Design - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

Design

Description:

Contract File Documentation (Tabs 1- 17 ) Proposal Evaluation Summary (Tab 26) ... www.safaq.hq.af.mil/mil/organizations_mil/afpeocm_mil/documents/regs_docs/I DIQ ... – PowerPoint PPT presentation

Number of Views:39
Avg rating:3.0/5.0
Slides: 29
Provided by: Sami164
Category:
Tags: design | mil

less

Transcript and Presenter's Notes

Title: Design


1
Design Engineering Support Program II(DESP II)
  • Authorized Ordering Agency (AOA)
  • Buyer Training
  • May 2007

2

Overview
  • DESP II Contracting Process Flow
  • PR Package
  • Contract File Documentation (Tabs 1- 17 )
  • Proposal Evaluation Summary (Tab 26)
  • Proposal Evaluation Process
  • Contract File Documentation (Tabs 48- 70 )
  • Task Order Award Document
  • Task Order Closeout
  • Conclusion

3
DESP II Process FlowContracting
JCN Job Control Number SS Sole Source

Contracting
gt1M ?
gt1M ?
N
N
Receive Proposals
Receive Complete PR Package
Y
Y
Legal Review
Legal Review
Proposal Evaluation
Review PR Package for Completion
Clearance IAW Local Policy ?
Competitive ?
N
N
Assign a JCN/ Request a JCN
Y
Y
Clearance
RFP lt500K SB Set-Aside gt500K IAW Form 2579
RFP To SS Contractor
Create Letter RFP
Award
4

PR Package
  • A DESP II Complete PR Package consists of
  • Required for All DESP II Task Orders
  • PR Supplement Sheets
  • Business Case Analysis or Acquisition Plan
  • Contractual Engineering Task (CET)
  • Contract Data Requirements Lists (CDRLs - DD Form
    1423s)
  • Performance Plan
  • QA Nomination Letter with QA Training I
    Certificate
  • Small Business Form 2579
  • Contractor Support Approval Authority
  • As applicable to the requirement
  • Exception to Fair Opportunity Document
  • Non-Disclosure Agreement
  • AAS Document
  • DD Form 254
  • Modified Delphi Criterion Worksheet
  • Award Fee Plan

5

Contract File Documentation
  • Follow the AFMC System Logistics Contract File
    Content Index Nov 2005 (Handout 1)
  • TAB 1
  • PR Supplement Sheets (signed)
  • ALL Job Control Numbers (JCNs) must be obtained
    from the DESP II Home Office at Ogden ALC
  • JCN Authorization Letter
  • A new JCN is required for all task orders and
    task order modifications that result in funding
    obligations (this includes deobligation
    modifications)
  • Contractual Engineering Task (CET)
  • CET Attachment 1 Task Order CDRLS
  • CET Attachment 2 - Option Tasks
  • Non-Disclosure Agreement
  • Modified Delphi Criterion
  • Award Fee Plan

6

Contract File Documentation (Cont.)
  • TAB 2
  • Business Case Analysis
  • Required for all DESP II orders less than 100
    Million
  • DESP II document used to accomplish acquisition
    planning documentation required in FAR 7.1.
  • Supplemental Acquisition Plan
  • Required for all DESP II orders greater than
    100M
  • Follow AFPEO procedures found at
  • https//www.safaq.hq.af.mil/mil/organizations_mil
    /afpeocm_mil/documents/regs_docs/IDIQ20Clarificat
    ion20Memo.pdf
  • Task Order Performance Plan
  • TAB 6
  • Exception to Fair Opportunity
  • Required for Sole Source task orders
  • Will only be used in rare cases under DESP II
  • Contractor has proprietary data
  • Logical Follow-on (can only be a follow-on to an
    order previously competed within DESP II)

7

Contract File Documentation (Cont.)
  • TAB 8
  • DF for TM contracts
  • An individual DF is required when the TM
    pricing arrangement is used for a task order
  • Options Quantity (Handout 2)
  • Options Exercise as per FAR 17.201 (Handout 3)
  • Required when an option is exercised on an
    individual task order
  • AAS Certification Document (Handout 4)
  • Required for AAS efforts as defined by FAR 2.101
  • Use AAS Purchase Request Supplemental
    Information Document (PRSID) (AFMC AAS Policy, 1
    Aug 06)
  • Other Determinations/Approvals
  • Blanket DF Memo (Handout 5)
  • Required for all DESP II task orders

8

Contract File Documentation (Cont.)
  • TAB 12
  • Letter RFP
  • Checklist (Handout 6)
  • Sample Letter RFP (SS - Handout 7, Comp Handout
    8)
  • TAB 14
  • Abstract of Proposals
  • Required for all competitive task orders
  • TAB 16
  • Unsuccessful Proposals and All Correspondence
    with Each Unsuccessful Offeror (Competitive
    orders only)
  • TAB 17
  • Successful Proposal and All Correspondence with
    Successful Offeror Prior to Execution of
    Contractual Document
  • TAB 26
  • Technical Evaluation of Proposals (Next seven
    slides)

