CIVA Status
2nd Post-Launch Science Workshop
  • Helsinki 4-6 September 2006

2
Unit Status (1)
  • PC2 / PC3 results analysis
  • Short summary and lessons learnt - PC2 (IAS
    CIVA Checkout 2 Report dated 10 March 2006)
    nominal functioning but very limited test
    (CIVA/ROLIS IME plus CIVA-P simulated images
    only no verification of the CIVA-P, CIVA-M/V
    CIVA-M/I instruments) and still some abnormal TM
    packets (zeros) all temperatures in the 100C
    range
  • - PC3 nominal functioning, no abnormal TM
    packets, all temperatures in the 90/-100C
    range, slightly increased wrt PC2 ones, IAS CIVA
    Checkout 3 Report to be edited
  • Actual unit resources- Energy power ongoing
    update (TBC) of the current MOST figures based on
    the real in-flight (commissioning) resources-
    Data volume unchanged
  • - Data transfer limited to 9 kbps by CDMS

3
Unit Status (2)
  • CIVA S/W
  • A new CIVA S/W version (7.7 with improved
    algorithm automatic exposure time and improved
    robustness of the camera/CDPU links) has been
    finalized and positively tested on both the GRM
    (Cologne) and FSM (Orsay)
  • PC4 operations
  • CIVA/ROLIS operations have been defined for PC4
    as follows
  • D1 - Extended AFT CIVA LFT with 7 CIVA-P
    pictures
  • - CIVA S/W upload
  • - CIVA LFT with 7 CIVA-P pictures
  • - ROLIS S/W upload Special LFT
  • D3 - ROLIS S/W final burn ROLIS LFT
  • - CIVA-P Exposure Test (CIVA-ROLIS_LIOR_023
    8_02, first part of the CIVA active check-out
    including the EEPROM check)
  • D8 - CIVA-M/SD2 Combined Operations
    (CIVA-ROLIS_LIOR_0254_01, second part of
    the CIVA active check-out)
  • The corresponding sequences have been positively
    tested on both the GRM (Cologne, May August
    2006) and the CIVA FSM (Orsay, April-May 2006
    with previous ROLIS S/W August 2006 with new
    ROLIS S/W)

4
Unit Status (3)
  • Mars Swing-by Operations
  • CIVA-P Mars imaging is proposed to be done in the
    following conditions (refer to CIVA-ROLIS_LIOR_026
    0_01)
  • - CIVA-P Heaters switching on 7 hours before t0
    (015449, Closest distance to Mars)
  • - CIVA-P Heaters switching off 3 hours before t0
  • - Back CIVA-P Heaters switching on 1 hour before
    t0
  • - 6 Mars (plus one solar panel) pictures taken
    with CIVA-P1 (fix exposure time), one every 80
    s, 4 pictures before t0, one at t0 and one after
    on the basis of the CNES simulations (see Regis
    presentation)
  • - 1 Phobos picture taken with CIVA-P2 at t010
    mn (fix exposure time)
  • The number of possible images is limited by the
    memory size allocated to CIVA in the 16MB IME
    mass memory (1MB Civa data or 4096 data packets)
    since the CIVA data needs to be stored in the
    ROLIS MEM when the Lander is not connected to the
    Orbiter
  • The corresponding sequences have been positively
    tested on the CIVA FSM (Orsay, June 2006)
  • The CIVA-ROLIS_LIOR_0260_01 (nominal) and
    CIVA-ROLIS_LIOR_0261_01 (optional) LIORs have
    been included in the SONC/MOST made resources
    analysis

5
Unit Status (4)
  • Open Work
  • Miscellaneous questions- status of the NCR
    RO-LAN-NC-30361 no reception of the CIVA-M/V
    heating command during Commissioning (Block 2,
    Pass 6)
  • - Civa/Rolis MEM allocation sharing issue
    on-board additional option to be discussed,
    implemented and tested before On-Comet phase
  • - post Mars Swing-by Cruise operations to be
    discussed- on-comet SDL sequence to be refined
    (30mn transfer time required to transfer the
    Civa-P and RolisD images to CDMS at 9 kbps)
  • CNES/SONC - new breakdown to be done around the
    SONC tools (images correction calibration, HK
    transfer functions )
  • - follow-on of the archiving preparation
    activities EAICD (Experiment Archive Interface
    Control Document) to be updated
  • CIVA documentation - Technical data base
    including ADPs updates, Calibration data, FUM
    almost completed, to be stored at IAS and
    transferred to COROLLES by IAS
  • FSM tests at Orsay - complementary calibration
    tests on CIVA-M