BDS Status, VLCW06 - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

BDS Status, VLCW06

Description:

Detector R&D Reviews attached to each. Beijing (ACFA), 2/07 : Tracking ... http://www.linearcollider.org/wiki/doku.php. Please read and make comments ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 9
Provided by: andrei49
Category:
Tags: bds | php | reviews | status | vlcw06

less

Transcript and Presenter's Notes

Title: BDS Status, VLCW06


1
????
???????? 4? 3?, 2007
?? ?
2
????????
  • ?1?
  • ??
  • Introductions/discussion
  • ?????????
  • VTX, TRK/TPC, CAL, OPT, GRID/SOFT
  • ??????
  • ??
  • Discussion Roadmap
  • ???CAL
  • ??
  • 5?8?(?)
  • ???PFA/Simulation (OPT)

3
ILC Workshops/Meetings
  • ILC Phys/Det GDE
  • 3 per year
  • Spring Asia (ACFA)
  • Summer Europe (ECFA)
  • Fall North America (ALCPG)
  • Every 4th is International (LCWS,WWS)
  • Detector RD Reviews attached to each
  • Beijing (ACFA), 2/07 Tracking
  • DESY (LCWS), 5/306/3/07 Calorimeter
  • Fermilab (ALCPG), 10/07 Vertexing
  • Sendai (ACFA), 2/08 All others (?)

4
Other ILC Meetings before DESY
  • LHC/ILC workshop, Fermilab 4/12-14/07
  • SiD Workshop, Fermilab 4/9-11/07
  • MAC Meeting, Fermilab 4/26-27/07
  • Tesla Technology Collaboration Meeting, Fermilab,
    4/23-25/07
  • PFA Meeting, Paris, 5/2-4/07
  • CALICE Meeting, Kobe, 5/10-12/07

5
DCR (Detector Concept Report)
  • Released at Beijing 2/07
  • http//www.linearcollider.org/wiki/doku.php
  • Please read and make comments
  • To the chief editor Ties Behnke
    ties.behnke_at_desy.de
  • To be finalized/polished toward DESY 5/30/07
  • Review process starting now
  • Phys/Det part
  • 1 theorist, 1 ILC and 1 non-ILC experimentalist
    per region
  • Cost part
  • 1 per region (J.E. Augustin, P. Garbincious, S.
    Yamada)

6
Detector Roadmap
  • ????
  • Accelerator EDR (Engineering Design Report)
  • Planned for 2010
  • 30 figures for cost
  • Possibly multiple sites
  • 2012 Completion of EDR
  • 2019 Start taking data
  • ????????????????
  • ILCSC??WWS????

7
  • To Co-Chairs of the WWS International Organizing
    Committee
  • From ILCSC
  • The realization of the International Linear
    Collider has taken major steps forward in recent
    years. This could not have happened without the
    leadership taken coherently by the particle
    physics community, within the framework of ICFA.
    Unprecedented collaborative steps have been
    necessary, and the community has adapted
    successfully to what, in some regions, required
    major redirections of traditional accelerator RD
    effort.
  • Two major milestones, the selection of the
    main-linac RF technology and the GDEs
    announcement of the RDR budget and associated
    design choices, keep the GDE on pace to complete
    a construction-ready engineering design for the
    ILC accelerator-complex by 2010.
  • Maintaining this momentum requires also that the
    equivalent strategic decisions and the level of
    technical maturity for the two ILC detector
    proposals keep pace with the accelerator
    schedule. Major progress in this regard is
    ongoing under the auspices of WWS. In addition, a
    definite plan together with milestones is needed
    to have detector designs of a maturity similar to
    that of the accelerator by 2010. This needs an
    enhanced effort by the community. ILCSC will
    support the formation of an International
    Detector Advisory Group to assist this effort.
    ICFA looks forward to receiving such a plan from
    WWS at the June 1, 2007 ILCSC meeting at DESY.

colors added
8
IDAG ??? (WWS?)
  • Reports to ILCSC
  • Assesses detector progress toward Detector
  • Engineering Design
  • Physics goals, RD programs, Resources,
    Schedules, Costs
  • Guide toward two EDRs/collaborations
  • WWS-GDE relations
Write a Comment
User Comments (0)
About PowerShow.com