9
Proposal Evaluation Summary
Competitive Proposal ?

Y
N
TOI Performs a Technical Evaluation (to include
proposed hours and skill Mix)
TOI Performs a Technical Evaluation IAW Modified
Delphi Process (to include proposed hours and
skill Mix)
Buyer Verifies Rates are proposed IAW Basic
Contract
TOI Task Order Initiator
Highest Modified Delphi Score (Preferred) (Buyer
and Technical Team)
Award Prep
Award
10
Proposal Evaluation Process(Sole Source)
  • Technical Evaluation Request (Produced by Buyer)
  • Request includes the offerors proposal
  • Request an evaluation of
  • Labor Hours Labor Mix (Prime and Subcontractor)
  • Material Costs
  • Travel Costs
  • Other Direct Costs (ODCs)
  • All Other Terms/Assumptions.
  • Buyer Evaluation
  • Evaluation of Correct Labor Rates, Burden
    Factors, and Profit/Fee (IAW Basic DESP II
    Contract).
  • Labor Rates, Burdens, and Profit Factors are
    found on the DESP II CoP (Community of Practice)
  • https//afkm.wpafb.af.mil/ASPs/Users/Login.asp?NoS
    essionTrueinpDestinationPage2FASPs2FCoP2FClo
    sedCoP2Easp3FFilter3DOO2DPK2DOO2D03FilterO
    O-PK-OO-03LoginAcctFalse

11
Proposal Evaluation Process(Competitive)
  • Modified Delphi Method is Used
  • What Is It?
  • A Technique for Quantifying Subjective or
    Qualitative Data, for Analysis Purposes, for
    Assigning a Criterion Ranking
  • How Does It Work?
  • TOI Develops Evaluation Criterion, Tailored to
    the Requirement
  • Must Include Small Business Participation
  • Assign an Evaluation Class (EC) to each Criterion
  • NC Non-Critical
  • C Critical
  • Assign a System Weight Factor (SWF)
  • SWF of 1 5 for NC Criterion
  • SWF of 6 10 for C Criterion

12
Proposal Evaluation Process (Competitive)
  • Evaluation Steps
  • List Contractors Across the Top of the Form, and
    List the Criteria/Requirements Down the Left Side
    of the Form
  • Rank Each Contractors proposed Capabilities with
    Respect to Each Criterion - Range is 1 To 5 (Low
    to High)
  • Determine Each Contractors Effective Value By
    Multiplying the Assigned Ranking and the SWF
  • Calculate the Total Effective Value/Score for
    Each Proposal
  • Award is Made in One of Three Ways
  • Combine Technical, Past Performance, and Total
    Evaluated Price (TEP) Award to Highest Modified
    Delphi Score (Preferred Method)
  • Combine Technical and Past Performance. Evaluate
    Cost separatly (Best Value Determination
    Decision)
  • Evaluate Technical, Past Performance, and Cost
    Separatly (Best Value Determination Decision)

13
Proposal Evaluation Process (Competitive)
  • Send a Copy of the Modified Delphi Sheet with the
    Letter RFP
  • Buyer Requests Technical Evaluation from TOI
    (include all proposals)
  • Provide TOI (preferably team) Individual Analysis
    worksheets and a Roll-Up worksheet (Handout s 9
    10)
  • Ensure the Modified Delphi Worksheet is filled
    out correctly
  • Ensure analysis is detailed and well documented
    on the Worksheets
  • Request an evaluation of the winning contractors
  • Labor Hours Labor Mix (Prime and Subcontractor)
  • Material Costs
  • Travel Costs
  • Other Direct Costs (ODCs)
  • All Other Terms/Assumptions.

14
Proposal Evaluation Process (Competitive)
Sample Modified Delphi Form (Handout 11)
15
Proposal Evaluation Process (Competitive)
  • Sample Total Evaluated Price (Handout 12)

16
Contract File Documentation (Cont.)
  • TAB 48
  • Required for negotiated orders greater than
    650,000.00
  • Contractor is certifying to everything but labor
    rates
  • Labor hours
  • Material costs
  • Other Direct costs
  • TAB 50
  • Price Competition Memorandum (PCM)
  • Required for all competitive task orders
  • Price Negotiation Memorandum (PNM)
  • Required for all sole source task orders
  • Preferred when only one response is received in a
    competitive environment
  • Eliminates requirements of FAR Part
    15.403-1(c)(1)(ii)
  • TAB 53
  • DD 254 (Security Requirement)

