1
Corrib Natural Gas Project
  • Permits and Consents
  • Compliance

2
Permits and Consents Compliance
  • Environmental Aspect
  • Design
  • Construction and
  • Operation
  • Safety Aspects
  • Design
  • Construction and
  • Operation.

2
3
Key Consents
  • Petroleum Lease - Entire development - Awarded
    November 2001.
  • Plan of Development Entire development -
    Approved with conditions Apr-02.
  • Pipeline Consent (Section 40) Offshore and
    onshore pipeline - Granted with conditions
    Apr-02.
  • Foreshore Licence - Pipeline element below HWM
    and within Irish territorial (12 m) limit -
    Granted with conditions May-02.
  • Planning Permission Bellanaboy Bridge terminal
    granted with conditions Oct-04.
  • Integrated Pollution and Prevention Control
    Licence Emissions arising from terminal -
    Granted with conditions Nov-07.
  • Strategic Infrastructure Development Application
    Onshore pipeline (above HWM) submit Feb-09.
  • New Pipeline Application (Section 40) Offshore
    and Onshore Pipeline Submit Feb-09.
  • New Foreshore Licence Application Submit
    Feb-09.

3
4
Managing Environmental Compliance
  • Making sure our activities (including design,
    construction and operations) are carried out in
    compliance with the law and with all the
    conditions set out in our licences and consents,
    and
  • Making sure we do what we say we do.

4
5
Principles and methods
  • Prior assessment of environmental impact
  • Environmental Impact Statement.
  • Minimisation of potential impact through design
    and other mitigation controls
  • Environmental Management Plan and Conditions.
  • Monitoring the effectiveness of controls set
  • Programme of monitoring and reporting.
  • Auditing of performance
  • Continuous improvement.

5
6
System of managing compliance
  • Prepare Environmental Management Plan (EMP) on
    the basis of
  • Mitigation measures set out in EIS
  • Conditions
  • Requirements arising from consultation
  • Legal requirements and
  • Standards (e.g. ISO 14,001).

6
7
Typical EMP contents
  • Organisation
  • Spill Contingency
  • Dust Management
  • Consultation
  • Noise Management
  • Reinstatement Management/Monitoring
  • Waste Management
  • Traffic Management
  • Surface Water Management
  • Hazardous substance management
  • Monitoring and reporting

7
8
Applying the EMP
  • Procedures and guidance for site workers.
  • Supported by full time environmental officers.
  • Regular reporting of activities and monitoring
    results to relevant authority e.g. Mayo County
    Council fortnightly reports.
  • Reporting to PMC/EMG.
  • Internal reviews and inspections.
  • External inspections and monitoring e.g. Mayo Co
    Co/DCENR/NPWS.

8
9
Managing Safety Compliance
  • Requirements set through Acts, Statutory
    Instruments, Codes of Practice, Standards.
  • Additional requirements set out in Plan of
    Development and Gas Act approvals.
  • TAG recommendations.
  • Planning conditions.

9
10
Safety
  • Safety integrated in project activities through
    all phases from design through to operations.
  • Assessed by regulatory bodies as part of
    applications processes.
  • Independent 3rd party verification (by
    independent body e.g. DNV, BV or Lloyds) and
    DCENR Letter of Acceptance.
  • Competent operators (extensive and intensive
    training of all operations staff).
  • Implementation of safety case legislation through
    life of field.