1
Material Requirements Planning
  • Chapter 2

2
MRP in MPC
3
MRP and in MPC
  • An MRP system translates the MPSs into the
    detailed individual steps necessary to accomplish
    those plans. It also provides information to
    develop capacity plans.
  • An MRP II system has a what if capability and
    involves other functions (e.g., sales, finance,
    human resources, accounting, etc.)

4
MRP Record Processing
5
MRP Terms
  • Time bucket period, e.g., 1 week.
  • Planning horizon number of periods.
  • Lead time offset offsets a planned order release
    from a required replenishment.
  • Net requirement difference between the gross
    requirements and the available inventory
    (including scheduled receipts).

6
Gross to Net Explosion and Lead Time Offsetting
  • Explosion process of translating an items
    requirements into component requirements, taking
    existing inventories and scheduled receipts into
    account. Basis for the concept of dependent
    demand.
  • Precedent relationships from the BOM indicate
    the order in which assembly must be done.
  • MRP achieves the benefits of the backward
    scheduling and performs the gross to net explosion

7
Technical Issues
  • Processing frequency cost versus timeliness and
    accuracy
  • Regeneration
  • Net change
  • Bucketless systems
  • Lot sizing setup cost versus carrying cost,
    cascading effect
  • Safety stock, safety lead time
  • Low-level coding

8
Technical Issues
  • Pegging
  • Firm planned orders
  • Service parts
  • Planning horizon
  • Cumulative lead time
  • Scheduled receipts vs. planned order releases

9
Using the MRP System
  • MRP Planner- Primary actions see list, p. 36
  • Order launching - process of releasing orders to
    the shop or to vendors done when planned order
    release is in the action bucket.
  • Allocation and availability checking - step prior
    to order launching that involves an availability
    check for the necessary component(s).
  • Exception codes
  • Bottom-up replanning - using pegging data to
    solve material shortage problems.

10
System Dynamics
  • Transactions during a period.
  • Rescheduling.
  • Complex transaction processing.
  • Procedural inadequacies data auditing and
    reconciliation.

11
MRP Data Base
  • Item master file - individual part data that is
    static.
  • Subordinate item master file - information on
    part status.
  • Bill of materials file - usually set up on a
    single-level basis i.e., part number is linked
    only to part numbers of immediate components
    required to produce it.

12
MRP Data Base
  • Location file - physical storage locations.
  • Calendar file.
  • Open order file - files of scheduled receipts
    (purchase orders and shop orders).
  • Other file linkages forecasting, capacity
    planning, production scheduling, cost accounting,
    budgeting, order entry, shop-floor control,
    distribution, invoicing, payroll, job standards,
    and engineering.

13
Concluding Principles
  • Effective use of an MRP system allows development
    of a forward-looking (planning) approach to
    managing material flows.
  • The MRP system permits decentralized decision
    making on individual part numbers.
  • All decisions made to solve problems must be done
    within the system, and transactions must be
    processed to reflect the changes.

14
Concluding Principles
  • Effective use of exception messages allows
    focusing attention on the vital few, not the
    trivial many.
  • System records must be accurate and reflect the
    factorys physical reality.
  • Procedural inaccuracies in processing MRP
    transactions must be identified and corrected to
    ensure that material plans are accurate.

15
Homework Assignments
  • Problems 2.6 and 2.14
  • Due Thursday, October 3
  • Use spreadsheets for the assignments
Write a Comment