Title: Scotlands Housing Expo
1- Scotlands Housing Expo
- Highland Housing Fair
Scotlands Housing Expo Highland Housing Fair
2Highland Housing Fair
Finnish Model
Master Planning, Show Homes,
Trade Show
3Heinola Fair
4Oulu Housing Fair
5- Expo Components
- Development of Master Plan
- including Design Codes
- RIAS Competition for Plots
- Plots Bought and Houses Built
- by Competition Winners
- Fair Event of 1 Month in 2010
- Architect Designed Homes
- Sold or Rented by Developers
- Post Event
6Catalyst for Change Create Exemplar Community Set
the Standards for Future Developments
7Promote Sustainable Design Infrastructure,
Eco-criteria for Plots, Create Sustainable
Community
8Raise Public Expectations Expected Attendance of
30,000 people
9 Inverness
Expo Site Master Planned by Cadell2 Balvonie
Milton of Leys, Inverness Phase 1 Housing
Expo, 55 Houses Phase 2 Remaining Houses
Drumossie Hotel
A9
Community Space
Perth
Phase 2
SITE
SITE
Area Under Development
Castleton Village
10Master PlanShared SurfacesPriority to
PedestriansNarrow StreetsCommunity
SpacesRemote Parking40 Affordable Zones
Woodfuel Solar Carbon Neutral Recycling
and AdaptabilitySustainable MaterialsHome
Work Units
11Architecture
Architecture Cutting Edge Design Re-interpretati
on of Traditional Forms Use of Innovative
Construction
- Use of Timber
- More Urban in Character at south
- Timber clad buildings towards north
12The Stone House NORD Architecture
13Outside Inside
- Innovative Construction
- Hollow Clay Block plus
- Massive Timber
- Sustainable Systems
- Carbon Neutral
- Ground Source Heat Pump
- Evacuated Solar
- Tubes, PV
14 High Tech
High Tech. Approach HLM Arch. Massive
Timber Preheated air from underground
labyrinth Solar thermal collectors
15 Light on the Ground, Walter Segal Low Tech.
Approach .
- Light on the Ground, Walter Segal Low Tech.
ApproachLayout Maximises solar gain,
Pre-fabricated pre-wired pre-plumbed service
pods, min. founds, greywater storage in solum
void, use of standard components to avoid waste.
No systems.Materials locally sourced timber
frame and wood cladding, prefab highly insulated
timber framed breathing wall.
David Blaikie Arch.
16Passivhaus Concept Features Solar air
collectors and heat exchangers 15 kWh/m2
compared to norm 57 kWh/m2 space heating 13
kgCO2/m2 compared with 22.4 kgCO2/m2
17Scotlands Housing Expo Highland Housing Fair