Agenda
- Welcome David Hammerle
-
- Safety Amanda Estes
- Prospects/Feeds Ed Gore
-
- Projects Barry Peterson/PPMs
- Supplier Quality Daniel Nanneti
- Update on Supplier Portal Beverly Tinn
-
- QA
4Vendor Shop Safety
Safety
5Bechtels Zero Accident Philosophy
- Bechtel is dedicated to the concept that all
accidents are preventable. - Therefore the company is committed to achieving
and sustaining Zero Accident Performance
through continuous improvement practices.
6 Demonstrating Safety at Vendor Shops
- Follow Supplier and Bechtel Safety Procedures
- Do Not Operate Any Hand or Power Tools
- Stay Outside of Barricaded Areas
- Stay Within Shop Designated Walkways
- Report Unsafe Conditions to Shop Management
- Wear all Needed Personal Protective Equipment
7Personal Protective Equipment
- Wear required PPE
- compatible with vendor shop
- Hard Hat
- Safety Glasses
- Ear Plugs
- Sturdy Leather Shoes
- Safety Vests
8Prospects/Feeds
- Houston Based
- Angola LNG - EPC
- Egypt LNG 3 - Feed/EPC
- Yamal LNG - Feed/Other LNG Studies
- Detroit/Other Marathon Cokers
- Keystone Pipeline
- Mackenzie Gas Project
- IGCC, EG2 LNG Plant, Chevron Pascagoula
Refinery Expansion - London Based
- Yanbu Export Refinery (Coker Feed)
- Manifa Producing Facilities Program - (PM
Feed)
9Projects
- Houston Based
- AGDII
- Athabasca Oil Sands Downstream
- Brass LNG
- Motiva Crude Expansion
- Petrotrin Gas Optimization Program
- Sabine Pass LNG Terminal Phase 2 Expansion
- Reliance KGD6 Field Development
- London Based
- Reliance Jamnagar Export Refinery Project
- Khursaniyah Gas Plant Project
- OGD III Project
- PIC Aromatics Offplots
- Thailand Based
- TPX Revamp Project
10Supplier Quality Surveillance
- Objective
- Highlight key supplier quality issues
- Give a birds eye view of the material received
at job site with issues - How you can help
11Key SQ Surveillance Issues
- Quality schedule of vendor documents
- Excessive Bechtel SQR time in suppliers
facilities - Inadequate management control of sub-suppliers
- Limited inspection resources on the shop floor
- Lack of notifications of witness hold points
- Increase in quality issues on shop floor
12SQ Surveillance Quality Trends
Supplier Performance Data shows that shop quality
issues are trending up
13SQ Surveillance Issues
Wide root gap in a shell long seam fit-up
14SQ Surveillance Issues
Burnt paint on exhaust system of a diesel
generator set
15SQ Surveillance Issues
Full thickness mis-aligned shell circular seam
fit-up
16SQ Surveillance Issues
Damaged cable tray due to poor shipment packing
17SQ Surveillance Issues
Structural Steel cracks Poor inspection
18SQ Surveillance Issues
Fire hydrant piping
19SQ Surveillance Issues
Poor welding spatter
20SQ Surveillance Issues
Welds with poor penetration
21SQ Surveillance Issues
Misaligned jack screw holes on a compressor
package
22SQ Surveillance Issues
Heavy hose on cable tray poor packing for
shipment
23SQ Surveillance Issues
Inadequate supports for a heavy air-conditioner
24SQ Surveillance Issues
Insufficient space for jack screw poor design
25SQ Surveillance How you can help.
- Identify and highlight deviations during bid
clarifications - Improve quality schedule of your document
submissions - Manage your sub-suppliers advise Bechtel of a
First time supplier - Increase inspection resources on the shop floor
- Communicate, Communicate, Communicate
26New!
27Supplier Portal Update
Now have the ability to sort by business unit
and/or country
28Supplier Portal Update
For a comprehensive OGC Project Listing
29Supplier Portal Update
Click on Projects to get OGC Listing
30Next Forum
- Next Forum will be
- March 6, 2006
- 900 to 1100
- Bldg. 3000, Room 4C 4D
- _______________
- Check Web Page for
- Updates
31