perfSONAR and Wavelengths Monitoring - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

perfSONAR and Wavelengths Monitoring

Description:

Nicolas Simar - DANTE. Connect. Communicate. Collaborate ... Reference implementation of a MA service ready (DANTE). Historical status information provided. ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 17
Provided by: jpa111
Category:

less

Transcript and Presenter's Notes

Title: perfSONAR and Wavelengths Monitoring


1
perfSONAR and Wavelengths Monitoring
  • DICE Meeting Ottawa 12th of July 2006
  • Matthias Hamm - DFN
  • Nicolas Simar - DANTE

2
Agenda
  • Use case
  • Providing the data
  • Visualisation
  • Achievements
  • Next Step

3
Model for E2E Links
  • E2E Links are dedicated optical multi-gigabit
    connections
  • Essentially P2P links (circuits) framed as
    SDH/SONET or Ethernet
  • Cooperation of several NRENs needed to operate
    E2E Links
  • Users need Single Point of Contact (SPOC)
  • E2E Link Coordination Unit (E2ECU) brings
    together Users and NRENs

GEANT2
E2E Link 1
NREN1
NREN2
NREN3
E1
E3
E2E Link 2
E2E Link 3
E2
4
Basic Characteristics of E2E Link Monitoring
  • Status information corresponds to network layer 1
    and 2
  • Status information is logical abstraction
  • Multiple technologies and vendors used to provide
    a e2e service.
  • No information about physical devices necessary
  • Domain and Interdomain (ID) link status provided
    by NRENs
  • E2E link status aggregation of NREN and ID links

5
Technical Building Blocks for E2E operations
  • E2ECU as Single Point of Contact (SPOC)
  • 30 NRENs participating
  • Several hundreds of E2E links expected
  • Common Tools
  • E2E Monitoring System
  • CMDB
  • perfSONAR compliant monitoring data exchange
  • XML registry file schema integrated within the
    NMWG XML schema

6
Status Information for E2E Monitoring System
  • Operational States
  • Up link is available
  • Degraded link is up, but has reduced
    performance
  • Down unavailable
  • Unknown state is unknown
  • Administrative States
  • NormalOperational
  • Maintenance
  • TroubleShooting
  • UnderRepair
  • Unknown

7
Agenda
  • Use case
  • Providing the data
  • Visualisation
  • Achievements
  • Next Step

8
Data Exchange for E2E Monitoring Archive
scenario
Connect. Communicate. Collaborate
  • NREN in charge of retrieving the data from the
    NMS/DB to analyse them and pass the information
    to a java class.
  • About 700-1000 lines of code for GÉANT 15 days.
  • JRA1
  • Provides the mySQL MA service code
  • maintains it.
  • Provides the script to write into the DB
  • JRA4 in charge of the E2E NOC visualisation.

9
Other Data Exchange (for information)
  • Measurement Point Service for Alcatel NMS
  • Can currently retrieve SES, UAS, ES, BBE from
    Alcatel NMS via IOO module
  • On demand
  • Reference implementation
  • Beta version of software available for download
  • Measurement Point Service for SNMP
  • SNMP.get
  • On demand
  • Beta version of software available for download

10
Data Exchange for E2E Monitoring proxy Scenario
  • JRA4-WI3 part
  • Retrieve data from NRENs
  • Aggregate states for E2E links
  • E2E link status visualisation (and other) tools
  • NREN part
  • Retrieve data from NMS/DB
  • Calculate states for links
  • Write data into XML registry file
  • Done in real-time

11
Agenda
  • Use case
  • Providing the data
  • Visualisation
  • Achievements
  • Next Step

12
Scenario
E2E Link for DEISA
SURFnet
DFN
SURFnet-MUE
SURFnet-SARA
DFN-LRZ
DFN-MUE
E2E Link for LHC
DANTE-AMS
DANTE-GEN
SWITCH
DANTE
SWITCH-GEN
End Point
Demarc. Point
Domain Link
ID Link
ID-Link Partial Info (shared mon.)
13
Agenda
  • Use case
  • Providing the data
  • Visualisation
  • Achievements
  • Next Step

14
Achievements
  • perfSONAR XML format fixed (GGF NMWG compliant).
  • Exchange procedure specified
  • Reference implementation of a MP service ready
    (DFN LZR).
  • Status information provided every 5 min.
  • Pull interface.
  • Reference implementation of a MA service ready
    (DANTE).
  • Historical status information provided.
  • Pull interface.
  • Visualisation prototype implemented.

15
Agenda
  • Use case
  • Providing the data
  • Visualisation
  • Achievements
  • Next Step

16
Next Steps
  • Implementation of a graphical Weathermap.
  • Support NREN in data provisioning (two deployable
    tools scenarios)
  • Push interface (end October).
  • Scheduler (end October).
  • Historical information.
  • Authentication/Authorisation (GN2JRA5)
Write a Comment
User Comments (0)
About PowerShow.com