17
Contract File Documentation (Cont.)
  • TAB 54
  • If funds are not committed on PR, committed funds
    document is filed here
  • TAB 56
  • Legal Review
  • Required for all contracting documents greater
    than 1M
  • AFFARS 5301.602-2, effective 1 May 06
  • TAB 57
  • ACPs Summary Sheet
  • TAB 58
  • Correspondence Regarding Execution of Contractual
    Document (for modifications)
  • TAB 59
  • Clearance Review Approval Documentation (AFFARS
    5301.90)
  • TAB 60
  • Notice to Unsuccessful Offerors (Handout 13)

18
Contract File Documentation (Cont.)
  • TAB 61
  • Quality Assurance
  • Nomination Letter (Sample Letter Handout 14)
  • Training Certificate Phase I
  • Phase I certification can be obtained by taking
    the DAU Performance Based Services Acquisition
    course IAW local procedures
  • Training Certificate Phase II (Handout 15)
  • Provided by the task order Contracting Officer
  • To be completed before award
  • MOASP Memo(Handout 16)
  • QAP Letter (Handout 17)

19
Contract File Documentation (Cont.)
  • TAB 68
  • Post Award Debriefing of Offerors (IAW FAR
    15.505)
  • The Governments evaluation of the significant
    weaknesses or deficiencies in the offerors
    proposal
  • The overall evaluated cost or price (including
    unit prices), and technical rating of the
    successful offeror and the debriefed offeror, and
    past performance information on the debriefed
    offeror, if applicable
  • The overall ranking of all offerors, when any
    ranking was developed by the agency
  • A summary of the rationale for award and
  • Reasonable responses to relevant questions about
    whether procedures contained in the solicitation,
    applicable regulations, and other applicable
    authorities were followed.
  • Do not provide a point-by-point comparison of
    Proposals

20
Contract File Documentation (Cont.)
  • Sample of Debrief to Offeror (Handout 18)

21
Contract File Documentation (Cont.)
  • TAB 70
  • Copy of Award Fee Plan

22
Task Order Closeout
  • DESP II Survey Copy of Survey sent to the TOI
    upon completion of task order performance period
  • Copy of Survey is located on DESP II Website
    (Handout 19)
  • One copy of completed survey must be sent to the
    Ogden Technical Lead
  • 801-777-9972
  • One copy is to be filed in the Official File
    Folder

23
Task Order Award Document
  • Created in ACPs
  • Must have the DESP II Parameter

A Job Control Number is required on all DESP II
funding obligations (includes deobligation mods)
DESP II Parameter
List of Contractors
24
Task Order Award Document
  • Contact OO-ALC Contracting Lab at 801-777-5978
    for a shell ACPs contract

25
DESP II CLIN Structure
  • Task Orders must conform to the basic contract

    CLIN structure
  • CLIN structure is as follows

0001 FFP Prime Engineering Labor 0002
FFP Subcontracting Engineering Labor 0003
CPFF Prime Engineering Labor 0004
CPFF Subcontracting Engineering Labor 0005
TM Prime Engineering Labor 0006
TM Subcontracting Engineering Labor 0007
CPAF Prime Engineering Labor 0008 CPAF Prime
Award Fee 0009 CPAF Subcontracting Engineering
Labor 0010 CPAF Subcontracting Award Fee 0011
FPIF Prime Engineering Labor 0012
FPIF Subcontracting Engineering Labor
0013 CPIF Prime Engineering Labor 0014 -
CPIF Subcontracting Engineering Labor 0015
CRNF Other Direct Costs (ODCs) 0016
CRNF Material 0017 CRNF Travel 0018
NSP Contract Data Requirements 0019
TBD Technical Data Package 0020 TBD Technical
Manuals 0021 TBD Logistic Support Data 0022
TBD Limited Production
26
DESP II Task Order Clauses
  • Clauses
  • The only Clauses cited in a DESP II task order
    are those clauses that require a fill-in. All
    other task order Ts and Cs are IAW the basic
    contract
  • A list of Task order clauses are found at the
    mid-assembly point in ACPS

This button is found at mid-assembly
This button will take you to the DESP II clauses
27
Conclusion
  • Forms and Sample Documents can be obtained via
    the DESP II Home Office or your local DESP
    II Program Representative
  • POCs
  • DESP II Technical Lead
  • 801-777-9972
  • DESP II Contracting Officer
  • 801-777-7168
  • DESP II Contract Negotiator
  • 801-586-7933
  • DESP II Contract Negotiator
  • 801-777-4754
  • DESP II Contract Negotiator
  • 777-5395
  • Visit the DESP II Web Site at
  • http//contracting.hill.af.mil/AirCraft/DESPII/des
    pII.asp

28
Conclusion
  • Questions???????
Write a Comment
User Comments (0)
About PowerShow.com