Visual Models ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 10
Provided by: one8
Category:

less

Transcript and Presenter's Notes

Title: OneSAF Integration Overview


1
Synthetic Environment (SE) Core
OneSAF Integration Overview
Angela Chang SE Core OneSAF Integration
Lead August 2007
2
SE Core Mission
  • Support the Training of our Warfighters by
    providing
  • OneSAF Objective System (OOS) Integration into
    AVCATT and CCTT and the development of virtual
    OOS composition as the standard computer
    generated forces for the virtual domain.
  • Development of a standard Terrain Database (TDB)
    generation process to create a non-proprietary,
    open format, image generator (IG) independent,
    Master TDB (MTDB) consumable by virtual
    simulations, within a total development time of
    96 hours.
  • The development of a Virtual Simulation
    Architecture (VSA) to provide a Common Virtual
    Environment (CVE) that links system and
    non-system simulations into a fully integrated
    and interoperable training capability.
  • Development of Common Virtual Components (CVC)
    that will reduce redundancy, increase realism,
    and facilitate an integrated live, virtual,
    constructive training environment. (LVC TE)

3
SE Core Requirements
KPP 1. OneSAF Integration into CCTT and
AVCATT KPP 2. Standard Terrain Database
Generation Capability KPP 3. Dynamic Terrain KPP
4. Atmospheric Effects KPP 5. Net-Ready KPP 6.
Command, Control, Communications, Computers,
Intelligence, Surveillance, Reconnaissance
(C4ISR) After-Action Review (AAR) Long Haul
Networking Exercise Management Tools Master
Terrain Database Visual Models Urban
Operations Insets Training Support
Package Chemical, Biological, Radiological,
Nuclear and High Explosive Environment (CBRNE)
Common Virtual Components
4
Foundation to Fair Fight
KPP 1. OneSAF Integration into CCTT and AVCATT
(OneSAFs Environmental Runtime Component (ERC)
is the first step.) KPP 2. Standard Terrain
Database Generation Capability (STDGC)
STDGC
OneSAF ERC Integration
Replacement of the legacy terrain formats and
environmental services in CCTT and AVCATT with
OneSAF Environmental Runtime Component
Develop Standard/Rapid Terrain Database
Generation Capability tools and processes that
will create a non-proprietary, open format, image
generator (IG) independent, Synthetic Environment
Master Database (MDB)
OneSAF Environmental Runtime Component
The Terrain Database runs on the ERC to provide
correlation and SAF interoperability.
5
OneSAF Integration
  • OneSAF Integration (OOSI)
  • SE Core integrates OneSAF into AVCATT and CCTT
    through phased development and integration
    activities. Initial capability provides the
    foundation for replacement of legacy SAFs, full
    capability provides a virtual OneSAF baseline.
  • Phase One Integration of Environmental Runtime
    Component (ERC) (completed end of FY07)
  • Phase Two Behaviors and Models (completed end
    of FY08)
  • Phase Three System Functionality (completed end
    of FY09)

FF
6
Phased SAF Replacement
  • Phase One Initial capability (FY07)
  • Integration of OneSAF into the CCTT and AVCATT
    virtual architectures.
  • Extension of CCTT and AVCATT capabilities with
    OneSAF functionality.
  • Replacement of the legacy terrain formats and
    environmental services in CCTT and AVCATT with
    OneSAF ERC.
  • Phase Two Behaviors and Models (FY08)
  • Decomposition of MM to SAF interaction threads
    and implementation of critical models (physical,
    behavioral and environmental).
  • Establish sufficient virtual infrastructure and
    fidelity to minimize or halt CCTT and AVCATT SAF
    development.
  • Phase Three System Functionality (FY09)
  • Addition of ancillary component capabilities,
    including PVD and CCTT modules and models.
  • Phase Four Completed OneSAF Integration (FY10)
  • Scenario generation and conversion of remaining
    models.
  • Point of no return System SAFs are retired.

Legacy SAF development by exception after FY07
7
Phase 1 FY07 Development
  • Integration of OneSAF into the CCTT and AVCATT
    virtual architectures
  • Physical, simulation management, communication
    systems, and network as required by CCTT and
    AVCATT.
  • DIS services/standard enumerations CCTT MCC and
    AVCATT BMC simulation management of OneSAF.
  • Installation of OneSAF onto existing CCTT and
    AVCATT hardware.
  • Voice communications for the CCTT OneSAF
    workstation
  • Extension of AVCATT role player, SAF operator and
    BMC permissions to support use as either OneSAF
    or AVCATT SAF workstation
  • Internal simulation digital communications
  • Alignment of damage modeling between CCTT, AVCATT
    and OneSAF based upon ownship.
  • Infrastructure to support phased OneSAF
    integration

8
Phase 1 FY07 Development
  • Extension of CCTT and AVCATT capabilities with
    OneSAF functionality.
  • OneSAF resides in the CCTT and AVCATT simulation
    systems and provides additional capabilities
    beyond the legacy virtual SAFs, including
  • Support for OneSAF multiple sides/affiliations
  • Addition of OneSAF COE models
  • Replacement of the legacy terrain formats and
    environmental services in CCTT and AVCATT with
    OneSAF ERC.
  • Placing CCTT, AVCATT and OneSAF on the same
    terrain.
  • Addressing technical challenges within ERC/OTF
    critical to virtual domain.

Phase 1 will put CCTT, AVCATT and OneSAF on the
same terrain.
9
OneSAF Integration
  • Date available
  • October 2007 - Interim drop to CCTT and AVCATT
    (Phase I)
  • The software for the FY07 delivery will consist
    of modifications to the AVCATT 7.02 baseline, the
    CCTT 12.0 baseline, and the OneSAF 1.1 baseline
    (includes patches provided before June 1, 2007)
  • March 2008 - CCTT AVCATT field Phase I
  • October 2008 - Phase II verification testing
  • October 2009 - Virtual OneSAF Baseline
  • March 2010 - CCTT AVCATT field Phase III
  • Integration support products
  • Interim drops available as coordinated with PM
    CATT
  • Operator training courseware
  • Installation procedures
  • Client Support and technical repository
    (component test plans/test cases, design notes)
Write a Comment
User Comments (0)
About PowerShow.com